To improve the billing quality, it becomes important to capture the reading & status accurately,
validate it rigorously, and follow up on the actions required against the status reported by the
Readers.
2
BSES LEARNING SERVICES
Pre-Billing
Meter Reading to Bill Delivery: 15 days cycle Audit
[ 2 / 8 days]
Legend:
[ Days for the activity / Cumulative days]
Bill Audit Team Revenue Cycle Management Department Division Bill Processing Unit
Two Meter Reading Instruments (MRIs) are currently used for meter reading:
¾ Computerized Meter Reading Instrument (CMRI) – can be loaded with up to 9 Area
Codes
¾ Programmable Display System (PDS) – can be loaded with up to 4 Area Codes
3
BSES LEARNING SERVICES
In case of downloading, meter number preloaded on MRI is not matched with that
downloaded at site, resulting in reading being downloaded against wrong meter; this is
captured and rechecked at Edit list generation stage
• Readers report meter status (and exceptions thereof) using 15 mandatory codes and 32
optional sub-codes with no built-in correlation between the two, resulting in the need to
scan entire list of sub-codes for each mandatory code
• On violation of validations, CMRI/PDS does not enforce acknowledgement, and may get
ignored, as reader can proceed on being prompting for an alert simply by pressing one
key (‘Enter’ for CMRI and ‘A’ for PDS)
• In case of ‘C’ remark (meter change), Meter Number entry is optional.
• Data not relevant to consumer category (under 10kwh load with single phase meter) is
also asked on MRI, eg, KVARH, KVAH, number of meters in the box in for the
individual consumer, Meter type, etc
• Exceptions related to electronics meters are not covered in current set of codes, eg, no
display due to outage in area, display error, indication of Earth Leakage, reverse power,
neutral cut)
Fig 2
Fig 3
5
BSES LEARNING SERVICES
1. Hide the original reading in case of warning of High/ Low/ Negative/ Zero consumption,
so that Reader has to re-enter the reading to confirm it. Only identical reading (with a
tolerance of +1) will be accepted by MRI as confirmation of the reading beyond norms.
2. In MRI, make downloading the default option in case of electronic meters and manual
punching the default option in the case of electromechanical meters, with toggle facility.
In case the reader opts for manual punching for an electronic meter, the reader to be
prompted with a message sensitizes him to this fact.
3. Reader should capture Occupancy Status (Y/N) in case of zero consumption.
4. While the primary codes are mutually exclusive (i.e., Reader can select only one code for
a given consumer/ meter), there may be cases with potentially multiple observations
applicable to the same meter, e.g., a new meter is installed and has been disconnected. To
handle such cases, a standardized order of precedence for all primary codes has been
developed and the display from top to bottom is in the same order.
5. Multiple choice of secondary codes will be allowed for primary codes ‘Obstacle’, ‘Meter
Defective’ & ‘Meter Changed’
6. Multiple choice of tertiary codes will be allowed for ‘Seal Not Ok’ & ‘LED Indication
On’.
7. Replace the word ‘Binder’ with ‘Area Code’
8. Scroll facility will be made available for all (fresh & pre-billing audit) cases in MRI to
allow reader to plan his visit better
6
BSES LEARNING SERVICES
9. Cases highlighted as exceptions in the Pre-billing audit will be displayed to the reader on
MRI in a separately identifiable format to facilitate planning of site-revisits; search screen
should include option for searching only the pre-billing audit cases. Flexibility will be
given to allow allocation of revisits to any reader – either the reader who went to that
cycle for fresh readings, or any other reader.
1. LED OFF
1. LED ON
1. Earth Leakage
2. Neutral Cut
3. Reverse Power
Reader will have to compulsorily choose at least one option before being allowed to
enter/download reading.
19. Round Complete is to be removed entirely from MRI, because the DDC/AMPS team
would be in a better position than the meter reader to judge whether it is a round
complete case or not based on historical data available on the system (which is not
available in the field/MRI). All round complete cases would be recorded by the meter
reader as “negative consumption OK” cases, ie, without “C” remark. This would be
filtered at the pre-billing audit stage so that the DDC/AMPS can take a decision on
whether it is a round complete case or not, based on:
7
BSES LEARNING SERVICES
8
BSES LEARNING SERVICES
1. About PDS:
It is micro controller based.
It is having total 64 Kb program memories and 4MB data memory.
No operating system and file system is available.
It is having 4x20 line display i.e. 4 four rows. Each row is having 20 columns.
Key pad is having total 30 keys.
2. System Requirements
A. Software Requirements
C51 compiler
ATMEL Flip Program loader.
Data Download and upload Program. (This is developed in VB6.0)
B. Hardware Requirements
Programming cable.
Data cable.
PDS Unit.
PC which is having Comport.
3. MRI-PC Interface Details:
) Downloading Data From PC to PDS
Data will be downloaded from PC to Pds. This data is available in the form of
text file (known as Form Y).This data is downloaded through PDS
Communication program. This interface is developed in Visual Basic 6.0.
This interface will have capability of downloading data as well as uploading
of the data from PDS to PC. This interface will download the date and time
from server and then the local PC time and date is synchronized with then
downloaded date and time.
This interface will receive the data from PDS to PC and saves the file in
C:\PDS-Data folder
This is capable of showing Current System Date and Time.
It checks the PDS software Version. If the Software version is mismatched
then it will display “Version mismatch” in Status bar of the interface.
11
BSES LEARNING SERVICES
Interface Preview:
Figure:1
In this screen you can observe the server Date and time.
After Displaying the Server’s date and time the Local system is synchronized with
Server Date and Time.
If the server is not connected then it will show the local system date and time.
If the Server is not connected then local system remains the same as before.
Before downloading the data from PC to PDS, the PDS is synchronized with PC time
and date.
In this interface you can see the File details like capacity and Created date, time and
no of records available in that file.
Communication settings are:(57600,n,8,1)
Baud rate: 57600
Parity: None
Data Bits: 8
Stop Bits: 1
12
BSES LEARNING SERVICES
For downloading data from PC to PDS, First browse the file to download or Drag the
file and drop interface. Then Click the PC to PDS button.
To Upload data from PDS to PC click button PDS to PC and then ready PDS to
transmit Data..
During uploading data from PDS to PC, Interface checks the file in the “C:\PDS-
Data” folder. If the file is available in that folder, then it will show “File already
exists. Do you want to overwrite or not”.
If you select the YES button then the file is overwritten
If you select the No Button then it terminates the communication.
The uploaded files are available in “C:\PDS-Data” Folder.
13
BSES LEARNING SERVICES
1. Edit list is not generated daily, but generated once all meters for given ‘Area-code’ are
read.
2. Practically ‘Edit list’ & ‘Pre-audit list’ are attended on site at same time.
3. Data entry (post revisit) into RCM is carried out manually, without applying any
validation rules.
4. No tracking of MRI IDs at the time of revisits.
5. Pre billing audit, 19 different criteria based list is generated for checking. About 6 are not
used normally. Some criteria generate repetitive output, which results into either
duplicate field visits or being ignored.
6. In some validation criteria, user is allowed to select value by overwriting default values.
7. Edit’ & ‘Pre-audit’ is attended by DDC (Division)
8. Duplicate field efforts one for ‘Edit list’ & another for ‘Pre-audit list’. OR sometimes
both lists are attended on field, same time.
9. ‘Not read cases’ are not trapped in ‘Edit’ but in ‘Pre-audit’.
Timing At the time of End of each End of cycle End of cycle End of cycle End of cycle
reading reading day reading reading reading billing
After bill
Prior to bill processing processing
Current
Reading & Reading & % OK Readings Reading & Current
Parameter Consumption
Current Current % Downloads Current Consumption Amount
Consumption Consumption Consumption
Units &
Units Rupees
14
BSES LEARNING SERVICES
• Rationalize number of stages for validations based on value added by each successive stage, ie, either check
is performed by different entity / system, or at a different stage / milestone, or different checks are applied
• Accordingly, the following to-be process is recommended:
Billing
• Shift validations to the origin of information with greater strictness exercised on the source itself, so that
questionable data is pre-empted from entering the system itself. Accordingly, norms should be strict at MRI level
itself, as it requires just a few extra seconds for the reader to confirm the reading at site.
• Make validation criteria objective so as to automate their administration, leaving no scope for user’s discretion
• Fix accountability across the line from Reader to Division management to Central management (RCM to Post-
billing Audit) by establishing audit trail
• Measure the reading quality against the same parameters and reference values with increasingly liberal
norms across stages
• Responsibility for execution should rest entirely with the field level execution agencies, eg, Divisions. Centralized
agencies (eg, RCM dept, audit / hold team) should primarily focus on:
• Monitoring the quality of execution at the field level
• Back end data analysis to facilitate informed decision making and actions by the execution agencies
• To keep the workload manageable, projected % of exceptions to be highlighted in validations should up to:
• 20% prompt on MRI for reader to react
• About 10% revisit for Pre-audit cases (% of refined MRI data)
15
BSES LEARNING SERVICES
Analysis of
Meter reading Generate Editlist
Meter reading Pre-billing Audit
using MRI & attend
data by RCM
[ 5/5 days ] [ 2 / 8 days]
[ 1 / 6 days]
To Be
• Day to day control over MR performance, as daily reading data upload at DDC
• Daily resolution of abnormal meter reading, hence more time for resolution; this is also wrt earlier
billing details (like previous reading, pending meter change, wrong reading, etc)
• ‘Cycle-block’ for 7 days against 9 days in As Is, hence more days available for making BAM
correction & meter change entry to Customer Care, MMG, etc
• Step forward for daily cycle/billing
Analysis of
Meter reading Pre-Billing
Meter reading -------
using MRI Audit
data by RCM
[ (5+2) / 7 days ] [ 0 / 0 days]
[ 1 / 8 days]
Pre-Billing
Audit
Meter Reading to Bill Delivery: 15 days cycle
[ 2 / 8 days]
Legend:
[ Days for the activity / Cumulative days]
Bill Audit Team Revenue Cycle Management Department Division Bill Processing Unit
16
BSES LEARNING SERVICES
1. Revisits on account of pre-billing audit will also be conducted using MRIs by the same
reader, and such re-readings will be subjected to same MRI validations. Such cases will
be loaded daily on MRI in a separately identifiable format. Only if the same reader is not
available, the revisit cases will be assigned to alternative readers.
2. Readings will be downloaded daily from MRI to RCM system for both fresh and pre-
billing audit cases, as against the current practice of completing one Area Code.
3. Since Editlist and Pre-billing Audit stages will be merged, the entire reading data for a
particular cycle will be sent to RCM dept only after completion of the merged Pre-billing
Audit. “Cycle lock” will be initiated only after this, ie, at the start of billing process.
4. List of all violations during pre-billing audit will be generated indication of the particular
validation(s) violated, as against the current system of running individual validation
checks separately with separate output lists. Against these highlighted cases, provision
will be made to highlight ‘Action(s)’ (eg, revisit, BAM correction, meter change entry,
etc) from a standard set of actions. This will then be used for monitoring and follow up at
various levels and across entities, with provision for alerts in case of unattended cases.
5. MIS on pre & post validation scenario for each validation levels will be generated.
High consumption
Consumption MRI Pre-Audit Post-Audit Validation
range (PC) Code
Zero >100 units >1000 units -- H1
17
BSES LEARNING SERVICES
Low consumption
Consumption MRI Pre-Audit Post-Audit Validation
range (PC) Code
Zero -- -- -- L1
1 to 100 -- -- -- L2
101 to 300 -- -- -- L3
4. Negative consumption
1. ‘Error message’ on MRI - - “CUR RDG < PREV RDG” NC
2. Screen do not display earlier enter reading, reader to re-enter reading
3. Not to validate for ‘Downloaded reading’
18
BSES LEARNING SERVICES
Note: -
MR - Meter reader
2. Low consumption
1. Validation rules are as per Annexure – 6 L1, L2, . . . L8
2. Not to include ‘Downloaded reading’ for revisit, but attend indoor check
3. Negative consumption
1. Negative consumption with status ‘Not C‘ NC
2. Not to include ‘Downloaded reading’ for revisit, but attend indoor check
6. Reading Date
1. Difference between Reading date & actual date is >0 days. RD1
RD2
2. Difference between Reading date & actual date is < (-10) days.
19
BSES LEARNING SERVICES
-
High consumption ID OD Y Y N
Low consumption ID OD Y Y N -
Consumption ID ID Y Y N -
Against TD/PD
ID – Indoor check
OD – Out door check
Negative consumption AMPs/DDC Review previous consumption profile. If found 'Round complete' enter status code as
'R'.
MR - Re-read meter reading. Enter reading/status in MRI
AMPs/DDC Review previous consumption, If found over-read, initiate BAM correction.
TD/PD
Not read meter MR - Reread meter reading, Enter reading/status into MRI.
Reading date AMPS/DDC If date found wrong, Correct system (PC) & MRI time-date, make correction against
reading date of data.
Note: -
MR - Meter reader
DDC – Divisional Data
center in-charge
20
BSES LEARNING SERVICES
ii Reading not taken cases having the following code combinations (are expected to give a reading
on revisit):
Prim ary Tertiary
Secondary Code Reading
Code Code
Meter
Any Any No Reading
Changed
Meter
Seal Not O K Any No Reading
Defective
Obstacle Meter Box Locked Any No Reading
Reading Refused by
Obstacle Any No Reading
Custom er
Obstacle Other Obstacles Any No Reading
Not Read Any Any No Reading
21
BSES LEARNING SERVICES
Normal
Reading Reading
(Fresh) Reading / Status
Scenario during 1st during 2nd
Reading / finally forwarded to Optional revisit
# revisit on Pre- revisit on Pre-
Status EBS billing engine
billing Audit billing Audit
captured
R1,
violating
9 NR1 R2 R2
pre-billing
audit
NR2, if previous 2
bills were not
R1, Optional revisit
Provisional
violating allowed to
10 NR1 NR2 R1, if the previous 2
pre-billing obtain R2 if
or m ore bills were
audit possible
Provisional as
decided by user
Legend:-
1) “NR” = No Reading, ie, reading = blank, meter / reading status recorded on MRI
1) NR1 = Blank reading & meter / reading status captured in 1st attempt
2) NR2 = Blank reading & meter / reading status captured in 2nd attempt
2) “R” = Reading; R1 = Reading in 1st attempt, R2 = Reading in 2nd attempt
22
BSES LEARNING SERVICES
Follow up Process
MIS enabled
Entity responsible monitoring
Action for action mechanism
• Actions are generally understood • Responsibilities may have shifted • Inadequate IT mechanisms to
but may not be documented as across entities frequently in recent capture and track pendency
an updated organisation policy past may result in lack of control in
the hands of monitoring entity
• Even where policy is documented • Inadequate hand-off processes
and updated, practices may vary between entities may dilute • Inadequate automation in job
across Divisions / Circles with accountability creation and prioritization may
reasons specific to the realities of result in unfocused
that area • Inadequate SLA mechanism may not implementation by the
have fostered a culture of internal execution entity
“customer” & “service-provider”
Follow up Process
MIS enabled
Entity responsible monitoring
Action for action mechanism
23
BSES LEARNING SERVICES
Page 1
MMG Dept
ENF
Division Data MMG
DDC
Centre
REC
MMS
Recovery
Dept
• MIS to include status of jobs and their resolution timelines (code wise, sub-code wise, MMS module will be accessible to all user
department wise, age-wise etc) groups: Division BMs, senior management,
• Provision to generate reminders / escalations based on agreed internal SLA’s and etc. All MMG jobs from CCM / PSM / RCM
DERC timelines available in MMS & job allocation / status
• All jobs automatically get closed in all source modules (eg. CCM, PSM & RCM) also captured
• At start, all MMG jobs appear as pending
• Reason (if any) for non-execution of jobs captured with time stamps
•Vendor performance management
© Accenture 2005 All Rights Reserved –Proprietary and Confidential
24
BSES LEARNING SERVICES
Negative consumption
ROUND ROUND Circle co- Replace all electromechanical meters with
3 cases, and meter reading Circle - MMG
COMPLETED COMPLETED ordinator electronic, Post MCR data into EBS
has crossed '999999'.
25
BSES LEARNING SERVICES
26
BSES LEARNING SERVICES
27
BSES LEARNING SERVICES
28
BSES LEARNING SERVICES
29
BSES LEARNING SERVICES
30
BSES LEARNING SERVICES
STATUS
o OPEN
o CLOSED
o REJECT
31
BSES LEARNING SERVICES
User Manual
After Switching on the PDS the following screen will appear:
F1 – REGULAR READING
F2 – PRE AUDIT
If you select regular reading then the following screen will appear:
F1 – AREA CODE1
F2 – AREA CODE2
F3 – AREA CODE3
F4 - AREA CODE4
If you select an Area code then the following screen will appear:
1. Search Menu:
F1 – Newkno \ 5. SQ.no
F2 – Oldkno \ 6 .C.Bndr
F3 – Meter no
F4 – Search Next
New KNO. is
NKNO: 2630J8050474 X1,X2,….,X12.You
OKNO: 4NA1511240369 can search by
punching the last
MN: 12462302 C: DX seven digits i.e.
SQ: LXPNA09649AA X6,X7….,X12.
It will display the consumer details i.e. Newkno, Oldkno, Meter number,
Sequence number and Meter category. If it is not found, the following message will prompt:
Searching by Old
KNO. can be done NKNO: 2630J8050474
leaving the last OKNO: 4NA1511240369
digit by entering:
1.Last 4 digits i.e.
MN: 12462302 C: DX
X9,…,X12. SQ: LXPNA09649AA
2.Last 6 digits i.e.
X7,…,X12.
33
BSES LEARNING SERVICES
For searching by
NKNO: 2630J8050474 this field, leaving
the last two
OKNO: 4NA1511240369 characters enter the
MN: 12462302 C: DX last five characters.
SQ: LXPNA09649AA i.e. X6,X7,..,X10.
After Displaying the consumer Details, press the Enter Key to punch or download. Then the
following screen will appear.
Select the meter LED status. If the meter LED status is OFF, then press enter to continue.
If you want to select LED On status then select the LED ON, then the following screen will
display:
LED ON
F1 – EARTH LEAKAGE < >
F2 – NEUTRAL CUT <>
F3 – REVERSE POWER < >
In this screen you can select one or more the three led status. After selecting status then press
ENTER key. After that the following screen will appear.
LED INDICATION
F1– LED OFF
F2 – LED ON <*>
Then Press ENTER key. You will get the following screen.
SELECT
F1 – KAIFA
F2 – GENUS
F3 - PUNCH
Select the Meter Make .If you select the Kaifa meter. The following screen will appear.
34
BSES LEARNING SERVICES
MTR: KAIFA
GENUS METER
After selecting meter make, press enter to read the meter then it will read the meter, then it will
compare the meter number with meter number against the consumer. If it is same the save menu
will be display. If it is not found, then search the download meter number within the binder, if it
is not found, then save the record, otherwise the confirm meter number screen will appear. In this
screen confirm meter number and wrong meter number options would be available. If you select
the confirm meter number option then
it will save the record. If you select the wrong meter number option then you will get the search
screen.
EBS: 12394033
OSM: 123494033
F1 – CNFRM. MTR CHNAGE
F2 – W.MTR, F3-MTR CRR
If you confirm meter number change then the particular meter number is compared with other
meter numbers in same binder. If a downloaded meter is found with in the same binder then the
following screen will appear.
NEWKNO: XXXXXXXXXXX
MNO: 12394033 FOUND
AT CMNO: 12394033
1-CONFIRM 2.EXIT
Manual punching:
35
BSES LEARNING SERVICES
F1 – DIRECT THEFT
F2 – EXTRA METER
36
BSES LEARNING SERVICES
Exception Codes:
Tertiary-
code Detailed
Primary Sub-Code descripti Condition on
Code Description on Field Code S.C. T.C.
1 OK OK Everything is Ok Y OK
New meter no.
METER METER
2 found for given k
CHANGED CHANGED
no. at site C MC
Negative
consumption
ROUND ROUND cases, and meter
3
COMPLETED COMPLETED reading has
crossed
'999999'. R RC
Temporary'
PREMISES
defined as lock
4 NOT READ LOCKED
period within
(TEMPORARY)
billing cycle N LT
Permanent'
PREMISES
defined as lock
5 NOT READ LOCKED
period more than
(PERMANENT)
billing cycle N LP
ADDRESS NOT Address not
6 NOT READ
TRACEABLE traceable/found N NA
Address found
METER NOT
7 NOT READ but meter not
TRACEABLE
traceable/found N NM
No supply in the
NO POWER
8 NOT READ area, No display
SUPPLY
of meter reading N NS
Meter cabin/box
found locked so
that either
METER BOX
9 OBSTACLE reading cannot
LOCKED
be taken, or can
be punched but
not downloaded O BL
Reading not
READING
allowed by
10 OBSTACLE REFUSED BY
customers/societ
CUSTOMER
y. O CN
Meter installed at
METER AT unreadable
11 OBSTACLE DIFFICUT position.(High,
POSITION low, in the
corner) O MH
Any other
OTHER
12 OBSTACLE obstacle not
OBSTACLES
covered above O OB
Meter found
burnt/smoky/spa
METER DIRECT rks
13 METER BURNT
DEFECTIVE SUPPLY noticed/terminal
wire burnt with
direct supply D MB DSF
37
BSES LEARNING SERVICES
Tertiary
Detailed
Primary Sub Code Code
Condition on
Code Description Descriptio
field
n Code S.C. T.C.
Meter found
burnt/smoky/spa
METER
NO DIRECT rks
14 DEFECTIV METER BURNT
SUPPLY noticed/terminal
E
wire burnt with
no direct supply D MB NDS
METER Meter glass
15 DEFECTIV GLASS BROKEN found
E broken/removed D GB
Meter body seals
missing/broken,
METER Hologram
BODY SEAL
16 DEFECTIV SEAL NOT OK missing/broken,
NOT OK
E Ultrasonic
welding seal
broken D SN BSN
Meter terminal
METER TERMINAL
missing, terminal
17 DEFECTIV SEAL NOT OK SEAL NOT
seal
E OK
broken/missing D SN TSN
METER
BOX SEAL Meter box seal
18 DEFECTIV SEAL NOT OK
NOT OK missing/broken
E D SN XSN
LED indication on
METER
LED INDICATION EARTH electronics meter
19 DEFECTIV
ON LEAKAGE for Earth
E
Leakage D LI IEL
METER LED indication on
LED INDICATION NEUTRAL
20 DEFECTIV electronics meter
ON CUT
E for Neutral Cut D LI INC
LED indication on
METER
LED INDICATION REVERSE electronics meter
21 DEFECTIV
ON POWER for Reverse
E
Power D LI IRP
Meter found
stopped,
creeping reverse,
reading unclear,
damaged, Figure
METER
STOPPED/OTHER upset, Hole in
22 DEFECTIV
DEFECTS meter, object
E
inserted in
meter, loop in
terminal box or
any other
defects, D OD
38
BSES LEARNING SERVICES
39
BSES LEARNING SERVICES
Department: Division:
No Factor Rating
1 Course Contents
(The training presented in a comprehensive and concise manner.)
________________________________________________________________
________________________________________________________________
2 Methodology
(The way in which the trainer has covered the entire modules using different tools
like group discussion, exercises, etc)
____________________________________________________________
________________________________________________
3 Coverage
(The training programme has covered all the relevant topics)
________________________________________________________________________
________________________________________________________
4 Confidence
(Rate your confidence, after the training, to work on real life environment)
________________________________________________________________
________________________________________________________________
5 Faculty Feedback (Please rate the faculty on a 5 Point Rating Scale)
40