19 Environmental quality
20 ENV1-B – Climate Action and Energy
34 ENV2-B – Water
43 ENV3-B – Materials and Recycling
52 Economic quality
53 ECO1-B – Operating Costs
63 ECO2-B – Risk Management and Long-term Asset Value
87 ECO3-B – Procurement and Operations
© DGNB GmbH 1
DGNB System – Buildings In Use criteria set Table of contents
VERSION 2020
PAGE CONTENTS
128 Appendix
129 List of criteria with Innovation Areas
129 List of criteria with Agenda 2030 bonuses
131 List of criteria with Circular Economy bonuses
132 Contribution of the DGNB Buildings In Use system to the SDGs
© DGNB GmbH 2
DGNB System – Buildings In Use criteria set Preface and introduction
VERSION 2020 PREFACE
Preface
Dear building owners and portfolio managers, dear building operations managers and users, dear DGNB auditors,
Climate action is gaining attention in the building sector – especially due to the large potential of reducing the
associated CO2 emissions. It is nothing new that buildings consume energy and therefore significantly contribute to
global CO2 emissions. Unfortunately, there is also nothing new to the fact, that despite this being a known problem,
hardly any instruments are available to date, which allow a systematic approach to existing buildings. Instead, the
renovation of existing buildings is equated to climate action, which unfortunately is a mistaken view. If there is no
targeted, holistic and building-specific approach to dealing with our building stock, a renovation measure cannot
properly be evaluated in terms of its effectiveness. In the worst case, the renovation does not result in CO2 savings,
but leads to more resources being consumed and money being spent.
This is exactly where the DGNB system Buildings In Use comes in. The philosophy behind it is: Transparent
knowledge about the building, its actual characteristics and use as well as consumption values are needed to be able
to make the right decisions. The overall objective of the certification system is to actively support building owners and
portfolio managers in optimising their existing buildings with an approach that enables to exploit all CO2 reduction
potentials and become future-proof in a verified process. In cooperation with the users, all potentials should first be
identified by optimising building operations before structural measures are taken. Operational optimisation is usually
more cost-effective and offers large savings potential. On this basis, further measures should be designed and
implemented in the building while considering the overall objective.
This DGNB certification system focuses on relevant topics for sustainable building operations in just nine criteria
without losing the holistic approach. It addresses ecological as well as socio-cultural themes, but also includes
economic aspects and risks. The criteria are mainly based on the management principle “Plan-Do-Check-Act”. The
application of the system ensures comprehensive transparency regarding the current building condition and its
operational processes, by also addressing, for example, the influences from its use.
Collecting and assessing relevant building performance data is a central component of the DGNB Buildings In Use
certification. The knowledge gained from the analysis of the real consumption and performance of the building, is the
basis for deriving appropriate improvement measures. Only by knowing the actual performance of a building, the next
© DGNB GmbH 3
DGNB System – Buildings In Use criteria set Preface and introduction
VERSION 2020 PREFACE
optimisation cycle can be reasonably planned and implemented. It is important to define how proposed measures
should be scheduled to fit best into the operations process and are cost-optimised at the same time. Ultimately,
initiating this process leads to a project-specific climate action roadmap, that triggers continuous improvement of
building operation, which then is verified by certification.
Therefore, the DGNB system for Buildings In Use is much more than a certification system. It is an optimisation tool
to make buildings future-proof and positively contribute to climate action. “Get started” is an important credo in
climate action – and this is exactly what this certification system enables by providing orientation and creating
transparency about the actual building performance, consumption and emissions caused by its use.
We want to thank everyone who supported us in the development of this new version of the system. All together, we
would like to see a broad application so that a more systematic approach and engagement with our existing buildings
becomes standard practice, and we can make much better use of existing potentials for more climate action.
© DGNB GmbH 4
DGNB System – Buildings In Use criteria set Structure of criteria
VERSION 2020 OVERVIEW
Structure of criteria
To increase the applicability of the DGNB system, the criteria are now presented in a more readable and user-
friendly manner. The new structure allows the user to gain an overview of the most crucial aspects. The impact of the
implementation of the criteria has been highlighted visually. Furthermore, the user gains a perspective of how the
criteria will develop in future. Technical aspects relevant for documentation during the certification process are de-
fined in the appendices. The following chapter is an exemplary depiction of a selected criterion.
Topic
Topic symbol
Criterion: acronym
Criterion: name
What is the objec-
tive of this criteri-
on?
What do building
owners and users
gain from imple-
menting this crite-
rion?
© DGNB GmbH 5
DGNB System – Buildings In Use criteria set Structure of criteria
VERSION 2020 OVERVIEW
Weighting of the
criterion in the
total score
Evaluation of build-
ing by means of pro-
ject-specific alloca-
tion of points
Name of indicators
with any other in-
formation to note for
evaluation purposes
Indicators, from
which points can be
chosen from differ-
ent options
Indicators, from
which points can be
added
© DGNB GmbH 6
DGNB System – Buildings In Use criteria set Structure of criteria
VERSION 2020 OVERVIEW
Key performance
indicators for sus-
tainability reporting
Reference between
the specific criterion
and criteria in other
DGNB schemes
Appendix A:
Contains detailed
description regard-
ing relevance and
methods of indica-
tors
Appendix B:
Lists documentation
required for certifica-
tion
© DGNB GmbH 7
DGNB System – Buildings In Use criteria set Structure of criteria
VERSION 2020 OVERVIEW
Appendix C:
Contains information
on any changes to
the criterion and cri-
terion versions
© DGNB GmbH 8
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 OVERVIEW
The following five sections provide an overview of the DGNB certification system Buildings In Use. This includes the
structure of the system, the overview of the criteria and their weighting, the DGNB award principles as well as
gerneral principles of the DGNB system.
© DGNB GmbH 9
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 BASIC STUCTURE OF THE DGNB SYSTEM
The structure of the DGNB system “Buildings in Use” is based on the well-known triple bottom line of sustainability,
dividing the essential aspects of sustainable building operation into the topics
environmental quality
economic quality and
sociocultural and functional quality
This structure corresponds to the basic structure of all other DGNB systems.
© DGNB GmbH 10
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 BASIC STUCTURE OF THE DGNB SYSTEM
© DGNB GmbH 11
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 THE DGNB BUILDINGS IN USE CERTIFICATE
The DGNB system Buildings in Use is rating buildings by using performance indices. The total performance index is
calculated combining three topics, taking their individual weighting into account. The platinum certificate is the most
prestigious award issued by DGNB.
A total performance index of 35% or more results in a DGNB Certificate in Bronze. For a performance index of 50%,
a DGNB Certificate in Silver is awarded. For a DGNB Certificate in Gold, the project must reach an overall perfor-
mance index of 65%, and for a total performance index of 80%, the DGNB Certificate in Platinum is awarded.
Note: In the Building in Use system, no minimum performance index per topic is required.
© DGNB GmbH 12
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 THE DGNB CLIMATE POSITIVE AWARD
The Climate Positive Award is awarded annually by DGNB to buildings, sites and districts, which meet the technical
requirements described below, and provide the corresponding documentation through the Buildings in Use certifica-
tion (Version 2020).
A building is considered as ‘climate positive’, if it avoids more greenhouse gas emissions during operation than it
emits by covering its own energy consumption. This leads to a net-positive effect for the climate in the overall sys-
tem. A climate positive building is a showcase for minimised building energy use, minimised plug-loads and low-
carbon supply systems. In addition, the generation and use of renewable energy is maximised to cover the remaining
needs, while excess energy is exported.
If carbon neutral building operation is achieved by off-site renewable energy procurement, such as green electricity
or biogas, minimum requirements for the building envelope must be proved. The use of off-site renewable energy
must be disclosed in the CO2 accounting, as well as the ‘self-generated fraction of consumed final energy’ and ‘real-
ised fraction of solar renewable potential’. For further information please refer to the DGNB publication ‘Framework
for carbon neutral buildings and sites’.
As ‘renewable power plants’, climate positive buildings play an active role in the energy transition through their highly
efficient use of self-generated energy on site and supply of carbon-free energy to others. Greenhouse gas emissions
caused by energy consumption during building opteration are balanced by the positive contribution of the building to
the surrounding system.
1. Documentation showing the negative annual CO2 balance according to accounting scope ‘operation’ with
measured data of one calender year.
2. Efficient use of energy to cover building energy consumption: For all buildings, the minimum requirements
from national energy regulation in 2014 or later, for the building envelope must be complied with. Alterna-
tively, if no national regulations exist, the minimum requirements from DGNB System New buildings, Ver-
sion 2020 / TEC1.3 – Quality of the building envelope, Appendix 1 can be applied
3. Cover annual energy consumption by on-site energy generation to a feasible extend.
4. In case of off-site renewable energy procurement: Compliance with minimum requirements according to the
DGNB publication ‘Framework for carbon neutral buildings and sites’, as well as transparency on delivered
quantities.
5. Documentation showing the key performance indicators ‘self-generated fraction of consumed final energy’
and ‘realised fraction of solar renewable potential’. For further information please refer to the DGNB publica-
tion ‘Framework for carbon neutral buildings and sites’.
© DGNB GmbH 13
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 THE DGNB CLIMATE POSITIVE AWARD
Documentation
Energy monitoring
Monitoring the energy consumption and generation is recommended in order to detect and optimise any
deviations from the regular operation of the building as soon as possible. The monitoring should be
supported by at least monthly data collection from heating, cooling and electricity invoices. Collecting the
data separated and disaggregated enables more focused optimisations if the target values are not met. It is
recommended to implement a technical monitoring according to REHVA Guideline 29-2019 “Quality
management for Buildings”. It is also helpful to implement a management system according to ISO 50001 or
via energy audits according to article 8 of the EU Energy Efficiency Directive .
© DGNB GmbH 14
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 GENERAL PRINCIPLES
General principles
The general principles for the application of the DGNB system are explained below.
The DGNB system Buildings In Use is independent of building type and usage profile. However, for the project
registration, the indication of the building’s primary use and, if applicable, secondary use is necessary.
The usage profile with the highest ratio of the overall area is described as the primary use. In mixed-used buildings,
where the ratio of the other use is < 15% (or ratio as defined by local GBC), the usage profile with the largest ratio is
referred to as the primary use. Buildings with another use, where the ratio is ≥ 15% of the total area, are to be classi-
fied as a mixed-used building.
For the Buildings In Use certification, the boundary of the site defines the system boundary (unless
otherwise stated in the individual criteria. For example in criterion SOC3-B, the context beyond the site is
included.)
All buildings submitted for conformity check by DGNB must comply with local legal regulations.
The DGNB system Buildings In Use (version 2020) does not have any knock-out criteria with minimum
requirements.
The proof of evidence must be documented according to the requirements described in the criteria.
Alternativly, the following options are permitted for proof of evidence:
Alternative evidence
The requirements of the criterion/indicator remain unchanged.
The criteria specify the required or permissible forms of documentation. The evidence can be provided in
other ways if the overall objective of the criterion/indicator has been achieved. Before submitting
documentary evidence in an alternative form, the proposed alternative form must be coordinated with the
DGNB certification body. The decision lies with the DGNB certification body.
Documentation for innovation areas
If a criterion for an indicator allows for an alternative solution in the form of an innovation area, the
corresponding indicator can be fulfilled by this solution. The overall objective of a criterion/indicator can thus
be met by a building quality that has not previously been described in this way in the criterion/indicator. The
decision lies with the DGNB certification body.
© DGNB GmbH 15
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 GENERAL PRINCIPLES
Evaluation points
DGNB has defined target values for each criterion. In each case, evaluation points are allocated for the achievement
of the specified targets.
Types of credits
The maximum number of points achievable is indicated for each indicator. Different types of credits are
available. The representation for options, addings, and bonuses is as follows:
Representation for option points (either / or):
© DGNB GmbH 16
DGNB System – Buildings In Use criteria set Evaluation and structure of the DGNB system
VERSION 2020 GENERAL PRINCIPLES
In five of the nine criteria of the Buildings In Use system, the “continuous improvement process” (also called the PDCA
cycle) is implemented. The PDCA cycle is an iterative process with four steps: Plan, Do, Check and Act. This man-
agement method is a universal model for optimisation and continuous improvement of processes.
In the criteria, the target variables should either be continuously improved (criterion ENV1-B Climate Action and Ener-
gy) or maintained at a defined target value (criterion ENV2-B Water, ENV3-B Materials and Recycling, ECO1-B Oper-
ating Costs and SOC1-B Indoor Comfort).
PLAN: The target agreement (target value) is defined for the respective criterion.
DO: The method and time-step of measuring data (actual value) is considered.
CHECK: The measured data is analysed: quantitatively by conducting a deviation analysis and qualitatively
by interpreting and plausibility check of the data.
ACT: If the target agreement is not met, measures and actions for optimising the operation must be
identified and selected for the next measurement period. Here, it is important that all relevant stakeholders
(owners – users – operators) are involved.
By applying the continuous improvement process in the PDCA cycle, the four steps Plan, Do, Check and Act refer to
different periods of time. The following overview gives a clear definition for the relevant time frame in the period
under review for both ”during building operation”, as well as “for the certification process”. For the Building In Use
system “period” is defined with three consecutive calendar years that follow the previous period without time gap.
ACT: If the defined target value was not met, it is required to work out a catalogue of measures and actions
for optimising building operation to meet the target value in future. These measures and actions are to be
implemented as soon as possible, to enable a rapid target achievement. There also might be measures,
that extend into the following years due to the complexity of the implementation process.
PLAN: Documentation of the target agreement for the next 3 years (including the current year).
DO: Documentation of the measured data of the past 3 years
CHECK: Documentation of the data analysis based on measured data of the past 3 years.
In addition, documentation of implemented improvement measures and actions of past 3 years.
ACT: If the target agreement was not met, documentation of improvement measures and actions of the past
3 years.
© DGNB GmbH 18
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 OVERVIEW
Environmental quality
All three criteria of the environmental quality evaluate the effect of buildings on the global and local environment
and their resource consumption and waste generation.
© DGNB GmbH 19
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
ENV1-B
Benefits
Carbon neutral building operating is an active contribution to reducing greenhouse gases and thus to climate
protection. By actively managing energy consumption, potentials for environmental optimisation can be detected,
which also will lead to cost savings.
© DGNB GmbH 20
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
Outlook
In near future, the evaluation of performance will be given a higher weighting. In addition, the evaluation of
supplemental metrics with focus on self-generated renewable energy is being considered for the future application of
the system.
© DGNB GmbH 21
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
ASSESSMENT
ASSESSMENT
The contribution to climate action and the reduction of energy consumption in building operation are evaluated in
both management and performance. In cooperation with all stakeholders, and by implementing a continuous im-
provement process, greenhouse gas emissions (hereinafter referred to as “CO2 emissions”) of the building are identi-
fied and actively managed. In total, 100 points can be achieved in this criterion, and with bonus points, a total of 140
points can be achieved. For buildings with carbon neutral operation, the indicators marked with * are met.
Note: The ‘Framework for Carbon Neutral Buildings and Sites’, published by DGNB in March 2020, provides a solid
background on carbon accounting rules and a process how to establish a building specific Climate Action Roadmap to
carbon neutral building operation. This publication is a key reference for the present criteria. DGNB provides a CO2-
calculation tool for documentation in this criterion.
Part 1: Management
NO INDICATOR POINTS
1 Plan
1.1 Target agreement (target value) max. 14
A target agreement for the annual CO2 emissions has been defined.
2 Do
2.1 Collecting data on energy (actual value) max. 35
Energy consumption data and grid feed-in data for the period under review is available.
© DGNB GmbH 22
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
ASSESSMENT
NO INDICATOR POINTS
3 Check
3.1 Data analysis max. 5
The collected data was analysed and summarised in a report and/or graphically presented.
A data analysis was conducted* 5
4 Act
4.1 Measures for optimising operation max. 14
Operational optimisation measures were made, based on
technical knowledge and through stakeholder dialogue in regular meetings +5
Alternatively: Target values determined in the target agreement for CO2 emission 14
balance were met.
© DGNB GmbH 23
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
ASSESSMENT
Part 2: Performance
NO INDICATOR POINTS
6. Evaluation of performance
The performance is evaluated by both an internal and external target value (dual
benchmarking). The data is documented and reported according to disclosure rules of the
‘framework for carbon neutral buildings and sites’ / Part 3 CO2-reporting.
© DGNB GmbH 24
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
REPORTING AND SYNERGIES
Sustainability reporting
NO KEY DATA / KPI UNIT
The results of the Life Cycle Assessment (LCA) calculated in criterion ENV1.1 can be taken into account in
the Agenda 2030 Bonus (Indicator 5). Moreover, the monitoring concept developed in PRO2.3 can be used
as basis when recording consumption data, thereby enabling better optimisation in operation.
© DGNB GmbH 25
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
I. Relevance
During a building’s life cycle, a large share of greenhouse gas emissions is caused by high operational energy
consumption during use stage. Buildings are responsible for approximately 40% of energy consumption and 36% of
CO2 emissions in the EU (Energy Performance of Buildings / European Commission). The energy consumption in
building operation can and must be substantially reduced with available technologies and organisational measures,
in order to reduce greenhouse gas emissions and significantly contribute to implementing the Paris Climate Action
Agreement.
III. Method
Part 1: Management
Indicator 1: Plan
The target value is based on data from several comparable buildings (at least 10 buildings) or on a
technically innovative building model (plausible representation of the model characteristics is required).
The target value is determined by a climate action roadmap according to the ‘framework for carbon neutral
buildings and sites’ or the building is operated carbon neutral.
The level of ambition for setting the long-term target value is evaluated while taking restricting factors into account:
1. Legal restrictions (e.g. monument protection, legal building provisions, …)
2. Economic restrictions (e.g. Life Cycle Cost (LCC) calculations show no economic viability until 2050, …)
3. Structural restrictions (e.g. usable area for solar energy fully exploited, extraordinary and unchangeable shading of
the building, etc.)
© DGNB GmbH 26
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
Ambition level 1:
Target value: There is an energy/CO2-emission target for 2050
Indicator 2: Do
This indicator evaluates how energy consumption data is recorded and collected. The responsible person for
collecting the energy consumption data is pointed out among the relevant stakeholders. The quality of the data
collection distinguishes between the level of detail in which the energy consumption is recorded (annual, monthly or
continuous monitoring/recording) and the quality of data transfer (reading from utility invoices, meter reading, digital
recording). Based on the data collection, the responsible person calculates the building’s annual energy consumption
and associated CO2 emissions (actual value).
If data is missing or cannot be collected for partial areas, an alternative substitute calculation is permitted. The
substitute calculation should be based on country-specific, plausible energy data provided by the local Green
Building Council (reference energy data). For Germany, and areas with similar climatic conditions, energy data in
Appendix 1 can be used for the substitute calculation. The reference energy data is based on ’separated specific
values/partial energy parameters’ provided by the Institut Wohnen und Umwelt (IWU), Darmstadt / Germany.
If country-specific reference energy data is used as part of the substitute calculation methodology, this must be
communicated with DGNB for validation.
Note: The use of reference energy data for the substitute calculation is reflected in the data quality index (see section
“Additional information” below).
Indicator 3: Check
© DGNB GmbH 27
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
Indicator 4: Act
Measures can be identified based on technical knowledge, literature, stakeholder dialogue and suggestions
from the operation management team. To derive improvement measures for future target achievements, the
relevant stakeholders meet regularly (minimum 1x annually) to exchange information. Further information is
obtained from the opportunity and risk analysis (ECO2-B Risk Management and Long-term Asset Value)
with the evaluation of the condition of the building (Indicator 2), user requirements (Indicator 3) and
environmental risks on the site (Indicator 4).
Calculation models offer an objective and project-specific approach to evaluate different variants. There exists both
simple calculation models and comprehensive software solutions to cover different degrees of complexity in
optimising building operation processes. The complexity increases when considering transient dynamics with the
impact of weather, building usage and occupancy profiles. Which calculation model and which degree of complexity
is appropriate for the individual task depends on the respective ambition to map realistic building operation processes
including all variations of influences for a holistic optimisation. For example, for optimising water consumption, simple
Excel calculations may be enough, while for optimising transient heating/cooling loads, a customised energy
calculation or dynamic simulation might be appropriate.
Valuable insights can be obtained from evaluating different variants using suitable calculation models with
standardised settings.
Further insights can be obtained by adapting the model parameters to the actual building operation. Based
on validated calculation models with an adaption of the operating time, technical equipment, occupancy and
usage profiles related to the actual building use, a realistic optimisation is possible.
Technical monitoring helps checking the performance of buildings and technical systems. The objective is to
achieve and maintain an economic, efficient, functional and demand-based building operation by recording
relevant cross-trade operational data.
The objective is a holistic optimisation of the building operation. Therefore, the competing objectives of
comfort, energy and cost optimisation should be considered. The evaluation of the results of variant
assessments and selection of the optimisation measures should be carried out while considering and
balancing environmental, economic and social aspects.
Alternatively: Points can be achieved in this indicator, if the target values for the annual CO2 emission
balance were met.
© DGNB GmbH 28
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
Part 2: Performance
Indicator 6: Evaluation of performance
Performance is evaluated by assessing both an internal and an external target value (dual benchmarking).
In addition, the supplemental information is evaluated – see below chapter ‘Additional information’.
This indicator evaluates whether the internal (“own defined”) target value was met, or if not, whether an improvement
was achieved compared with the previous period (at least 1% improvement compared to the previous year).
If a climate action roadmap is defined according to the ‘framework for carbon neutral buildings and sites’, the internal
annual target value can be derived from the decarbonisation path. The internal annual target value is an absolute,
non-normalised value.
© DGNB GmbH 29
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
Additional information
The methodology mentioned above is developed on the basis of “Level(s) – A common EU framework of core
sustainability indicators for office and residential buildings – Part 3: How to make performance assessments using
Level(s)”. For application within the DGNB system, the basic Level(s) methodology has been retained, but in order to
make it easier to apply, the principles of performance assessment have been further specified (see Appendix 2 und
DGNB CO2-calculation tool provided for this criterion).
© DGNB GmbH 30
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 1: Plan
Climate action roadmap according to the ‘DGNB framework for carbon neutral buildings and sites’
Plausible documentation for target agreement definition
Relevant documents depicting the level of ambition / limiting conditions on the site
Indicator 2: Do
Relevant documents with energy consumption data and renewable feed-in data (utility invoices; readings of
the consumption meter and/or grid feed-in meter; annual overview, monitoring data)
CO2-calculation tool provided by DGNB including all relevant project information and calculation input data
Indicator 3: Check
Indicator 4: Act
Relevant documents for evidence of the calculation of the Life Cycle Assessment (LCA)
Results of Life Cycle Assessment (LCA)
CO2-calculation tool provided by DGNB including all relevant project information and calculation input data
© DGNB GmbH 31
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
Energy Performance of Buildings, European Commission, (URL: https://ec.europa.eu/energy/topics/energy-
efficiency/energy-efficient-buildings/energy-performance-buildings-directive_en, 11.12.2019)
Buildings and Climate Change. UNEP. 2009
Framework for carbon neutral buildings and sites. DGNB. 2020
Tabula WebTool (URL: http://webtool.building-typology.eu, 17.06.2019)
Building data and tools (URL: http://bpie.eu/focus-areas/buildings-data-and-tools/, 17.06.2019)
Partial energy metrics of non-residential buildings (URL: http://tektool.iwu.de/download.php, 17.06.2019)
Level(s) - A common EU framework of core sustainability indicators for office and residential buildings – Part
3: How to make performance assessments using Level(s). JRC Science Hub. 2017
(URL: https://susproc.jrc.ec.europa.eu/Efficient_Buildings/docs/170816_Levels_EU_framework_of_building
_indicators.pdf, 25.03.2020)
Dual assessment of performance: Location Specific Criteria for Residential Buildings
(URL: https://www.climatebonds.net/standard/buildings/residential/calculator, 17.06.2019)
Dual assessment of performance: Location Specific Criteria for Commercial Buildings
(URL: https://www.climatebonds.net/standard/buildings/commercial/calculator, 17.06.2019)
Sustainable Development Goals Icons, United Nations/globalgoals.org
CRREM Decarbonisation Target Tool (https://www.crrem.eu, 11.12.2019)
© DGNB GmbH 32
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV1-B / CLIMATE ACTION AND ENERGY
APPENDIX
Appendix 1: Partial energy values (final energy) / TEK-Tool Version TEK 5.6
Institut Wohnen und Umwelt (IWU), Darmstadt
Space type Main use Heating Hot water Lighting Ventilation Cooling Plug-loads
kWh/(m²a)
© DGNB GmbH 33
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
ENV2-B
Water
Objective
Our objective is to maintain the natural water cycle and to minimise the consumption of the drinking water.
Benefits
By reducing the consumption of drinking water, the operational costs can be minimised. In addition, by using
greywater and rainwater, the building operation is independent from price fluctuations and availability.
© DGNB GmbH 34
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
Outlook
Especially in an international context, the topic of drinking water consumption and maintaining the natural water cycle
is becoming increasingly important. The DGNB will monitor developments and update the criterion accordingly.
Furthermore, an evaluation of the performance by benchmarking the building based on its drinking water
consumption can be added.
© DGNB GmbH 35
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
ASSESSMENT
ASSESSMENT
In order to evaluate drinking water consumption, the water management is analysed. In cooperation with all stake-
holders involved, and by implementing a continuous improvement process, the water consumption of the building is
monitored and managed. In this criterion, 100 points can be achieved in total, and with bonus points, 110 points can
be achieved. If the building operation management implements a closed water cycle, the indicators marked with * are
met.
Part 1: Management
NO INDICATOR POINTS
1 Plan
1.1 Target agreement (target value) max. 10
A target agreement for the annual consumption of drinking water has been defined.
2 Do
2.1 Collecting data on water (actual value) max. 35
Water consumption data for the period under review is available.
3 Check
3.1 Data analysis max. 5
The collected data was analysed and summarised in a report and/or graphically presented.
A data analysis was conducted.* 5
NO INDICATOR POINTS
© DGNB GmbH 36
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
ASSESSMENT
4 Act
4.1 Measures for optimising operation max. 25
Operational optimisation measures were made, based on
technical knowledge and through stakeholder dialogue in regular meetings +10
calculation models +5
use of greywater/rainwater +5
Alternatively: Target values determined in the target agreement for water were met. 25
Part 2: Performance
NO INDICATOR POINTS
5. Evaluation of performance
The performance is evaluated in accordance with the target agreement.
© DGNB GmbH 37
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
REPORTING AND SYNERGIES
Sustainability reporting
KPI 3 Water exploitation index (WEI+)/ Baseline water stress indicator [%]/ [-]
© DGNB GmbH 38
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
APPENDIX
I. Relevance
Water scarcity is and will increasingly be a challenge in the future, especially due to the effects of global warming.
Depending on the location and usage of the building, a building’s operation can be strongly influenced by the local
availability of water (“water stress”). By utilizing rainwater or greywater, and other innovative technologies, the
drinking water consumption can be minimised.
III. Method
Part 1: Management
Indicator 1: Plan
The target agreement is based on a target value, which was determined internally.
The target agreement is based on a target value, which was based on data from several comparable
buildings (minimum 10 buildings) or a technically innovative building model (plausible representation of the
model characteristics is required).
Indicator 2: Do
This indicator evaluates how water consumption is recorded and collected. The responsible person for collecting data
on water consumption is pointed out among the relevant stakeholders. The quality of data collection distinguishes
between the level of detail in which the water consumption is recorded (annual, monthly or continuously
monitoring/recording) and the quality of data transfer (reading from the utility invoice, meter reading, digital
recording). Based on the data collection, the responsible person calculates the building’s annual water consumption
(actual value).
© DGNB GmbH 39
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
APPENDIX
Indicator 3: Check
This indicator evaluates whether the collected data is analysed. There are two levels of evaluation:
1. Quantitative analysis by checking the variation between the target value and the acutal value, in order to identify if
the target value was met (Indicator 5).
2. Qualitative analysis by interpreting and checking the data for plausibility (effects of vacancy, occupancy density,
usage profile, etc.). The qualitative analysis provides a better understanding of the recorded data and an explanation
for specific influences and changes.
This indicator evaluates whether improvement measures, which were planned in the previous period under review,
were partly implemented or fully implemented. Alternatively, points can also be achieved if target values were met in
the previous period under review (and therefore no measures for improvement were planned).
Indicator 4: Act
Measures can be identified based on technical knowledge, literature, stakeholder dialogue and suggestions
from the operation management team. To derive improvement measures for future target achievements, the
relevant stakeholders meet regularly (minimum 1x annually) to exchange information.
Using calculation models for considering variants are the method to objectively determine project-specific
and effective measures. If measures are identified by applying calculation models, points can be achieved.
(Note: For optimising and selecting measures, e.g. the tool used in the DGNB New Buildings System
Version 2020 for criterion ENV2.2 Potable water demand and wastewater volume can be used.)
If greywater or rainwater is used in the building operation, points can be achieved.
The objective is a holistic optimisation of the building operation. Therefore, the competing objectives of
comfort, energy and cost optimisation should be considered. The evaluation of the results of variant
assessments and selection of the optimisation measures should be carried out while considering and
balancing environmental, economic and social aspects.
Alternatively: Points can be achieved in this indicator, if the target value for water consumption were met.
Part 2: Performance
Indicator 5: Evaluation of performance
If the water consumption in the building is mainly covered by a closed water cycle, i.e. only a minimal amount of
drinking water is drawn for consumption, bonus points can be achieved. This means that at least 95% of the water
used comes from recycled greywater or rainwater and not from natural drinking water sources. As documentation, a
reporting of the drinking water proportion is required (the share of reused/recycled water and natural drinking water,
respectively).
© DGNB GmbH 40
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
APPENDIX
APPENDIX B - DOCUMENTATION
I. Required documentation
The following list shows a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 1: Plan
Relevant documents depicting methods used for target definition for target agreement
Reporting of water exploitation index/baseline water stress indicator
Indicator 2: Do
Documentation of consumption data (utility invoices; readings of the consumption meter; annual overview)
Indicator 3: Check
Indicator 4: Act
Description of the water cycle with quantities and indication of the sources (including the share of natural
drinking water in the total water consumption)
© DGNB GmbH 41
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV2-B / WATER
APPENDIX
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
Water Exploitation Index: Use of freshwater resources in Europe, European Environment Agency (EEA),
(URL: https://www.eea.europa.eu/data-and-maps/indicators/use-of-freshwater-resources-3/assessment-4,
25.03.2020)
Baseline Water Stress, World Resource Institute (WRI), Aqueduct Country Rankings (URL:
https://www.wri.org/applications/aqueduct/country-rankings/, 25.03.2020]
Criterion ENV2.2 Potable water demand and wastewater volume, DGNB System New Buildings,
International Version 2020
Level(s) - A common EU framework of core sustainability indicators for office and residential buildings – Part
3: How to make performance assessments using Level(s). JRC Science Hub. 2017 (URL:
https://susproc.jrc.ec.europa.eu/Efficient_Buildings/docs/170816_Levels_EU_framework_of_building_indica
tors.pdf, 25.03.2020)
Sustainable Development Goals Icons, United Nations/globalgoals.org
© DGNB GmbH 42
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
ENV3-B
Benefits
By reducing waste production, operational costs are reduced. By separating waste into several fractions, recycling
rates are improved and cost savings are achieved.
Significant
© DGNB GmbH 43
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
Outlook
The recycling sector is continuously changing. DGNB will monitor the developments in the waste management sector
and adapt the criterion accordingly. Furthermore, to evaluate the operational performance of the building, a
benchmarking based on annual waste volume and recycling rates may be added.
© DGNB GmbH 44
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
ASSESSMENT
ASSESSMENT
In order to evaluate materials and recycling, the management of material use, waste and recycling is analysed. In
cooperation with all stakeholders, and by means of implementing a continuous improvement process, the waste gen-
eration and recycling rates are monitored and managed. In this criterion, 100 points can be achieved in total, and
with bonus points, 110 points can be achieved. If the building operation management implements a closed material
loop, indicators marked with * are met.
Part 1: Management
NO INDICATOR POINTS
1 Plan
1.1 Target agreement (target value) max. 15
A target agreement for the annual residual waste volume and separately collected waste frac-
tions has been defined.
The target agreement for the annual residual waste volume is based on a target value, which
was
determined internally 5
based on data from several comparable buildings or a technically innovative building* 10
2 Do
2.1 Collecting data on waste (actual value) max. 35
Waste volume data for the period under review is available.
Data for residual waste and separately collected waste fractions (recycling) are recorded
annually by copying the data from waste invoices* 25
monthly by copying the data from waste invoices* 30
In addition, the actual recycling rates from the disposal companies is requested* +5
3 Check
3.1 Data analysis max. 5
The collected data was analysed and summarised in a report and/or graphically presented.
A data analysis was conducted* 5
partly implemented 5
fully implemented 10
Alternatively: The determined target values were met in the last period under review.* 10
© DGNB GmbH 45
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
ASSESSMENT
NO INDICATOR POINTS
4 Act
4.1 Measures for optimising operation max. 25
Operational optimisation measures were made, based on
technical knowledge and through stakeholder dialogue in regular meetings +10
information to the buildings users on how to reduce waste generation and increase +5
recycling
implementation of incentive systems for reducing waste generation and increasing +5
recycling
a conscious selection of the waste-disposal company due to its proven recycling rates +5
Alternatively: Target values determined in the target agreement for waste were met.* 25
Part 2: Performance
NO INDICATOR POINTS
5. Evaluation of performance
The performance is evaluated in accordance with the target agreement.
© DGNB GmbH 46
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
REPORTING AND SYNERGIES
Sustainability reporting
If measures were implemented to inform users on waste volumes during building operation (PRO2.4), points
can be achieved in this criterion.
© DGNB GmbH 47
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
APPENDIX
I. Relevance
By reducing the amount of waste and increasing the recycling rate, resources can be saved and an active
contribution to circular economy is established.
Note: The term ‘residual waste’ refers to the sum of all waste, which due to contamination or mixing cannot be
assigned to any of the following waste fractions: Paper, metal, glass, organic/bio, wood, electrical scrap, hazardous
substances, etc.
III. Method
Part 1: Management
Indicator 1: Plan
This indicator evaluates the process of defining the target value for waste prevention and recycling rates as part of
the target agreement. The procedure includes consideration for annual waste quantity/volume and which fractions of
waste are to be collected and the associated recycling rates.
The target agreement is based on a target value, which was determined internally.
The target agreement is based on a target value, which was based on data from several comparable
buildings (minimum 10 buildings) or a technically innovative building model (plausible representation of the
model characteristics is required).
In addition, the target agreement determines which types of waste are to be collected separately (residual
waste such as paper, metal, organic/bio, etc.).
Indicator 2: Do
This indicator evaluates how waste quantities are recorded and collected. The responsible person for collecting data
on waste is pointed out among the relevant stakeholders. The quality of data collection distinguishes between the
level of detail in which the waste quantities are collected from invoices from disposal companies, either monthly or
annually. In addition, points can be achieved if the recycling rate from the disposal company is inquired. Based on
the data collection, the responsible person calculates the building’s annual waste quantities (actual value).
Indicator 3: Check
This indicator evaluates whether the collected data is analysed. There are two levels of evaluation:
© DGNB GmbH 48
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
APPENDIX
1. Quantitative analysis by checking the variation between the target value and the acutal value, in order to identify if
the target value was met (Indicator 5).
2. Qualitative analysis by interpreting and checking the data for plausibility (effects of vacancy, occupancy density,
usage profile, etc.). The qualitative analysis provides a better understanding of the recorded data and an explanation
for specific influences and changes.
This indicator evaluates whether improvement measures, which were planned in the previous period under review,
were partly implemented or fully implemented. Alternatively, points can also be achieved, if target values were met in
the previous period under review (and therefore no measures for improvement were planned).
Indicator 4: Act
Part 2: Performance
Indicator 5: Evaluation of performance
If the building operation conducts a closed material cycle with a recycling rate of 100%, points can be achieved in this
circular economy bonus indicator. For achieving the bonus points, it must be documented that no waste is produced
for disposal.
© DGNB GmbH 49
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
APPENDIX
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 1: Plan
Relevant documents depicting methods used for target definition for target agreement
Indicator 2: Do
Indicator 3: Check
Indicator 4: Act
Photo documentation
Documentation from meetings, e.g. notes, presentations, result documents
Relevant documents depicting information provided to building users
Relevant documents depicting implemented incentive systems (e.g. plans presented, photo documentation,
screenshots, etc.)
Plausible presentation of the process of selecting the disposal companies
Documentation of the material cycle with quantitative data and recovery streams
© DGNB GmbH 50
DGNB System – Buildings In Use criteria set Environmental quality
VERSION 2020 ENV3-B / MATERIALS AND RECYCLING
APPENDIX
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
Agreement of the Commission: 2000/532/EC (URL: https://eur-lex.europa.eu/legal-
content/EN/TXT/PDF/?uri=CELEX:32000D0532&from=DE) [Accessed on 24th March, 2020]
© DGNB GmbH 51
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 OVERVIEW
Economic quality
All three criteria of the economic quality evaluate the building for its long-term asset value and economic
efficiency.
© DGNB GmbH 52
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
ECO1-B
Operating Costs
Objective
Our objective is to continuously check the financial expenses in building operations and to identify cost-efficient
measures for future optimisations, based on a holistic approach of considering both economic, environmental and
social aspects.
Benefits
Operating costs account for a significant proportion of the total costs in a building’s life cycle compared to
manufacturing and maintenance costs. To manage an asset economically viable, resources must be continuously
optimised. However, the future capability and value retention of a property are linked to the societal challenge of
reducing climate change and adapting our buildings to its consequences. This will require structural and operational
changes, and it is necessary to develop processes and define roadmaps that identify the most cost-effective path for
the implementation.
© DGNB GmbH 53
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
Outlook
In the future, economic performance will be evaluated through benchmarking of the building’s operating costs.
© DGNB GmbH 54
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
ASSESSMENT
ASSESSMENT
To evaluate the operating costs, the management of costs is analysed. In cooperation with all stakeholders and by
means of the continuous improvement process, the operating costs are identified, and the agreed target value for the
property is achieved. In total, 100 points can be achieved in this criterion, and with bonus points, a total of 120 points
can be achieved.
Part 1: Management
NO INDICATOR POINTS
1 Plan
1.1 Target agreement (target value) max. 15
A target agreement for the operating costs has been defined.
The target agreement for the operating costs is based on target values, which
were determined internally 10
were based on data from several comparable buildings or data from a technically 15
innovative building or external benchmark data.
2 Do
2.1 Collecting data on costs (actual value) max. 15
Operating costs data for the period under review is available.
3 Check
3.1 Cost analysis max. 5
The costs were analysed and summarised in a report and/or graphically presented.
A cost analysis was conducted. 5
partly implemented 5
fully implemented 10
Alternatively: The determined target values were met in the previous period under 10
review.
© DGNB GmbH 55
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
ASSESSMENT
NO INDICATOR POINTS
4 Act
4.1 Measures for optimising operation max. 40
Operational optimization measures were made, based on
technical knowledge and through stakeholder dialogue in regular meetings +10
Part 2: Performance
NO INDICATOR POINTS
5. Evaluation of performance
The performance is evaluated in accordance with the target agreement.
© DGNB GmbH 56
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
REPORTING AND SYNERGIES
Sustainability reporting
The result of the determination of the building-related life cycle costs over the life cycle in ECO1.1 can be
taken as a target value for the operating costs. In addition, an optimised life cycle cost assessment results in
a better precondition. The operating cost forecast conducted in PRO2.5 can serve as the basis for the target
value setting.
© DGNB GmbH 57
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
APPENDIX
I. Relevance
Operating costs form a large proportion of a building’s lifecycle costs, and therefore significantly influence the overall
economic quality of a building. By determining target values, accounting and analysing operating costs
systematically, the potential to optimise specific cost drivers can be identified. The objective hereby is to structure
operating cost accounting and analysis, so that unnecessary and avoidable costs can be located.
III. Method
Part 1: Management
Indicator 1: Plan
Indicator 1.1: Target agreement (target value)
This indicator evaluates the process of defining the annual target value for operating costs as part of the target
agreement.
The target agreement is based on a target value, which was determined internally.
The target agreement is based on a target value, which was based on data from several comparable
buildings (minimum 10 buildings) or a technically innovative building model (plausible representation of the
model characteristics is required)
external benchmarks (based on standardised cost structure – see Indicator 2.2).
Note: It is recommended that the target agreement is aligned with a nationally accepted cost structure. This promotes
a structured methodology and allows for a standardised basis for assessing, especially when compared with external
benchmarks.
Indicator 2: Do
This indicator evaluates how operational costs are recorded and collected. The responsible person for collection data
on costs is pointed out among the relevant stakeholders. The quality of data collection distinguishes between the
level of detail in which the costs are collected (‘cost level’ 1 to 3) and the scope of costs considered (often called ‘cost
groups’ or ‘categories’).
For this criterion, as a minimum the following cost levels and categories should be considered:
Operating costs
• Supply and disposal costs
o Water
o Fuels, energy
© DGNB GmbH 58
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
APPENDIX
o Sewage
o Waste
• Cleaning and maintenance of buildings
o Exterior surfaces
o Interior surfaces
• Operation, inspection, servicing
o Inspection and servicing of structures
o Inspection and servicing technical systems
• Repair costs
o Structural repairs
o Repair of technical systems
Note:
Structure used here
cost level 1
• cost level 2
o cost level 3
It is assessed whether the operational costs are accounted for in a nationally accepted cost structure such as
ISO 15686-5, DIN 18960, ÖNORM B 1801-2, SIA 480, GEFMA 220, FM-Benchmarking, or comparable.
By accounting the costs based on a standardised methodology, a common base for evaluation and benchmarking is
facilitated.
Indicator 3: Check
This indicator evaluates whether the collected data is analysed. There are two levels of evaluation:
1. Quantitative analysis by checking the variation between the target value and the acutal value, in order to identify if
the target value was met (Indicator 5).
2. Qualitative analysis by interpreting and checking the data for plausibility (effects of vacancy, occupancy density,
usage profile, etc.). The qualitative analysis provides a better understanding of the recorded data and an explanation
for specific influences and changes.
Normalising the costs is useful for interpreting and analysing the costs for plausibility. By adjusting the costs
regarding the degree of occupancy and time of operation, and by correcting consumption costs (costs for heating and
electricity) for the building usage and weather profile, a comparison is enabled. To ensure comparability and
evaluation in relation to an external benchmark (Indicator 6), it is necessary to normalize the costs according to the
methodology used to determine the external benchmark.
This indicator evaluates whether improvement measures, which were planned in the previous period under review,
were partly implemented or fully implemented. Alternatively, points can also be achieved, if target values were met in
the previous period under review (and therefore no measures for improvement were planned).
© DGNB GmbH 59
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
APPENDIX
Indicator 4: Act
The identification and selection of measures for optimisation are evaluated in this indicator. The relevant
stakeholders (building owner, operator/facility manager and user/tenant) define responsibilities for the
implementation of resources.
Measures can be identified based on technical knowledge, literature, stakeholder dialogue and suggestions
from the operation management team. To derive improvement measures for future target achievements, the
relevant stakeholders meet regularly (minimum 1x annually) to exchange information.
Calculation models offer an objective and project-specific approach to evaluate different variants. There exists both
simple calculation models and comprehensive software solutions to cover different degrees of complexity in
optimising building operation processes. The complexity increases when considering transient dynamics with the
impact of weather, building usage and occupancy profiles. Which calculation model and which degree of complexity
is appropriate for the individual task depends on the respective ambition to map realistic building operation processes
including all variations of influences for a holistic optimisation. For example, for optimising water consumption, simple
Excel calculations may be enough, while for optimising transient heating/cooling loads, a customised energy
calculation or dynamic simulation might be appropriate.
Valuable insights can be obtained from evaluating different variants using suitable calculation models with
standardised settings.
Further insights can be obtained by adapting the model parameters to the actual building operation. Based
on validated calculation models with an adaptation of the operating time, technical equipment, occupancy
and ussage profiles related to the actual building use, a realistic optimisation is possible.
The objective is a holistic optimisation of the building operation. Therefore, the competing objectives of
comfort, energy and cost optimisation should be considered. The evaluation of the results of variant
assessments and selection of the optimisation measures should be carried out while considering and
balancing environmental, economic and social aspects.
Alternatively: Points can be achieved in this indicator, if the target values for the operational costs were met.
Part 2: Performance
Indicator 5: Evaluation of performance
Points can be achieved if the performance of the operational costs meet or undercut the external benchmark.
This indicator evaluates whether cost items are neutral, because either the building is operated climate neutrally or
has a closed water/material cycle.
© DGNB GmbH 60
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
APPENDIX
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 1: Plan
Relevant documents depicting target agreement of indoor comfort, user satisfaction survey and complaint
management
Indicator 2: Do
Indicator 3: Check
Indicator 4: Act
© DGNB GmbH 61
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO1-B / OPERATING COSTS
APPENDIX
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
ISO 15686-5:2017 Buildings and constructed assets - Service life planning - Part 5: Life-cycle costing
DIN 18960:2008-02 Utilisations costs of buildings
ÖNORM B 1801-2:2011-04 Project and object management in construction – Part 2: Follow-up costs for
constructions
SIA 480 Calculation of profitability for investments in building construction
GEFMA 220-1 Life cycle costing in FM - Introduction and basics
FM Benchmarking, www.fm-benchmarking.de
© DGNB GmbH 62
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
ECO2-B
Benefits
Information on the condition of the building, user requirements, environmental risks on the site, and simultaneously
analysing the potential for the creation of a climate action roadmap, builds a foundation to actively manage risks and
to develop cost-optimised change processes and action plan.
© DGNB GmbH 63
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
Outlook
-
© DGNB GmbH 64
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
ASSESSMENT
ASSESSMENT
The building condition, user requirements and environmental risks on site are evaluated. Based on this information
and combined with a potential analysis a climate action roadmap can be established. An action and financial plan is
evaluated. In total, 145 points can be achieved in this criterion, however, only a maximum of 100 points can be
counted.
2 Building condition
By managing the condition of building proactively, one obtains information for the building op-
eration and for managing the risks of the property.
3 User requirements
For sustainable building operation, a high commercial viability is crucial. User surveys and im-
plemented complaint management determine relevant information for optimising the building
operation according to the user’s needs and requirements as well as minimises tenant/leasing-
relevant risks.
© DGNB GmbH 65
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
ASSESSMENT
NO INDICATOR POINTS
© DGNB GmbH 66
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
ASSESSMENT
NO INDICATOR POINTS
Re 1 - 4 INNOVATION AREA as
1-4
Explanation: If measures, which enable proactive risk management and contribute
positively to the long-term asset value, are implemented, points can be awarded in
accordance with indicator 1-4.
Alternatively:
The building is operated carbon-neutrally. 40
© DGNB GmbH 67
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
REPORTING AND SYNERGIES
Sustainability reporting
NO KEY DATA / KPI UNIT
© DGNB GmbH 68
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
I. Relevance
By managing the building condition proactively, instead of reactively, one obtains valuable information to be used for
planning the building operation and managing risks. Information on the building condition enables taking well-
informed decisions, through which uncertainty of various risks can be avoided, e.g. cost risks through inefficient
building operation, increased operating costs due to inefficient building services, health damage due to harmful
substances, or cost increase due to time pressure in the repair of deficiencies and defects.
User surveys and complaint management provide important information about user needs and requirements. Without
this information, there can be uncertainty about a large number of risks, e.g. cost risks due to lower working
efficiency and motivation, increased personnel fluctuation, inefficient space availability etc.
Valuable information is also gained by analysing the environmental risks on site. Even though their intensity and
frequency are difficult to predict, knowledge about risks on-site may enable compensation measures to avoid
adverse effects.
Analysing the potential for optimisation of the building is recommended in the framework for “carbon-neutral buildings
and sites” for defining a climate action roadmap. Through the potential analysis, optimisation measures to enable a
carbon-neutral building operation can be obtained, which – in combination with economic aspects – will result in the
most cost-efficient pathway to carbon-neutral building operation.
The three elements are further expanded to achieve the target of a carbon-neutral building operation: (1) by applying
criterion ENV1-B Climate Action and Energy, (2) by analysing the potential for optimisation to define a climate action
roadmap in this criterion, and (3) in form of the climate action roadmap with reporting and documentation according
to the framework for “carbon-neutral buildings and sites”.
© DGNB GmbH 69
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
III. Method
Part 1: Oppertunity and risk analysis
© DGNB GmbH 70
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
© DGNB GmbH 71
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
© DGNB GmbH 72
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
Air quality
The air quality at the site is assessed in relation to traffic, which is the main source of air pollution. For this purpose,
measurements are taken to determine whether the particulate matter (PM10) and nitrogen dioxide (NO2) levels at the
site comply with the legal limit values.
For the evaluation of the particulate matter, the most up-to-date publicly available table from the World Health
Organization (WHO) can be used. For evaluation of the PM10 value, the country and city nearest to the project site
must be selected.
© DGNB GmbH 73
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
Particulate matter PM10 40 Emission limit value averaged over a calendar year for the protection of
Annual average human health
Particulate matter PM10 50 Emission limit value averaged over 24 hours for the protection of human
Daily average health with 35 permitted instances of exceedance per calendar year
Nitrogen dioxide 40 Emission limit value averaged over a calendar year for the protection of
NO2 annual average human health
Nitrogen dioxide 200 With 18 permitted instances of exceedance per calendar year
NO2
Max. 1-hour value
Radon concentration
The radon concentration in the indoor air is determined based on the requirements of the relevant local standards.
(Note: Limit values Q2 a7b listed in the WHO International Radiation Project (IRP) can also be considered). If the
radon ground air concentration is accurately assessed, points can be achieved. If the radon concentration exceeds
100 Bg/m³, appropriate remediation measures must be carried out in the building to prevent or significantly hinder
seepage of radon from the ground. The extent of measures depends on the extent to which this value is exceeded.
Outdoor noise
Outdoor noise comprises a combination of noise sources from the area surrounding the building: Noise from traffic,
business and industry, and from the rail and air traffic. Noise level maps or measurements that indicate the level of
noise exposure on the site can be used for classifying the noise level.
© DGNB GmbH 74
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
© DGNB GmbH 75
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
© DGNB GmbH 76
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
© DGNB GmbH 77
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
DGNB System New Buildings, Version 2020, SITE1.1 ”Local environment” [https://www.dgnb-
system.de/en/buildings/new-construction/criteria/local-environment/ , 28.05.2020]
EU regulation on fluorinated greenhouse gases / Regulation (EU) No 517/2014 on fluorinated greenhouse
gases. (URL: https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32014R0517&from=DE,
12.03-2020)
Framework for carbon-neutral buildings and sites, DGNB, 2020
Risk maps published by the European Spatial Design Observation Network (ESPON): www.espon.eu
External air quality (some examples from WHO-Website):
o https://gateway.euro.who.int/en/indicators/enhis_24-population-weighted-annual-mean-pm10-in-
cities/visualizations/#id=21390&tab=table
o http://www.who.int/airpollution/data/AAP_database_summary_results_2018_final2.pdf?ua=1
WHO International Radiation Project (IRP):
http://www.who.int/ionizing_radiation/env/radon/IRP_Survey_on_Radon.pdf
Sustainable Development Goals Icons, United Nations/globalgoals.org
© DGNB GmbH 78
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
Address: ____________________________________________________________________________
Not available
documents
documents
Not known
Analogue
information can be found
Digital
1 Documentation of building approval
© DGNB GmbH 79
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
Not available
documents
documents
Not known
Analogue
information can be found
Digital
4 Fire safety plans
© DGNB GmbH 80
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
O O O O O O
quite quite
very important important unimportant not important at all
important unimportant
O O O O O O
Public
Car Hybrid/electric car Carpooling Bicycle/E-bike On foot
transport
O O O O O O
5. Please evaluate your satisfaction with the thermal comfort in the building in summer and
winter.
quite not at all
quite satisfied
very satisfied satisfied unsatisfied dissatisfied satisfied
Room temperature
O O O O O O
in summer
Room temperature
O O O O O O
in winter
Humidity in summer O O O O O O
Humidity in winter O O O O O O
Draughts with
conditioning in O O O O O O
summer
Draughts with
O O O O O O
conditioning in winter
© DGNB GmbH 81
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
Room temperature O O O O O O
Humidity O O O O O O
Draughts
O O O O O O
with conditioning
very satisfied satisfied quite satisfied quite unsatisfied dissatisfied not at all satisfied
O O O O O O
very important important quite important quite unimportant unimportant not important at all
O O O O O O
© DGNB GmbH 82
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
13. Please evaluate your satisfaction with the possibilities of individual adapting the room con-
ditions.
quite not at all
very satisfied satisfied quite satisfied dissatisfied
unsatisfied satisfied
Light O O O O O O
Temperature O O O O O O
Air O O O O O O
Shading O O O O O O
© DGNB GmbH 83
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
14. How important is the ability to individually influence the room conditions to you?
quite not important at
very important important quite important unimportant
unimportant all
Light O O O O O O
Temperature O O O O O O
Air O O O O O O
Shading O O O O O O
15. Please evaluate your satisfaction with the quality of the space within and outside the build-
ing.
quite not at all
very satisfied satisfied quite satisfied dissatisfied
unsatisfied satisfied
Space quality of
interior (communi-
O O O O O O
cation areas,
common rooms)
Space quality
O O O O O O
outside
16. How important is the quality of the space to you in the building?
quite not important
very important important quite important unimportant
unimportant at all
Space quality of
interior (communi-
O O O O O O
cation areas,
common rooms)
Space quality
O O O O O O
outside
17. Please evaluate your satisfaction with the safety within and outside of the building.
quite not at all
very satisfied satisfied quite satisfied dissatisfied
unsatisfied satisfied
Safety within the
O O O O O O
building
Safety in the
outside areas /
O O O O O O
direct environment
of the building
© DGNB GmbH 84
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
19. Please evaluate your satisfaction with the accessibility within the building.
quite not at all
very satisfied satisfied quite satisfied dissatisfied
unsatisfied satisfied
Barrier-free access
O O O O O O
to the building
Barrier-free design
O O O O O O
of the building
21. Please evaluate your satisfaction with the site quality of the building.
quite not at all
very satisfied satisfied quite satisfied dissatisfied
unsatisfied satisfied
Transport links O O O O O O
Proximity to usage-
O O O O O O
relevant properties
Social
O O O O O O
infrastructure
© DGNB GmbH 85
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO2-B / RISK MANAGEMENT AND
LONG-TERM ASSET VALUE
APPENDIX
23. Please evaluate your satisfaction with the communication and interaction with the operator
and owner.
very satisfied satisfied quite satisfied quite unsatisfied dissatisfied not at all satisfied
O O O O O O
24. How important is communication and interaction with the operator and owner to you?
very important important quite important quite unimportant unimportant not important at all
O O O O O O
very satisfied satisfied quite satisfied quite unsatisfied dissatisfied not at all satisfied
O O O O O O
very important important quite important quite unimportant unimportant not important at all
O O O O O O
27. All in all, taken together, how dissatisfied, or how satisfied, are you with the overall build-
ing conditions?
very satisfied satisfied quite satisfied quite unsatisfied dissatisfied not at all satisfied
O O O O O O
© DGNB GmbH 86
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
ECO3-B
Benefits
Procurement and operations have a decisive role in retaining and maintaining an asset’s value. Procurement entails
opportunities and risks to comply with the sustainability objectives of the building operation. By setting up internal
guidelines, the intended quality can be safeguarded and its implementation regularly checked.
© DGNB GmbH 87
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
Outlook
The classification of environmentally friendly materials will change in the future as the affiliated regulations are
subject to change. The DGNB will extend the overview of local environmental impact in the future to meet
developments in the industry. The relevance of biodiversity has for a long time required a pragmatic implementation.
Here, the short-term objective is an increase in the acceptance for this specific topic, while further indicators might be
supplemented in the medium term. In the future, a greater focus will also be placed on the implementation of
guidelines.
© DGNB GmbH 88
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
ASSESSMENT
ASSESSMENT
To assess sustainability in the procurement and operations, it is evaluated whether guidelines for maintenance and
construction measures, sustainability building operation management, biodiversity and technical monitoring were
available, and whether they were demonstrably implemented. In total, 100 points can be achieved in this criterion.
With additional bonus points, 105 points can be achieved.
NO INDICATOR POINTS
The guideline includes the implementation of requirements for all maintenance and construction
measures with
basic requirements (corresponding to quality level 0 or quality level 1 of the criteria 2
matrix)
moderate requirements (corresponding to quality level 2 of the criteria matrix) 4
high requirements (corresponding to quality level 3 of the criteria matrix) 6
very high requirements (corresponding to quality level 4 of the criteria matrix) 8
The guideline stipulates the implementation of the requirements for medium to larger
maintenance and construction measures according to
Preference for the use of products with proven corporate responsibility in resource 6
extraction (corresponding to quality level 1.1) or certified sustainable resource extraction
(corresponding to quality level 1.2 and 1.3), and use of secondary raw materials
(corresponding to quality level 2.1 and 2.2)
© DGNB GmbH 89
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
ASSESSMENT
NO INDICATOR POINTS
3 Biodiversity max. 16
3.1 Guideline for promoting biodiversity
A guideline for promoting biodiversity on the site is available.
The guideline includes requirements for
handling invasive plant species +4
supporting and protecting domestic species +4
greening of facade and roof areas +4
maintaining the operational condition and the environmental quality of the outdoor +4
spaces through a maintenance contract
4 Technical monitoring
4.1 Guideline for technical monitoring max. 4
A guideline with requirements for implementing technical monitoring is available.
The guideline includes
a description of necessary services 4
© DGNB GmbH 90
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
ASSESSMENT
NO INDICATOR POINTS
5 Implementing guidelines
5.1 Implementing the guidelines for maintenance and construction measures max. 8
In the past period, the guideline for maintenance and construction measures was implemented
with regards to
environmentally friendly materials +2
sustainable resource extraction and secondary raw materials +2
Deconstruction and recycling +2
construction waste +2
Alternatively: No maintenance and/or construction measures were conducted. 8
5.2 Implementing the guideline for sustainable building operation management max. 12
In the past period, the guideline for sustainable building operation management were
implemented with regards to
procuring energy-efficient electrical products +3
selecting sustainable cleaning agents +3
sustainability aspects in selecting suppliers and service providers +3
local suppliers and service providers +3
6 CIRCULAR ECONOMY +5
6.1 Life Cycle Assessment (LCA) of maintenance and construction measures
For extensive maintenance and construction measures, life cycle assessments are
conducted for design variants as basis for selecting a sustainable design.
© DGNB GmbH 91
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
REPORTING AND SYNERGIES
Sustainability reporting
© DGNB GmbH 92
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
APPENDIX
I. Relevance
-
II. Additional explanation
-
III. Method
Indicator 1: Maintenance and construction measures
Maintenance and construction measures should comply with environmental and social standards. The associated
guidelines should be based on the requirements of the DGNB System for New Buildings, Version 2020.
© DGNB GmbH 93
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
APPENDIX
Note: In indicator 1.2 and 1.3 for “medium to larger measures” the following definition applies: total costs for
maintenance and construction measures of >50,000 Euros. Please calculate the relevant cost benchmark by using
the chart in appendix 1.
Example: if x= local factor: 50.000 EUR/x=local cost benchmark in EUR.
Indicator 3: Biodiversity
Indicator 3.1: Guideline for promoting biodiversity
This indicator evaluates whether a guideline for promoting biodiversity on the site is in place. Points are achieved, if
the guideline includes the following requirements:
For invasive plants: Here, recommendations for action following the DGNB system New Construction
criterion ENV2.4 Biodiversity may be implemented on the site.
Measures supporting and protecting existing species and settling of new domestic species on site. This will
increase biodiversity in the long term. Species from the following genera can be selected: birds, bats,
butterflies, wild bees, wasps, amphibians, reptiles etc.
The greening of facade and roof.
Implementing a maintenance contract to ensure the operational condition and the environmental quality of
the outdoor spaces.
© DGNB GmbH 94
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
APPENDIX
Indicator 5.2: Implementing the guideline for sustainable building operation management
This indicator evaluates whether guidelines for sustainable building operation management were
implemented and complied with.
© DGNB GmbH 95
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
APPENDIX
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 3: Biodiversity
Relevant documents that prove compliance with the requirements (e.g. guideline for biodiversity)
Indicator 5.1: Implementing the guidelines for maintenance and construction measures
Confirmation of the implementation and compliance with the requirements (e.g. through confirmation letter)
Alternatively: Confirmation that no measures were implemented.
© DGNB GmbH 96
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
APPENDIX
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
DGNB System New Buildings, Version 2020, ENV1.2 “Local environment impact” [https://www.dgnb-
system.de/en/buildings/new-construction/criteria/local-environmental-impact/ , Accessed on 28.05.2020]
DGNB System New Buildings, Version 2020, ENV1.3 “Sustainable resource extraction” [https://www.dgnb-
system.de/en/buildings/new-construction/criteria/sustainable-resource-extraction/, Accessed on 28.05.2020]
DGNB System New Buildings, Version 2020, ENV2.4 “Biodiversity at the site” [https://www.dgnb-
system.de/en/buildings/new-construction/criteria/biodiversity-at-the-site/, Accessed on 28.05.2020]
DGNB System New Building, Version 2020, TEC1.6 “Ease of recovery and recycling” [https://www.dgnb-
system.de/en/buildings/new-construction/criteria/ease-of-recovery-and-recycling/ , Accessed on 28.05.2020]
REHVA Guidebook 29-2019 “Quality management for buildings”
Sustainable Development Goals Icons, United Nations/globalgoals.org
© DGNB GmbH 97
DGNB System – Buildings In Use criteria set Economic quality
VERSION 2020 ECO3-B / PROCUREMENT AND OPERATIONS
APPENDIX
© DGNB GmbH 98
DGNB System – Buildings In Use criteria set Sociocultural and functional quality
VERSION 2020 OVERVIEW
Sociocultural and
functional quality
All three criteria of the sociocultural and functional quality support in evaluating the building’s the indoor comfort,
user satisfaction, wellbeing and the most essential aspects of the mobility infrastructure.
© DGNB GmbH 99
DGNB System – Buildings In Use criteria set Sociocultural and functional quality
VERSION 2020 SOC1-B / INDOOR COMFORT
SOC1-B
Indoor Comfort
Objective
Our objective is to ensure adequate indoor comfort conditions for the activities of building users at all times of the day
and year.
Benefits
Good indoor air quality and pleasant room temperature levels increase the well-being and the performance of
building users. An adequate room climate with a high level of satisfaction among building users has a positive effect
on the occupancy rate and the commercial viability of the property, as well as reduces potential cost and health risks.
Outlook
An extension of the indoor comfort evaluation to include visual and acoustic comfort is being considered.
Furthermore, prospectively an assessment of the building’s performance through benchmarking its indoor comfort
could be added.
ASSESSMENT
In cooperation with all stakeholders, target values are defined to ensure adequate indoor comfort. By implementing a
complaint management system complaints relating to indoor comfort can be recorded. In the case of complaints
regarding poor indoor comfort, a process is established to monitor thermal comfort and indoor air quality with the
purpose of proving compliance with the agreed target values. In total, 100 points can be achieved in this criterion,
and with bonus points a maximum of 112 points.
Part 1: Management
NO INDICATOR POINTS
1 Plan
1.1 Target agreement (target value) max.30
A target agreement for indoor comfort is available for the property.
The target agreement is based on target values, which were
determined internally 15
based on data from several comparable buildings or a technically innovative building 20
2 Do
2.1 Collecting data on comfort parameters and user information (actual values) max.20
Measured data on the indoor comfort for the period under review is available. In addition, user
surveys are carried out regularly and complaint management is implemented.
In addition,
user satisfaction surveys have been conducted +5
complaint management is implemented +5
3 Check
3.1 Data analysis max.10
The measured data, the results of the survey and the complaints were analysed and summa-
rised in a report and/or illustrated graphically.
Data analysis was conducted 10
NO INDICATOR POINTS
4 Act
4.1 Measures for optimising operation max.20
Operational optimisation measures were made, based on
technical knowledge and through stakeholder dialogue in regular meetings +5
user surveys and/or complaint management +5
technical monitoring +5
Alternatively: Target values determined in the target agreement were met for
Indoor comfort 20
User satisfaction survey +10
Complaint management +10
Part 2: Performance
NO INDICATOR POINTS
6. Evaluation of performance
The performance is evaluated in accordance with the target agreement. max. 10
Sustainability reporting
I. Relevance
Nowadays people spend up to 90% of their time inside buildings. Therefore, indoor comfort plays a significant role in
terms of human health and well-being.
III. Method
Part 1: Management
Indicator 1: Plan
This indicator evaluates the process of defining the annual target value for indoor comfort as part of the target
agreement.
The target agreement is based on a target value, which was determined internally.
The target agreement is based on a target value, which was based on data from several comparable
buildings (minimum 10 buildings) or a technically innovative building model (plausible representation of the
model characteristics is required).
The target agreement sets requirements and target values for at least the following key parameters:
Thermal comfort: upper and lower limit values for the indoor temperature with corresponding exceedance
frequency
Humidity: upper and lower limit values for the indoor humidity with corresponding exceedance frequency
Indoor Air quality: upper limit value for the CO2 concentration in the indoor air
Note: In the target agreement it can be agreed that “no requirements” exist for certain parameters. This can be
useful, for example, if no (de)humidification is installed as part of the ventilation system and consequently no
conditioning of the particular target value is possible.
It is recommended to implement the target agreement according to the methodology of the European standard EN
15251. This enhances the consistency within the DGNB system (the DGNB New Buildings system uses the same
standard in the design phase), as well as enables a standardised evaluation base for external benchmarking.
Note: This standard is currently in process to migrate to EN 16798-1 and will keep the same structure. The DGNB
system will shift to the new standard when officially published. It can be already used in all European countries that
adopted this standard. Countries outside of Europe can either refer to European standards or comparable such as
ASHRAE Standard 55 / 62.1.
In addition, a target agreement for a user satisfaction survey and complaint management is available:
User satisfaction survey: This indicator evaluates whether target values for the results of the user survey
were set for at least the topics temperature, air quality, visual comfort and acoustics (the scope and
methodology of the user satisfaction survey is described in criterion ECO2-B Risk Management and Long-
term Asset Value / Indicator 2.1).
Complaint management: This indicator evaluates whether target values for the complaint management were
set. The target agreement is based on a reasonable, measurable metric that characterises the complaint
management (the scope and methodology of the complaint management is described in criterion ECO2-B
Risk Management and Long-term Asset Value / Indicator 2.2).
Indicator 2: Do
Indicator 2.1: Collecting data on comfort parameters and user information (actual values)
This indicator evaluates how comfort parameters and user information is recorded and collected. The responsible
person for collecting this data is pointed out among the relevant stakeholders. The quality of data collection distin-
guishes between time (short-term measurements or continuous measurement) and space (selected spaces or repre-
sentative spaces of the total area). Based on the recorded data, the responsible person calculates the comfort pa-
rameters (actual value).
Short-term measurement: the measured data must be recorded for the duration of an extreme period and in
spaces with critical indoor comfort conditions.
Continuous measurement: representative spaces must be selected in such a way that 95% of the
permanently used areas are covered – also taking into account different boundary conditions (e.g. specific
internal and external loads) and different space conditioning systems.
Alternatively: Points can be achieved if user satisfaction surveys were conducted and complaint management is
implemented.
Indicator 3: Check
This indicator evaluates whether the collected data is analysed. There are two levels of evaluation:
1. Quantitative analysis by checking the variation between the target value and the acutal value, in order to identify if
the target value was met (Indicator 6).
2. Qualitative analysis by interpreting and checking the data for plausibility (effects of vacancy, occupancy density,
usage profile, etc.). The qualitative analysis provides a better understanding of the recorded data and an explanation
for specific influences and changes.
This indicator evaluates whether improvement measures, which were planned in the previous period under review,
were partly implemented or fully implemented. Alternatively, points can also be achieved, if the target values were
met in the previous period under review (and therefore no measures for improvement were planned).
Indicator 4: Act
The identification and selection of measures for optimisation are evaluated in this indicator. The relevant
stakeholders (building owner, operator/facility manager and user/tenant) define responsibilities for the
implementation of resources.
Measures can be identified based on technical knowledge, literature, stakeholder dialogue and suggestions
from the operation management team. To derive improvement measures for future target achievements, the
Measures were determined from user satisfaction survey results and complaint management.
Calculation models offer an objective and project-specific approach to evaluate different variants. There exists both
simple calculation models and comprehensive software solutions to cover different degrees of complexity in
optimising building operation processes. The complexity increases when considering transient dynamics with the
impact of weather, building usage and occupancy profiles. Which calculation model and which degree of complexity
is appropriate for the individual task depends on the respective ambition to map realistic building operation processes
including all variations of influences for a holistic optimisation. For example, for optimising water consumption, simple
Excel calculations may be enough, while for optimising transient heating/cooling loads, a customised energy
calculation or dynamic simulation might be appropriate.
Valuable insights can be obtained from assessing variants using suitable calculation models with
standardised settings.
Further insights can be obtained by adapting the model parameters to the actual building operation. Based
on validated calculation models with an adaptation of the operating time, technical equipment, occupancy
and usage profiles related to the actual building use, a realistic optimisation is possible.
Technical monitoring helps checking the performance of buildings and technical systems. The objective is to
achieve and maintain an economic, efficient, functional and demand-based building operation by recording
relevant cross-trade operational data.
The objective is a holistic optimisation of the building operation. Therefore, the competing objectives of
comfort, energy and cost optimisation should be considered. The evaluation of the results of variant
assessments and selection of the optimisation measures should be carried out while considering and
balancing environmental, economic and social aspects.
Alternatively: Points can be achieved in this indicator, if the target values for indoor comfort or the user
satisfaction survey and complaint management were met.
This indicator evaluates whether spot test measurements of the following comfort parameters were conducted:
draught, radiation asymmetry/surface temperature, visual comfort, acoustics, indoor air quality/indoor pollutants
(VOC, SVOC and formaldehyde), and electrosmog. These measurements can be used to objectively assess any
suspicious data from user satisfaction surveys, complaint management, or from building inspections. In addition, the
measurements can be used as basis for determining measures for future indoor comfort improvements. 4 bonus
points can be achieved per measurement, however, a maximum 12 bonus points can be scored.
Part 2: Performance
Indicator 6: Evaluation of performance
This indicator evaluates whether the defined target value for indoor comfort was met. Alternatively, points can also be
achieved, if the target values for the user satisfaction survey and the complaint management were met.
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 1: Plan
Indicator 2: Do
Indicator 3: Check
Relevant documents for data analysis and evaluation of complaints and user survey
Evidence of the implementation of the improvement measures (e.g. meeting notes, acceptance and
handover records, photo documentation)
Indicator 4: Act
Relevant documents from meetings, e.g. notes, minutes, presentations, result documents
Meeting notes with participant list as evidence of the presence of representatives of all three stakeholders
Relevant documents from calculations, e.g. analyses, result documents
Relevant documents from technical monitoring e.g. result documents for the operational quality with an
indication of deficiencies and optimisation potentials
The juxtaposition of environmental, economic and social aspects in relevant variants
List of measures chosen as a result of the stakeholder dialogue, including listing of responsibilities for
implementation
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
EN 15251 - Indoor environmental input parameters for design and assessment of energy performance of
buildings addressing indoor air quality, thermal environment, lighting and acoustics.
EN 16798-1 - Energy performance of buildings - Part 1: Indoor environmental input parameters for design
and assessment of energy performance of buildings addressing indoor air quality, thermal environment,
lighting and acoustics
Sustainable Development Goals Icons, United Nations/globalgoals.org
SOC2-B
User satisfaction
Objective
Our objective is to create a living and work environment that meets the needs of our diverse society, and also to
provide facilities for building users that promote their satisfaction and well-being.
Benefits
Through a wide range of offers and facilities, building owners can contribute significantly to make work and family life
more compatible, as well as promoting topics of inclusion and healt protection.. By strengthening social interaction
and exchange among one another, plus increasing user satisfaction and well-being, the attractiveness of the building
is significantly improved.
11.6 Reduce the environmental impact of cities 3.1.c/d Health and food
3.2.a Air pollution
Low 11.7 Provide access to safe and inclusive public 4.2.a/b Provisions for families
spaces and green areas 10.2 Distributive justice
12.4 Environmentally friendly handling of
chemicals and waste
Outlook
Ideally, the indicators considered in this criterion can be omitted in a few years when the topics addressed have
become standard. Hereafter, new topics will be included to address contemporary changes in society.
ASSESSMENT
To increase the satisfaction and well-being of the user, the building operation is evaluated based on the socio-
cultural facilities it provides, whether communication and interaction is promoted, and if measures are implemented
to promote human well-being. During operation, the existing offers and facilities should be checked regularly for their
use and their requirements, and, if necessary, additional or other/new facilities should be provided.
In total, 135 points can be achieved in this criterion, however, only a maximum of 100 points can be used for
evaluation. Including bonus points, a maximum of 105 points can be used for evaluation.
NO INDICATOR POINTS
1 Communication
1.1 User communication max. 25
2 User facilities
2.1 Family-friendly facilities max. 15
NO INDICATOR POINTS
Sustainability reporting
-
I. Relevance
To enable a high-quality building operation, communication and interaction between stakeholders is critical, among
other things in order to prevent conflicting objectives. Furthermore, attractive user facilities and high quality of spaces
increase the user satisfaction, their well-being and general health. The implemented facilities and measures
strengthen social interaction and exchange.
III. Method
Indicator 1: Communication
In addition, points can be achieved, if a sustainability guide is available for the building users. The sustainability guide
gives the building users specific recommendations on environmental, economic and social aspects. As a minimum,
the guide contains information and user guidelines for saving energy, saving water, separating waste, and
maintaining good indoor comfort.
Points can also be achieved, if information signs that encourage users towards behavioural change are put up in
relevant areas, e.g. information and recommendations on manual window ventilation, using the stairs instead of the
elevator, etc.
Points can additionally be achieved if an information system is implemented. The information system should visualize
and inform the users on their current energy consumption, energy generation, water consumption, etc. The
information system is a common instrument to disclose the current results of the building operation and to show the
degree of target achievement. Through continuous visualization of information, the users of the building should be
motivated to change their behaviour in a positive way.
This indicator evaluates whether interaction between the building users is promoted through activities such as tenant
parties, tenant participation in planning, operational/property-specific suggestion schemes, recognition for long-term
tenants, web-based portal for feedback, etc. Such measures increase social togetherness and are beneficial for a
healthy society in general.
Points can be achieved, if at least one entrance to the building is barrier-free, this implies following
requirements:
o Entrance width: The minimum unobstructed width of doorways must be at least 900mm.
o Internal and external infrastructure: Access route to entrance and area in which to manoeuvre in
front of the entrance door(s) and the associated circulation area, is accessible and barrier-free in
accordance with ISO 21542:2011 [Accessibility and usability of the built environment]
o Operating information (e.g. for entrance door) is provided in line with the “multiple-sense principle”
(“at-least-two-senses principle” – e.g. visual, audible, tactile)
In addition to barrier-free access to non-residental buildings, it is evaluated whether at least one barrier-free
toilet cubicle is accessible from a public area and designed in accordance with ISO 21542:2011. For
commercial buildings, department stores and consumer markets, this indicator is only relevant for rental
spaces with a sales area ≥ 2,000 m².
In addition to barrier-free access to residential buildings, it is evaluated whether barrier-free residential
dwellings are available and designed in accordance with ISO 21542:2011. (Minimum 2% of the total number
of dwellings in the building should be barrier-free, but at least 2 units).
In addition to barrier-free access to the building, it is evaluated whether at least one barrier-free elevator is
accessible via the public area.
The requirements in this indicator are based on ISO 21542:2011, except the requirement regarding the unobstructed
door width (clear width opening): The minimum unobstructed width of doorways, as well as the entrance width of
elevators and barrier-free toilet cubicles, must be at least 900 mm.
Alternatively, if the national building regulations with regard to barrier-free design vary from the described
requirements, documentation must be provided, that national building regulations in regard to accessibility are met. If
at least one building entrance meets the national building regulations for barrier-free design, points can also
be achieved.
If a building’s requirement differs from the above mentioned requirements, e.g. due to specifications from the
protection of historical buildings, or are conform to country-specific building regulations for accessibility, it is
recommended to consult with the DGNB.
This indicator evaluates whether a barrier-free concept has been implemented. The requirements represent the
quality levels in criteria SOC2.1 of the DGNB System New Buildings , Version 2020. Points in this indicator can only
be achieved, if Indicator 3.1 is fulfilled.
If a barrier-free concept is available, which will improve the degree of accessibility at least one quality level according
to the criteria SOC2.1 of the DGNB System New Buildings, Version 2020, points can be achieved. The
implementation of the concept has already been planned and the measures have been added to the next year’s
budget or the implementation has already have been commissioned.
APPENDIX B - DOCUMENTATION
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
I. Required documentation
Indicator 1: Communication
Photo documentation
Documents for sustainability guide
Relevant documents depicting implemented measures
Photo documentation
Relevant documents depicting implemented measures
Photo documentation
Relevant documents depicting implemented measures
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
DGNB System New Buildings , Version 2020 – Criteria SOC 2.1 [https://www.dgnb-
system.de/en/buildings/new-construction/criteria/design-for-all/, Accessed on 13th May, 2020]
ISO 21542:2011 Building construction — Accessibility and usability of the built environment Technical
Committee: ISO/TC 59/SC 16
Sustainable Development Goals Icons, United Nations/globalgoals.org
SOC3-B
Mobility
Objective
Our objective is to save natural resources, to create viable urban areas and spaces, to reduce traffic-related
emissions to the air, water and soil, and to increase user comfort by promoting sustainable mobility.
Benefits
The quality of the mobility network is an important site factor for the users of a building. The presence of various
mobility alternatives enables the user to select the most suitable transport medium for different routes and thus
supports the gradual transition to sustainable mobility. If the conditions are created for the user to use a variety of
mobility options, it will be beneficial for the environment, plus reduction in the negative effects of the motorised
individual transport can be assumed. In addition, user satisfaction can be increased, affordable mobility is expanded,
and health-promoting cycle and foot traffic is strengthened.
Outlook
The mobility sector is transitioning. Regions and cities are increasingly presenting guidelines with target values for
the share of environmentally-friendly public transport. Building owners and operators can promote sustainable
mobility through target values for the share of sustainable transport options to the building and by implementing
measures and infrastructure promoting sustainable transport within the building. In the future, the system boundaries
in the criterion ENV1-B Climate Action and Energy will be extended in order to include a mapping of the greenhouse
gas emissions of mobility as part of the CO2 balance.
ASSESSMENT
Buildings represent an important node in the mobility network, often being both the starting and destination point.
Therefore, the mobility infrastructure of the building, the parking facilities, and the promotion of sustainable transport
options is evaluated. For this purpose, the existing options should be evaluated and, if necessary, further or other
options should be provided.
A total of 125 points can be achieved in this criterion. However, a maximum of 100 points can be used for evaluation,
and with bonus points, at a maximum of 110 points.
NO INDICATOR POINTS
1 Pedestrians
1.1 Infrastructure for mobility aids max. 5
Storage facilities for mobility aids (e.g. walkers, pushchairs, electric scooters, etc.) are 5
available
2 Bicycling
2.1 Parking facilities max. 35
Parking facilities, clearly assigned to the building and easily accessible, are located in +5
or around the building
Anti-theft and anti-vandalism measures for the parking facilities/spaces have been +5
applied
Bicycle maintenance facilities are available +5
Weather protection for min 80% of the parking facilities/spaces is available +5
Lighting of the parking facilities/spaces is available (min. 80%) +5
Charging stations for electrically powered bicycles are available +10
3 Public transport
3.1 Access to public transport max. 20
NO INDICATOR POINTS
5 Mobility sharing
5.1 Vehicle sharing and carpooling max. 20
Mobility sharing (car-, scooter-, bike-sharing, etc.) is available in the immediate vicinity +10
(max. 350 m) of the building (commercial/private sharing)
Programs for promoting carpooling are available +10
Re 1 - 5 INNOVATION AREA as
1-5
Explanation: If measures are implemented, which have been proven to encourage
users of the building to extensively and regularly use environmentally friendly forms
of transportation (non-motorised modes of transport, public transportation, rental
systems, etc.) to reach the building, points can be awarded in accordance with
Indicators 1–5.
Sustainability reporting
I. Relevance
Mobility is an important location factor for buildings. The availability of various modes of transport and their
interconnectedness increases the user’s convenience. Through higher user acceptance and use frequency, the
location earns a better rating, which reflects positively on the location decision for a property.
III. Method
Indicator 1: Pedestrians
It is evaluated whether storage facilities for mobility aids are available. Mobility aids include walkers, pushchairs,
electric scooters, etc.
Indicator 2: Bicycling
Indicator 2.1: Parking facilities
This indicator evaluates the availability of parking spaces, maintenance facilities, vandalism and theft security
solutions, weather protection, lighting, and charging options. In addition, measures to support user comfort for
cyclists in the building is evaluated.
Parking facilities: It is evaluated whether parking facilities are available in sufficient number and quality in
accordance with local guidelines/standards. If, in project-specific cases, the total number of bicycle parking
spaces, based on the reference value, is disproportionate large compared to the requirements derived from
the existing/expected number of cyclists in the building, the number of parking spaces must be increased or
reduced.
Alternatively, the following recommendations for determining space requirements can be used (the
respective links can be found in the Literature section):
- “Making Buildings Fit for Sustainable Mobility” report from the Euroopean Cyclists’s Federation
(ECF)
- Instructions for planning bicycle parking facilities and Technical Guidelines TR 6102 from the
German Cyclist’s Association (ADFC)
- Bicycle Parking Manual by the Danish Cycling Federation
Anti-theft and anti-vandalism measures: It is evaluated whether bicycles using the parking facilities are
protected through anti-theft and anti-vandalism measures.
Maintenance facilities: It is evaluated whether an area is exclusively reserved for servicing bicycles. The
service area should be located in the vicinity of the building and easily accessible by bicycle. In addition, the
service area should be protected from the weather, easy to find, well lit, and also be equipped with simple
maintenance tools such as a bicycle stand, air pump, etc.
Weather protection: The extent of weather protection for the parking facilities/spaces is evaluated.
Lighting: The extent of lighting for the parking facilities/spaces is evaluated.
Charging stations: The availability of sufficient charging stations for bicycles is evaluated.
Alternative A:
It is evaluated whether a mobility strategy is available. The mobility stategy should guarantee sufficient charging
stations for e-mobility in and around the building. The e-vehicles must be charged with green power. The strategy
should consider the following project-specific criteria: Number of building users, building usage type, and the
building’s access to public transport. Furthermore, it should be build on the local/regional/national mobility strategy to
increase the mobility infrastructure for alternative drive technologies.
Additional points can be achieved, if the mobility strategy is implemented.
Alternative B:
Alternative B evaluates the share of parking spaces, which already have charging stations (type 2 ≥ 22kW) installed.
The e-vehicles must be charged with green power.
APPENDIX B - DOCUMENTATION
I. Required documentation
The following includes a selection of possible forms of evidence. The evaluation of individual indicators must be
plausibly and comprehensively documented based on the submitted evidence documents.
Indicator 1: Pedestrians
Photo documentation
Indicator 2: Bicycling
Evidence of the number of bicycle parking spaces
Photo documentation
APPENDIX C - LITERATURE
I. Version
Change log based on Version 2020
II. Literature
Buildings In Use:
Appendix
ECO2-B Risk Management If measures, which enable proactive risk management and contribute positively to
and Long-term the long-term asset value, are implemented, points can be awarded in accordance
Asset Value with indicator 1-4.
ECO3-B Procurement and If alternative measures are implemented, points can be awarded in accordance the
Operations objectives of indicator 1-4. Alternative measures must contribute to sustainable
procurement and management while avoiding the use of harmful products and
materials.
SOC2-B User Satisfaction If alternative measures are implemented, which will increase the user comfort, these
can be evaluated positively in accordance with the objective of the criterion and
evaluation of other indicators
SOC3-B Mobility If measures are implemented, which have been proven to encourage users of the
building to extensively and regularly use environmentally friendly forms of
transportation (non-motorised modes of transport, public transportation, rental
systems, etc.) to reach the building, points can be awarded in accordance with
Indicators 1–5.
ENV1-B Climate Life Cycle Assessment (LCA) of the building Agenda 2030 Bonus:
Action and +10 Points
In order to optimise the carbon footprint of the entire life
Energy
cycle, the CO2 emission balance of the building is calculated
according to the “Framework for carbon neutral buildings and
sites” (accounting scope construction).
SOC2-B User Smoke-free and low-emissions for health and well-being Agenda 2030 Bonus:
Satisfaction People are not affected by other people smoking in or around the +5 Points
building. In the surrounding outside areas, suitable measures are
in place to ensure that cigarette smoke cannot enter the building.
ECO3-B Procurement and Life Cycle Assessment (LCA) of maintenance and Circular Economy