Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Date RDS

As on HT LINE
11.12.2023

Sr.No. Division Sum of Sum of Sum of Sum of Total of Sum of


(Feeder) Total HT Total HT Total HT Total HT Pole Toal
Pole Pole Pole Erected Balance at Achieved
Required Received Pending HT Pole Site HT Line
1
2
3
4
RDSS T-08 Baramati Zone
LT LINE DTC Work
Details

Sum of Sum of Sum of Sum of Sum of Total of Sum of Sum of Sum of


Total Total Total Total Total LT Pole Toal Total DTC Work
Stringing PSC 8M PSC 8M PSC 8M Erected Balance at Achieved Stringing Completed
HT Line Required Received Pending LT Pole Site LT Line LT Line Nos.
SDT Work 11 KV Bay
Details Work

Sum of Sum of 11
SDT Work KV Bay
Completed Work
Nos. Completed

You might also like