Professional Documents
Culture Documents
FInal Resurvye 17.10.2023
FInal Resurvye 17.10.2023
FInal Resurvye 17.10.2023
Name of
Executable Not executable Executable Not executable
Division
1.2 MVAR 2.4 MVAR 1.2 MVAR 2.4 MVAR 1.2 MVAR 2.4 MVAR 1.2 MVAR 2.4 MVAR
Baramati 4 0 1 0
Kedgaon 1 5 0 0 0 0 1 3
Saswad 0 1 0 0 0 1 0 0
Baramati Circle 5 6 1 0 0 1 1 3
Barshi 13 0 1 0 0 0 1 0
Akluj 2 0 0 0 0 0 0 0
Pandharpur 10 0 0 0 0 0 0 2
SLPUR U 14 0 0 0 0 0 0 2
Solapur Circle 39 0 1 0 0 0 1 4
BMT Zone 44 6 2 0 0 1 2 7
Note:- In Saswad Division Only RCC foundation work done and no any other Material at site.