Professional Documents
Culture Documents
Tendernotice 1
Tendernotice 1
Page 1 of 42
Offers are invited from reputed and experienced bidders
having experience in Engagement of TSA for Central/State
Govt./PSU/Private Sector
Contents
1. INVITATION FOR PROPOSAL: ........................................................................... 4
6 ELIGIBILITY: .................................................................................................. 22
6.2 EVALUATION:.............................................................................................. 34
Page 2 of 42
7. OPENING OF PROPOSAL: .............................................................................. 37
Page 3 of 42
1. INVITATION FOR PROPOSAL:
11. Estimated Cost of 1.70 Cr. (Rupees One Crore and Seventy Lacs
the contract for a only) excluding GST and other applicable
period of 2 years taxes.
Page 4 of 42
12. Amount of Earnest Rs. 5,10,000/= (Rs. Five lacs ten thousand
Money only) to be deposited through RTGS/ NEFT in
the bank account as per the details:
Name of Bank: J&K Bank ltd.
Bank Account Number: 0375010200000002
IFSC Code: JAKA0TRIKOT
(NOTE: Bidder registered as Micro, small &
Medium Enterprises (MSME) are exempted
from payment of EMD after submitting an
approved document from concerned
Ministry).
12. Bid Validity Period 120 days from date of opening of the Financial
Bid.
13 Period of Contract 2 years
14. Method of SelectionQuality cum Cost Based Selection (QCBS)
Page 5 of 42
2. INTRODUCTION AND OBJECTIVES:
The successful bidder has to provide the Technical Support as per the
SOP/guidelines of the aforementioned scheme as well as any other new
upcoming/existing scheme/s as and when asked for.
All Banker’s NEFT / RTGS should be in Indian Rupees and from any
Nationalized / Scheduled Bank in favor of CEO, SPSA.
a. All bids proposal will remain valid for 120 days from the date of
opening of Technical Bid.
b. In exceptional circumstances, SPSA of the Department of Rural
Department & PR, J&K, may solicit the bidder’s consent to an
Page 6 of 42
extension of the period of validity. The request and the response
thereto shall be made in writing.
For this purpose, definitions of the terms are set forth as follows:
Page 7 of 42
SPSA will reject and declare a bidder ineligible if it determines that
the Bidders recommended for the award, has been determined to
engage in corrupt fraudulent or unfair trade practices.
Page 8 of 42
erasures or over writing shall be valid only if they are initiated by the
authorized person signing the proposal.
iii. The Proposal shall be in indelible ink and shall be signed by the
Bidder or duly authorized person(s).
iv. Proposals received by facsimile shall be treated as defective, invalid
and rejected.
v. Only detailed proposal completed in all respect and in the forms
indicated shall be treated as valid.
vi. No Bidder is allowed to modify, substitute or withdraw the Proposal
after its submission.
vii. Withdrawal of a bid during this interval shall result in the forfeiture
of EMD of the Bidder.
Page 9 of 42
i. TECHNICAL PROPOSAL:- The Technical Proposal comprises
Annexure-1 (Covering letter), Annexure-2 (Technical form Checklist)
and Annexure-3 (Bidder Organization Details).
ii. FINANCIAL PROPOSAL:- This would have Annexure-4(Financial
Proposal Format is for reference, Annexure will be available online).
Page 10 of 42
preparing Statements of Expenditures (SOE), compiling and
preparing consolidated progress reports for the program related
expenditure. Necessary updating also needs to be made in the
Public Finance Monitoring system by the TSA.The Financial
Management Information System will be based on the following
two systems:
VI. Interface with Sector Skill Councils (SSCs)/ National Council for
Vocational Training (NCVT)/ National Skills Qualifications
Framework (NSQF) and other national and international
standards agencies (relating to skill development) and to suggest
modifications/ Improvements to ensure curriculum, assessment
and certification is ‘learner-centered’ for DDU-GKY. Undertake
all related support activities in respect of this alignment.
Page 11 of 42
S.No. Deliverable Outputs
Page 12 of 42
under closure 3) Periodical distribution of the electronic data to
PIA) HMMU on the project monthly progress.
Placement
1) 100% Post placement tracking mechanism
tracking and
and regular review.
E Monitoring (For
ongoing & under
2) Desk and Physical Verification on monthly
closure PIA) basis.
1) Desk and Physical Verification on monthly
basis of placed candidates of ongoing projects.
Page 13 of 42
I. To identify, develop, maintain and expand strong industry
partnerships to accommodate the wide range of skill sets enabling
100% job placement of trained candidates under the project.
Page 14 of 42
Managing the program as per the approved process guidelines
and support for its implementation.
Page 15 of 42
b. Key Deliverables:
The broad functions and roles to be assigned to the TSA will include
the following:
Page 16 of 42
4) Disbursement scheduling and timely fund
transfer; management accounting by ensuring
regular update, periodical review; reporting of the
finance information system.
Page 17 of 42
expanding employment opportunities for
students and wider industry engagement in
the program.
8) 100% Post placement tracking mechanism
and regular review.
9) Desk and Physical Verification on monthly
basis.
Grading of
1) Physical infrastructure quality, Batch training
Project
F quality, Placement quality and Project execution
Implementing
quality.
Agency
Page 18 of 42
14) Maintain grass root connection and
document feedback from the stake holders.
D. DURATION OF CONTRACT:
The contract period shall be for 02 years (Two years) or co-
terminus with project whichever is earlier and extendable further
on mutual consent based on the satisfactory performance of the
TSA. Notwithstanding above, the contract may be terminated at
any point of time by HMMU owing to, but not limited to, deficiency
of service, sub-standard quality of specialists deployed, breach of
contract, reduction or cessation of the requirements of work with
no liability to the HMMU. Termination of contract without notice
is an internal power of HMMU that cannot be questioned in the
court under any law.
a) Working Conditions, Leave, etc. for deployed person: The TSA shall
follow HMMU working conditions. In case of exigency the TSA shall
provide alternative services for the employee who is on
leave/absent.
b) Travel, TA/DA Norms: The TSA shall follow TA/DA norms as per
HMMU policy (JKRLM Financial Manual). Deployed staff would
follow the Travel, TA/DA norms etc. Tour/travel requests of the
deployed staff would be sanctioned by the Chief Operating Officer
or an Officer designated by COO, HMMU.
Page 19 of 42
F. FACILITIES AND SERVICE TO BE PROVIDED BY HMMU:
H. PENALTY:
Page 20 of 42
annual contract value will be imposed. The maximum amount of
penalty imposed for the whole of the services is five percent (5%)
of total contract value. If it exceeds 5% of total contract value,
contract will be terminated without issuing any notice.
S. Number of
Positions Level
No. resources
Key Experts
1 Team Leader 1 L2
4 Project Consultant-Placement 1 L3
Non-Key Experts
Total 11
Page 21 of 42
6 ELIGIBILITY:
ELIGIBILITY CONDITIONS
Page 22 of 42
10. MSMEs Registration with concerned Documentary Proof
Ministry to be provided if the bidder is
MSME.
No of positions 1
Page 23 of 42
- The candidate should be willing to travel as &
when required.
- Project guidance & direction for implementation
of the program across the State;
- Regular reviews & updates to HMMU;
- Quality control & assurance;
- Project tracking and issue resolution;
- Coordination with MoRD, GoI and other
stakeholders in skills such as
NSDC/NSDA/MSDE/ SSCs etc;
Key Responsibilities
- Coordinate internal resources and third
parties/vendors for the flawless execution of
projects;
- Assist in the definition of project scope and
objectives, involving all relevant stakeholders and
ensuring technical feasibility, manage changes to
the project scope, project schedule and project
costs using appropriate verification techniques;
- Perform any other duties assigned by HMMU;
Duration of
Full time as per contract.
Engagement
No of positions 1
- MBA/Postgraduate in Rural
Development/MSW/Management/any other
relevant field
- Should have minimum 5 years of post-
qualification experience in relevant fields such as
social mobilization of rural youth and counseling
- Must have strong interpersonal skills and the
Minimum
ability to work in the area of community
Qualification and
engagement, mobilization and counseling of
Professional
youth
Experience required - Should be familiar with the local language
- The candidate should be willing to travel and stay
at GP level as & when required.
- Working experience in government projects/skill
or rural development assignment would be given
preference
- Experience in managing DDU-GKY program
would be preferred.
Page 24 of 42
- To devise the mobilization plan for the project;
- Overseeing engagement of all stakeholders such
as GPs, District Level Officers
- Provide handholding support to PIAs in planning
Key Responsibilities mobilization, preparation of counseling modules,
adoption and documentation of counseling-
related good practices
- Deliver high quality counseling and techniques
for effective program outreach / student
mobilization
- Work closely with IEC and Branding team to
prepare outreach plan;
- Plan and strategize various capacity building
initiatives across the thematic areas;
- Support in conducting capacity building training
for PIAs, HMMU officials and UT, District and
Block Level etc;
- Implement and Monitor Recruitment & Staffing
Solutions:
- Conduct Capacity Building program for the
project resources deployed across the
levels/locations.
- Conflict Resolution and Grievance Redressal
- Perform any other duties assigned by HMMU
Duration of
Full time as per contract.
Engagement
No of positions 1
Page 25 of 42
- Design a robust placement plan for the project at
State and District level to ensure employment of
youth as per the requirements of DDUGKY SoP’s;
- Achieve monthly, quarterly and annual
Placement targets
- Effectively coordinate Placement with Placement
Managers of Training Partners – work in-line with
the DDU-GKY manual to provide necessary
support to migrated candidates
- Placement Verifications
- Develops new contacts with various
corporates/industries for the purpose of
expanding employment opportunities for
students and wider industry engagement
Key Responsibilities
- Review and supervise the recruitment and
interviewing processes as well as resume referral
and job-listing services for candidates
- Post placement tracking mechanism and regular
review;
- Develop and harness partnerships with various
corporate/industries across the sectors;
- Support in engaging Industry Partners in the
training delivery system;
- Support and drive captive employers to engage
with HMMU as PIAs;
- Review and supervise the On-Job-Trainings;
- Support in establishment of Migration Support
Centers across major placement locations;
- Perform any other duties assigned by HMMU
Duration of
Full time as per contract
Engagement
No of positions 1
Page 26 of 42
- MBA in marketing/masters in mass
communication/Media/ any relevant masters
degree
- Should have minimum 5 years of experience,
ideally in a managing project promotion, IEC and
Branding;
Minimum
- Should be proficient in local language and
Qualification and
English
Professional
- Working experience of managing community
Experience required outreach programs in government projects/skill
or rural development assignment would be given
preference;
- Developed various communication materials and
knowledge products
- Should have working knowledge of MS Office,
Photoshop or any other media softwares;
- Assist HMMU in all IEC activities related to the
DDU-GKY
- Devise plans for various macro and micro level
IEC initiatives to promote the program and
ensure deep outreach at grassroots level;
- Develop system for Knowledge Management in
Key Responsibilities which provides the insights for policy
formulation, best practices, pilot studies etc;
- Take care of all publicity activities through
different mediums including social media;
- Work closely with Mobilization team to strategize
and execute program promotion for mobilization
of youth;
- Perform any other duties assigned by HMMU
Duration of
Full time as per contract
Engagement
Page 27 of 42
Position Project Consultant – Monitoring & Evaluation
No of positions 1
- MBA/Engineering/Postgraduate in
Mathematics/Rural Development/ MSW/
Statistics/ Economics/ Any related technical/
business masters degree
- Minimum 5 years of post-qualification experience
in the development sector with proven expertise
in monitoring and evaluation of projects
- Expertise in developing and implementing web-
Minimum
based monitoring and evaluation frameworks to
Qualification and
track project progress against outcomes;
Professional
designing and drafting impact assessment
Experience required reports
- Should have working knowledge of MS Office.
- Should be proficient in local languages and
English
- The candidate should be willing to travel and stay
at GP level as & when required.
- Working experience in government projects/skill
or rural development assignment would be given
preference
- Responsible for identifying requirements and the
data sources for monitoring of the program
- Devise plan for regular monitoring of training
centres and its physical inspection plan;
- Develop monitoring/performance sore cards
basis relevant success criteria
- Develop and implement evaluation techniques
and forecasting models to address demand and
supply gaps in training and employment by
Key Responsibilities
leveraging technology
- Monitoring daily functions performed by PIAs and
suggest mechanisms for effective delivery of the
program within agreed timeline
- Designing dashboards to map project progress
against outcomes
- Conduct inspection of training centers
- Assist HMMU in coordinating Assessments &
Certifications and monitoring thereof
- Perform any other duties assigned by HMMU
Duration of
Full time as per contract
Engagement
Page 28 of 42
Position Project Consultant – Legal Consultant
No of positions 1
No of positions 1
Page 29 of 42
- Proficient in MS Office, particularly Excel and other
important finance related applications
Page 30 of 42
Duration of
Full time as per contract.
Engagement
No of positions 1
Area of Specific
Skill Development and IT
Expertise required
Non-Key Experts:
No of positions 2
Page 31 of 42
- Should be a CA (Inter)/Master’s in Commerce/MBA
Finance with minimum of 03 years of experience,
ideally in a project related set-up
Minimum - Prepare necessary financial reports including budget
Qualification and preparation, maintaining books of accounts,
Professional statement of expenditure etc., along with the financial
Experience required statement i.e. ability to establish recognized
procedures to account for fund use
- Experience in skilling projects would be preferred;
- Experience in managing financial and accounting
system of Government/PSUs/IFIs
- Support thematic manager to manage accounts and
key financial metrics for the project;
- Deep understanding of Finance and Accounting
processes;
- Generation of internal and external financial reports
as per requirements;
- Undertaking review of Utilization Certificates (UCs)
Key Responsibilities submitted by partners
- Disbursement scheduling and timely fund transfer;
- Bid evaluation and appraisal received for
empanelment of new partners
- Management accounting by ensuring regular update,
periodical review, reporting of the finance information
system, Release and management of expression of
interest (EOIs), request for Bid, release of
advertisement and tender notices
Duration of
Full time during complete project duration
Engagement
No of positions 1
Page 32 of 42
track project progress against outcomes;
designing and drafting impact assessment reports
- Should possess good working knowledge of MS-
Office
- Must have strong interpersonal skills and the
ability to communicate confidently and
coherently.
- The candidate should be willing to travel as &
when required.
- Achieve monthly, quarterly and annual Placement
targets
- Effectively coordinate Placement with Placement
Managers of Training Partners – work in-line with the
DDU-GKY manual to provide necessary support to
migrated candidates
- Develop and analyses business opportunities with the
HMMUs for Staffing services
- Develops new contacts with various
corporates/industries for the purpose of expanding
employment opportunities for students and wider
industry engagement
- Review and supervise the recruitment and
interviewing processes as well as resume referral and
job-listing services for candidates
Key Responsibilities
- Post placement tracking mechanism and regular
review;
- Capacity building of trainers and placement officers;
- Identifying requirements and the data sources for
monitoring of the program
- Assist in Devising plan for regular monitoring of
training centers and its physical inspection plan;
- Monitoring daily functions performed by PIAs and
suggest mechanisms for effective delivery of the
program within agreed timeline
- Designing dashboards to map project progress against
outcomes
- Conduct inspection of training centres
- Assist in coordinating Assessments & Certifications
and monitoring thereof
- Perform any other duties assigned by HMMU
- The Technical Evaluation shall be based on the parameters and weight age as
mentioned in the Table below. The evaluation committee appointed by the
Department will carry out the evaluation of Proposals. The department may
seek specific clarifications from any or all Agencies at this stage and will take a
20 minute presentation from each bidder. The Department shall determine the
Agency that qualifies for the next phase after reviewing the clarifications
provided by the Agencies. Each evaluated proposal will be given technical
score(St) as detailed below.
Page 33 of 42
NOTE:- Technical Proposal must not include any financial
information failing which the Proposal will be rejected.
6.2 EVALUATION:
The bid price will include all taxes as applicable and shall
be in Indian Rupees. Prices quoted in the bid must be firm
and final, and shall not be subject to any modifications
on any account whatsoever. The TEC (Tender Evaluation
Committee) will correct any computational errors. When
correcting computational errors, in case of discrepancy
between partial amount and the total amount, or between
word and figures the former will prevail. All required items
must be priced accordingly in the financial bid.
For the purpose of evaluation, the total evaluated cost
shall be inclusive of all taxes &duties for which the
Department will make payment to the consulting firm
including overhead expenses, such as travel,
accommodation, logistics, training/workshop,
preparation of reports / formats, printing & other
secretarial expenses etc., which will be shown as part of
service charges in the financial bid.
Page 35 of 42
other Financial Proposals will be determined using the
following formula.
Sf = St x Fm/F;
In which SF is the Financial Score, Fm is the lowest Financial
Score and F, if the Financial Proposal (in INR) under
consideration. Proposal will finally be ranked in accordance
with their combined technical (St) and financial (Sf) score:
S=St x Tw + Sf x Fw;
Where S is the combined score and Tw and Fw are weights
assigned to Technical proposal and Financial proposal that will
be 0.70:0.30. The applicant achieving the highest combined
technical and financial score will be the successful applicant
and will be issued the Work order(The Successful Applicant).
After opening the Financial Bid, if Department of Rural
Development & Panchayati Raj, UT of Jammu & Kashmir
can/may reject any unreasonable/outlier bids where it feels
that the services cannot be offered in that price. This will be
sole discretion of Department and are not liable to give any
explanation.
Page 36 of 42
Panchayati Raj, J&K”, PBG must be valid from the date of
effectiveness of the contract to a period of 12 months beyond
the expiry of contract as its commitment to perform services
under the contract .Failure to comply with the requirements
shall constitute sufficient grounds for the forfeiture of the PBG.
The PBG shall be released after 3 months of expiry of contract
provided there is no breach of contract on the part of the
qualified bidder. No interest shall be paid on the PBG and no
exemption on PBG will be allowed.
7. OPENING OF PROPOSAL:
8. AWARD OF WORK:
Page 37 of 42
9. TERMINATION UNDER THIS CONTRACT
Page 38 of 42
Annexure-1 COVERNING LETTER.
Bidders are required to submit the covering letter as given here on their
letterhead.
To,
CEO & MANAGING DIRECTOR
J&K STATE PROCUREMENT & SUPPLY AGENCY
Department of Rural Development &PR
Dear Sir,
Yours Faithfully
Date
Signature.
Page 39 of 42
Annexure-2 TECHNCIAL FORM CHECKLIST
ELIGIBILITY CONDITIONS
S.No. Requirement Evidence
1. Bidder should be registered in India and Documentary Proof
should be registered entity with minimum
10 years of existence on the day of bid
submission.
2. Only Sole bidders are allowed; no
consortiums or JVs allowed
3. Bidder should not have been blacklisted Undertaking on letter
by any of the state or central Govt. head.
Organization.
4. Bidder should not have been found guilty Undertaking on letter
of any criminal offence by any court of head.
law.
5. Bidder should not have a conflict of Undertaking on letter
interest in the assignment. head.
6. Compliance with the code of integrity. Undertaking on letter
head.
7. Average annual turnover of the bidder for CA Certificate and
last three years shall not be less than Rs. Balance sheet of the
5 crore (Five crore Only), ending march bidder.
2023.The Bidder should not have
incurred any loss during the last three
financial years ending on the financial
year 2022-2023.
8. GST Registration Documentary Proof
9. PAN Registration Documentary Proof
10. MSMEs Registration with concerned Documentary Proof
Ministry to be provided if the bidder is
MSME
11. EPF/ESIC Registration Documentary Proof
12. Bidder should have at least 2 completed Documentary Proof
works of TSA assignment of fee equivalent
of Rs 1.00 Crore in the last five years.
13. EMD is exempted for MSMEs with Documentary Proof
declaration only otherwise attach EMD
Page 40 of 42
Annexure-3 BIDDER’S ORGANIZATION DETIALS.
Page 41 of 42
Annexure-4 FINANCIAL BID FORMAT