Reference No: QCARD/2024/CP-OO9STARR/2659
Reporter/ Observer Name
‘Amin Syah
Department (Other Observers
aaac None
Observer Category ‘Type of Submission
Contractor ‘Submit own report
DECSB
‘Observation Date
(06/02/2024
Observation Time
10:00:00 aM.
=
a eee ere eect
a
Conduction Onshore Mote)
cnt
Works Performed By
Contractor
What isthe activity related to your observation?
‘Material - Receiving
Where did your observation happen?
KLUANG SITE
Whe was involved?
QC inspector
What category is related to your observation?
Construction and Fabrication
Which subcategory is your observation most closely related to?
‘Additional steps/ actions applied to ensure good results
Observation
‘Material receiving inspection for TNB roof base plate
Immediate Action
‘Material received in good condition. Dimension and quantity as
per approved DO and PO. Supporting documents available for
reviewed.
Attachments
NoneDECSB / ARTANS