Manhole Schedule
Manhole Schedule
Manhole Schedule
Maximim weight
Usage
Claculation Mnhole Cover Duty Level next MH. Slope Level Depth size shpe / size Vent GRP seal Tonn
method NO. of MH. Connectin cover
mt mt mm mt mm mm Light Duty (A15) 1.5 Very light duty for pedestrian areas like gardens, patios and driveways
First Manhole MH-01 Medium Duty (C250) 17.98 5.411 200 mm 1 : 120 17.08 0.90 600 X 600 600 X 600 □ Yes Medium Duty (C250) 25 Lightly trafficked roads and small private car parks
Normal Slope MH-02 Medium Duty (C250) 17.72 11.197 200 mm 1 : 120 17.03 0.68 600 X 600 600 X 600 □ Heavy Duty (D400) 40 Main roads, highways and high traffic areas like public car parks
Normal Slope MH-03 Heavy Duty (D400) 17.53 4.553 200 mm 1 : 120 16.94 0.59 600 X 600 600 X 600 □
Revers Slope (Branch) MH-3A Heavy Duty (D400) 17.43 11.502 200 mm 1 : 120 16.98 0.45 600 X 600 600 X 600 □
FIC MH-04(FIC) Heavy Duty (D400) 17.43 200 mm FIC 15.53 0.58/1.9 600 X 600 1000 Օ Yes Yes
DESIGN CALCULATION SHEET
Sump pump calculation
PROJECT
LOCATION AND PLOT NO
CLIENT
DATE YY MM DD REV. NO
STATIC HEAD = 10
NUMBER OF PUMPS = 2
PUMP SCHDEU
REV. NO
KW
KW
SECONDS
MT
MT
M³
X 1.54
PUMP SCHDEULE
Each pump
Total power
Power Speed Pressure Vessel
VFD
controlled
KW RPM kw Hz
63 10.5 42
10.5 42
63 10.5 42
63 10.5 42