Paper / Subject Code: 53371 / Operations Planning and Control

BA

CE

4A
08

E9
74
6F

B4
EF

D
A0
BA
D8

88

9E
4C

44
0
B8

6F

0E
EF
A7

B
D8
8A

4A
88
C
FB
Time: 3 Hours Marks: 80

F0
4
8
0B

B4
7
B

86

BA

E
A
F7

88
D

4C
B8

44
N. B.: 1. Question 1 is Compulsory

F0
DA

A7
B

8B
0
2. Attempt any three questions out of the remaining five.

CE
D8
8A
F7
9E

FB

08
3. All questions carry equal marks.

4
A

B8
B
0E

EF
7
6
ED
4. Assume suitable data, if required and state it clearly.

70

BA
8
A
4A

8D

4C
F

8
E9

6F
0B
B4

A7
AB
1. Attempt any FOUR

D
0

CE
D8
F7
4A
88

9E

FB
8
a. Write a short notes on Service Capacity. [5]

74
DA

B8
0B
F0

0E
4

86
B
b. Explain the steps of Capacity planning. [5]

BA
CE

8A
7
4A
88

8D
F
E9
c. Explain Forwards scheduling and backward scheduling. [5]

DA

6F
0B
F0
74

B
B

0
d. Write notes on MRP. [5]
BA

8
E

A
7
A
88

9E

8D
AF
C

B8
4
e. Explain the objectives of Line balancing. [5]

F0
74
6F

E
4

AB

6
ED
8B

0
A0
A

D8
f. Write notes on JIT [5]

CE
D8

F7
FB

B8
08

E9
44

DA

B8
4
B8

EF
7
86

0
2 a. Use largest Candidate rule to work out a solution on a precedence diagram. Assume cycle

A0
BA

8A
7
8A

88

9E
8D

AF
C
time is 1 min. find out a. theoretical number of stations. b. Efficiency and balance delay. [10]

44

0B
F0
4
F
0B

0E
A7
B

ED
6

8B
E
D8

F7
A

4A
7

No. ElementDescription Time(min.) Mustbe

C
FB
AF

8
B8

E9

DA
F0
74
B8

4
Precedenceby
86

8B
ED

A0
0

BA

CE
A
F7

9E
8D

1 Placeframeonworkholderandclamp 0.2 ---

08
8

44
E9

4
DA

6F
0B

0E
2 Assembleplug,grommettopowercord 0.4 ---

EF
7
AB

8B
A0

BA
8

4A
F7
9E

8D

3 Assemblebracketstoframe 0.7 1

08
8
44

74
A

6F
B

B4
0E

EF
AB

4 Wirepowercordtomotor 0.1 1,2


D
8B

70

A
D8

88
4A

9E

C
5 Wirepowercordtoswitch 0.3 FB 2
F

B8
08

F0
74
DA

B8
0E
B4
EF

86
6 Assemblemechanismplatetobracket 0.11 3
0

BA

CE
8A
7
4A
88

9E

8D
AF
4C

7 Assemblebladetobracket 0.32 3

74
6F
0B
F0

0E
B4

B
A7

ED

8 Assemblemotortobracket 0.6 3,4

BA
8
CE

A
F7
A
88

8D
FB

9 Alignbladeandattachtomotor 0.27 6,7,8


E9
4

DA

6F
B
F0
74

AB
86

8B

70

10 Assembleswitchtomotorbracket 0.38 5,8


A0
BA

D8
CE

9E
8D

B8
08

11 Attachcover,inspect,andtest 0.5 9,10


4

DA

B8
74
6F

0E
4
EF
AB

8B

12 Placeintotepanforpacking 0.12 11
BA

8A
D8

7
4A

9E

AF
4C

0B
F0
B8

6F

0E
4
7

ED
B
BA

E
D8

F7
8A

A
88
C

b. Explain the concept of wastes in JIT Manufacturing. How these wastes are eliminated in JIT
E9
44

DA
F0
4
8

6F
0B

A7
AB

8B

A0
E
D8
F7

Manufacturing? [10]
9E
C
FB

08
B8

44
74
DA

0E
EF
AB

86

8B
0

BA

4A
F7

08
B8

4
DA

B8

B4
EF
7

3. a. Explaindifferent factors influencing Plant Layout. [10]


6
70

BA
D8
8A

88
9E

4C
AF

F0
B8

F
0B

b. Jobs each of which must be processed on the machine M1, M2, ........... M6. The processing
0E

A7
6
ED

CE
D8
8A
7
4A

times in hrs are given (i) Find the optimal sequence. (ii) Minimum total elapsed time. (iii) Idle
FB
AF
E9

74
8
0B

times associated with machines.


AB

6
ED
A0

BA
8
7

8D
AF

8
E9
44

6F
0B

AB
ED
8B

A0

D8
7
AF

B8
08

E9
44

B8
EF

ED
8B

70
A0

8A
AF
8

E9
44

0B
F0

D
8B

A0
CE

F7
9E
8

44

DA
F0
74

0E

29376 Page 1 of 2
8B
BA

CE

4A

9E
8
F0
74
6F

0E
B4
BA

CE

4A
88

AB8D86FBA74CEF088B44A0E9EDAF70B8
F0
74
6F

B4
6F EF 4A DA AB
BA 08 0E F7 8D
74 8B 9E 0B 86
6F CE 44 DA 8A FB
BA F0 A0 F7 B8 A7
74 8 8B E9 0 D8 4C
ED B8 6F EF
CE 44 AB BA
F0 A0 AF
8 08

6.
5.
4.
74 8 8B E9 70 D8 74 8B
CE 44 ED B8 6F CE 44
AB F0 A0

29376
F0 A0 AF BA
8 E9 7 8 D8 74 88 E9
8B ED 0B CE B4 ED
44 8A 6F 4A AF
BA F0
AF 0E 7

activity.
F0 A0 B8 88
88 E9 7 0B D 7 4C B4 9E 0B
B4 ED 8A 86 EF8A 4A DA
4A FB B8 F7
B8 AF 08 0E
0E D8 7 8B 9E A7
4 0 B8
D8
B4 9E 0B
8 6 C E 4 4 D A 6F
4A D AB FBA F0 A A F7 B BA
0E
AF
70 8 D8 74 8 8B
0E
9E 0B
8D
86
74
CE
9E B8 6 C E 4 4 DA 8 A FB
DA AB FBA F0 A0 F B8 A
F0
88
F7 8D 7 88 E9 70 D8 74
0B 8 4 C B B 8 6 C E
B4
8A 6 EF 4 4A
ED
AB F BA F0 4A
FB AF 88 0E
B8 A7 08 0E 7 0
8D 7 4 B 9E
D8 4C 8B
44
9E B8 86 CE 44A DA
6F DA FB F0
BA
EF
08 A 0E F7
AB
8D A7 88 0E9 F7
4 B 0B
74 8B 9E 0B 8 C 4 ED 8A
CE 44 DA 8A 6F EF 4A A

a. Explain Pillars of Lean Manufacturing in detail.


BA 08 0E F7 B8
F0 A0 F B8

Page 2 of 2
0
b. Bring out the difference between PERT and CPM.
88 E9 70 D8 74 8B 9E D8
B C B8

b. Explain Production and operations function in detail


4 D 6F
a. Following data refers to the past sales of one product

B4 ED 8 A 6F E 4A A A B BA
4A AF B BA F0
88 0 F 70 8 74
0E
9E 7 0
8D 7 4 B
E9
E B
D8
6F
B8 86 CE 44 DA 8A
DA AB FB F0 A0 B 8
BA

***************************

AB8D86FBA74CEF088B44A0E9EDAF70B8
F7 8D A 8 8B E F7
0B D 74
Use least square method and estimate sales forecasting of year 1992.

74 9E 86 CE
0B
8A 8 6F C EF 44 DA 8 A FB F0
B8 BA 08 A0
E9 F 7
B8
D8
A7
74 8B 0B 4C
D8 C 4 ED 8 6 F
b. What is aggregate planning? Explain aggregate planning strategies in detail

6F EF 4A AB EF
AF BA 08
BA 08 0E 7 8D 7
Paper / Subject Code: 53371 / Operations Planning and Control

4 8B
74 8B 9E 0B
8A 86 C EF 4
CE 44 DA FB
0
information. Construct the network and find the critical path also find the floats for each

F0 A0 F7 B8 A7 88
88 E9 0 D8 4C B4
B4 ED B8
A 6F E 4A
a. The Following activities are involved in a XYZ project are given below along with relevant

[10]
[10]
[10]
[10]
[10]
[10]

4A AF B BA F0 0E
0E 7 8D 7 88
9E 0 B8 86 4 CE B 44
DA AB FB F0 A0
F7 8D A7 88 E9
0B
8A 8 6F
4C
EF
B4
4A
ED
B8 BA 08 0E
D8 74 8B 9E
6 CE 44 D