contractor to supply material in his five different Project. Determine on the basis of operation
rsearch, the maximum profit he will get while supplly to each sitr
D1 D2 D3 Supply
O1 5 1 3 100
O2 8 4 3 300
O3 9 7 5 300
D1 D2 D3 Supply
O1 0 100 0 100 100
O2 0 100 200 300 300
O3 300 0 0 300 300
O4 0 0
300 200 200
14 10 8 12
balanced
0 0 4 12 16 16
8 0 0 0 8 8
6 10 4 0 20 20
14 10 8 12
14 10 8 12
D1 D2 D3 Supply
O1 5 0 0 5 5
O2 0 2 6 8 8
O3 0 7 0 7 7
O4 2 0 12 14 14
7 9 18
7 9 18
total cost 76
464 513 654 867 75
Cannery 2 352 416 690 791 125
3 995 682 388 685 100
Allocation 80
80 65 70 85 300