AIOP_IMS_DI_PTW

Date:1.11.2021
JOB SAFETY ANALYSIS FORM

PTW No.: Job description: Annual shutdown Analysis by Names:


activity for all hT panel
DATE: Reviewed by Name:
HIRA no : Approved by Name:

Instructions:
1. JSA is not an individual job rather it should be done by selected team members to effectively identify hazard and provide control measures accordingly.
2. It shall be conducted prior issuing work permit.
3. Custodian to appoint competent person as issuer who shall conduct JSA along with Initiator, area supervisor and other competent.
4. JSA should be made as per actual steps involved in the activity.
5. There shall be no name, only relevant stakeholders (issuer, initiator, custodian, isolator, gas tester, co-permittee) to be mentioned in responsibility column.

Requests ensure wellbeing check of staff before initiating the activity.

गतिविधि शुरू करने से पहले कर्मचारियों की स्वास्थ्य की अच्छी तरह से जाँच सुनिश्चित करें.

Safeguard / controls to be put in


Sequence of Basic Job Steps Potential Hazards Responsibility
place
P – PPE
 To inspect the work location & obtaining proper 1. Electrical Initiator/Issuer
Die Electric Shoes, Safety
work permit
Helmet, LT Gloves, Arc Flash Suite (40 Cal/cm2)
 Burn injuries/Fatal
with visor (face shield
 To inspect the Tools & PPE’s
 PTW system is followed.
 Tool Box Talk  Job to be carried out by Competent
Person.
 TBT& JSA is Conducted.
 Barricading & Caution sign

 Shutting down the incomer panel from RMU 2. Slip & Trip Eliminate
Initiator/Issuer
Work area is cleaned and Tidy.
 Minor injury
Administrative Controls:
 Periodic monitoring is carried out for
 Discharging power voltage from the Bus any protruding
Chamber  Lux level maintained
 Adequate supervision provided
 Housekeeping is done daily to
prevent the walkways from being
obstructed.
 Workspaces, storage areas and
walkways are clearly Marked.
PPE –
Safety shoes, safety helmet
AIOP_IMS_DI_PTW
Date:1.11.2021
JOB SAFETY ANALYSIS FORM
 Applying LOTOTO 3. Sharp edges P – PPE
Initiator/Issuer
 Cut injury Die Electric Shoes, Safety
Helmet, LT Gloves, Arc Flash Suite (40 Cal/cm2)
with visor (face shield
 To open the LT panel door
 Isolation Done as per LOTO STD.
 Emergency-contact number is
displayed.
 Acrylic sheets will be removed from inside the  Portable equipment test and
panel with hand screwdriver. inspection carried out and is double
insulated.
 Trained first Aider is available at site.
 Providing power supply with junction box  Buddy system is ensured
 Electric shock treatment chart
available.

 Portable Blowing machine is used to blow the 4. Dust PPE: Nose mask & goggles provided
Initiator/Issuer
accumulated dust inside the panel Eye irritation
Breathing difficulties  Trained manpower deployed.
 Checking the nut bolt tightness of the bus bar  Adequate ventilation ensured
feeders  Periodic health surveillance done
 Only auth person permitted.
 ACB servicing & Lubrication work

 Checking the tightness control wires & Power


cable

 Attending all thermography points

 LT panel closing

 Clearing work area & Closing the work permit  To check & confirm the completion of the Estate manager/Initiator/Issuer
work
 Closing work permit

मैंने इस JSA का ध्यानपूर्वक अध्ययन कर लिया है और सहकर्मियों के साथ इस बात को प्रमाणित करता हूँ कि कार्य के दौरान इसमें लिखित निर्देशों का का सुचारू ढंग से पालन जाएगा ।

Name Signature Name Signature


हस्ताक्षर
नाम नाम हस्ताक्षर

Issuer signature initiator signature