JOB SAFETY ANALYSIS FORM
Instructions:
1. JSA is not an individual job rather it should be done by selected team members to effectively identify hazard and provide control measures accordingly.
2. It shall be conducted prior issuing work permit.
3. Custodian to appoint competent person as issuer who shall conduct JSA along with Initiator, area supervisor and other competent.
4. JSA should be made as per actual steps involved in the activity.
5. There shall be no name, only relevant stakeholders (issuer, initiator, custodian, isolator, gas tester, co-permittee) to be mentioned in responsibility column.
गतिविधि शुरू करने से पहले कर्मचारियों की स्वास्थ्य की अच्छी तरह से जाँच सुनिश्चित करें.
Shutting down the incomer panel from RMU 2. Slip & Trip Eliminate
Initiator/Issuer
Work area is cleaned and Tidy.
Minor injury
Administrative Controls:
Periodic monitoring is carried out for
Discharging power voltage from the Bus any protruding
Chamber Lux level maintained
Adequate supervision provided
Housekeeping is done daily to
prevent the walkways from being
obstructed.
Workspaces, storage areas and
walkways are clearly Marked.
PPE –
Safety shoes, safety helmet
AIOP_IMS_DI_PTW
Date:1.11.2021
JOB SAFETY ANALYSIS FORM
Applying LOTOTO 3. Sharp edges P – PPE
Initiator/Issuer
Cut injury Die Electric Shoes, Safety
Helmet, LT Gloves, Arc Flash Suite (40 Cal/cm2)
with visor (face shield
To open the LT panel door
Isolation Done as per LOTO STD.
Emergency-contact number is
displayed.
Acrylic sheets will be removed from inside the Portable equipment test and
panel with hand screwdriver. inspection carried out and is double
insulated.
Trained first Aider is available at site.
Providing power supply with junction box Buddy system is ensured
Electric shock treatment chart
available.
Portable Blowing machine is used to blow the 4. Dust PPE: Nose mask & goggles provided
Initiator/Issuer
accumulated dust inside the panel Eye irritation
Breathing difficulties Trained manpower deployed.
Checking the nut bolt tightness of the bus bar Adequate ventilation ensured
feeders Periodic health surveillance done
Only auth person permitted.
ACB servicing & Lubrication work
LT panel closing
Clearing work area & Closing the work permit To check & confirm the completion of the Estate manager/Initiator/Issuer