50203-2003
aehe) RSE
National Standard of the People's Republic of China
. BARU
D pegot Construction Quality of Masonry
me” Engineering
Ne
GB50203-2002
Compiled by: Department of Development of Shanxi Province
Approved by: _ the State Ministry of Construction of the People’s Republic of China
Implemented on: April 1, 2002
Beijing 2002Notice of Approval on Issue of Code for Acceptance of
Construction Quality of Masonry Engineering
J.B. [2002] No. 59
‘As per the demand of Notice on Issue of Formulation and Revision Plan of State
Code for Construction 2000 to 2001 (J. B. [2001] No. 87), the Department of
Development of Shanxi Province has jointly revised Code for Acceptance of
Construction Quality of Masonry Engineering. We have carried out inspection with
certain authorities and hereby approve as the state code, serial number as GBS0203-
2002, implemented from April 1, 2002. In which, clauses 4.0.1, 4.0.8, 5.2.1, 5.2.3,
6.1.2, 6.1.7, 6.1.9, 6.2.1, 6.23, 7.1.9, 7.2.1, 8.2.1, 8.2.2, and 10.0.4 are obligatory that
have to be carried out strictly. The original Code for Acceptance of Construction
Quality of Masonry Engineering GB50203-98 abolishes at the same time
The Ministry of Construction will be responsible for the management and
explanation on the obligatory clauses, The Administration of Construction of Shanxi
Province will be responsible for the explanation on the detailed technical contents,
and the Standard Ration Research Institute of the’ Ministry of Construction will
organize the China Planning Publishing House to issue the publication.
The Ministry of Construction of the People’s Republic of China
March 15, 200210.
ul
yeeee
Contents
General principles...
‘Terms...
Basic regulations..
‘The mortar in the masonry construction.
The engineering of the brick masonry
5.1 General regulations
5.2 The master items
5.3. The common items
The masonry engineering of the concrete smal{ size hollow bricks...
6.1 General regulations
6.2 The master items
6.3 The common items
The masoncy engineering of the stone:
7.1. General regulations
7.2 The master items
7.3 The common items
The masonry engineering of the reinforced masonry...
8.1 General regulations
8.2 The master items
8.3 The common items
The masonry engineering of the filling in walls...
9.1 General regulations
9.2 The master items
9.3 The common items
Construction in winter...
‘The construction inspection and acceptance on the sub-engineering
Attachment A The quality acceptance recorder of the masonry engineering
inspected
batch... 5 +30
Attachment B_ The explain of the words in this inspection. 361 General principles
1.0.1 To tighten to quality control of the construction engineering, unify the inspection
and acceptance of the construction quality of masonry engineering and to
guarantee the quality of the whole engineering, this code is hereby formulated.
1.0.2 This cade is suitable for the construction quality control and acceptance of the
bricks, stones, concrete small-size hollow bricks, and evaporized and
pressurized concrete bricks.
1.0.3 This code is accomplished with the state standard Unified Code for acceptance
‘of construction quality of construction engineering GBS0300-2001.
1.0.4 The requirement of the construction quality specified in the technical documents
and contracts should not be lower than in this code.
1.0.5 The acceptance requirement of the masonry engineering not only should accord
with this code, but also should accord with the current state code.2.0.1
2.0.2
2.0.3
2.0.4
2.0.5
2.0.6
2.0.7
2. Terms
Control grade of construction quality
To grade the construction technique level according to the main points of
quality control and quality guarantee.
Type inspection
The inspection can test the result after using of the products or the process.
Continuous seam
In the masonry, the connection length of the upright surface bricks should be
less than the specified value.
Supposititious seam
To conceal to quality bug of the vertical seam in the masonry, seams to be
made only on the surface of the masonry while constructing.
Reinforced masonry
The general call of the meshy reinforced masonry poles, vertical reinforced
masonry walls, stone masonry and masonry poles with stone masonry and
reinforced steel bar concrete surface ot reinforced steel bar mortar surface,
the combined wall of the stone masonry and reinforced steel bar pole and the
bricks of the reinforced masonry sheating forte wall.
Core column
The inside reinforced steel bar concrete pole formed after pouring the
concrete to the boliow masonry with vertical reinforced steel bar of the
masonry.
Inspection at original space
With the standard inspection way, to inspect the masonry at the spot with
little or without any destroy, so as to identify the intensity of the masonry
mortar and the body of the masonry.3.0.1
3. Basic regulations
All the materials used in the masonry engineering must have the qualification
certificate and the product performance report. The blocks, cement,
reinforced steel bars and the external reactant should have the second
performance report when transported to the spot. All the materials eliminated
by the state are forbidden for using.
3.0.2 To check the size that can be reduced or broaden before building the masonry
base. The permitted error should according to the specification in form 3.0.2.
Form 3.0.2 The permitted size of the error
Length(L), Width(W) | Error(mm) Length(L), Width(W) | Error(mm) |
Lor B)s 30 #5 601600(kw/im3)_| The density of the masonry 1300—1600(kg/mn3)
's of wall | Wind load(Kn/m2) ‘Wind load(Kn/m2)
(pole) 0.3(about = 7 | 0.4(about 8 | 0.5(about 9 | 0.3(about 7 | 0.4{about 8 | 0.5(about 9 grade
(mm) grade wind) | grade grade grade wind) | grade wind)
wind) wind) wind)
190 ~ : - 14 Ld 0.7
240 2.8 21 14 2.2 17 Ld
370 5.2 3.9 26 42 32 21
490. 8.6 6.5. 43 7.0 5.2 3.5
620 14.0 10.5 70 14 8.6 57
‘Note: I. This form is suitable for the construction spot where the relative height is
within 10m, When 10m20m, it
should use anti-commutation failure checking computations to confirm
the permitted free height.
2. When the walls being built have across’ walls or have connection with
other construction, and the distance is less than 2 times of the listed in
the form, the construction height can be free from the specification of
this form.
3.0.9 It should find the plane when lay the masonry peak side of the prefab gitder
and board, and fill in the mortar while install. While there’s no limitation of
the design, the 1:2.5 cement mortar should be used.
3.0.10 The quality control of the masonry engineering construction can be divided
into three grades and to be accord with the specification listed in form 3.0.10.
Form 3.0.10 __the grade of the quality controt for masanty construction
[items ihe grade of the quality control for masonry construction
a B Cc
‘Quality control in| With right system and | With almost right | With systems; the
construction site canbe implemented | system and just ean be | quality supervisors not
very strictly; the | implemented; the | from the construction
quality supervisors not | quality supervisors not | side are rarely come to
from the construction | from the construction | the construction. site;
side are usually come | side are | there are technical
to the construction | discontinuously come | staff on the post from
site, or there are no |to the construction | the construction side
permanent delegates | site; there are
in the construction | professional technical
site; there are | staff on the post from
professional technical | the construction side
staff on the post from | with post certificate.
the construction side,
all are on duty, and
have post certificate.
mortar an
The intensity of the |The trial block is] The trial block is] The intensity is met
id concrete | made according to the | made according to the | the requirement of the |
specification. The | specification. The | acceptance with large |intensity 1s met the | intensity is met the | discrete.
requirement of the | requirement of the
acceptance with less | acceptance with small
disorete. discrete.
‘The way of mixture | Mixed by machines | Mixed by machines | Mixed by machines or
the mortar with strict proportion. | with common } manually with bad
proportion. proportion
The masonry | The staff holding the | The staff holding the | The staff are above
construction workers | post of over the | post of intermediate | the junior level
intermediate level , of | and senior level are
which the senior level | not less than 70%
are more than 20%
3.0.11
3.0.12
3.0.13
3.0.14
If the reinforced steel bar in the masonry seam set in the moisture
environment or chemical corrosive medium, antisepsis action must be
conducted.
During the construction of the masonry, the load of the floor and the roof is
forbidden to exceed the permitted load value. The temporary support action
should be conducted under of floor, which is the feed-in place of the
construction.
The acceptance of the sub construction should on the basis of the acceptance
of the inspecting batch. The division of the inspecting batch can according to
the step of the construction.
All the main controlled items of the masonry engineering should meet the
specification of this code while being inspected; there should be more than
80% selected spot of the common items meet the specification, of the error
are within the permitted windage range.4.0.1
4.02
4.03
4.0.4
4.0.5
4. The mortar in the masonry construction
Before the cement enter the site, inspection on the intensity and safety
should be conducted in batches should be conducted. The batch should
be divided according to the same manufacture, the same serial number.
‘When there is doubt on the quality of the cement during the usage or the
cement has been manufactured more than three months(one month for
fast vuleanize silicate cement), callback inspection should be conducted
and use the cement according to the inspection results,
Do not mix the cement with different brands.
The sand used in the mortar can not have hazardous substances. The mud
proportion of the sand should meet the following requirements:
1. For the cement mixture mortar, which the intensity grade is more than
MS, the proportion of the sand should not exceed 5%;
2 For the cement mixture mortar, which the intensity grade is less than MS,
the proportion of the sand should not exceed 10%;
3. For manually sand, mountain sand and super slender sand, they must be
tested for compound before use to see if can meet the requirements of the
masonry mortar technical specification.
The dehydration scleroses lime cream can not be used while collocating the
cement lime mortar.
Hydrated lime is forbidden to use direetly in the masonry mortar.
The water used in the mixture of the mortar must meet the current state code
Specifications of Water Used for Mixture the Concrete JG363.
40.6
4.0.7
The proportion of the masonry mortar should be confirmed by the test
collocation. The proportion should be confirmed again when the composition
of the mortar changed.
The intensity grade of the mortar should be confirmed over again when use
cement mortar instead of cement mixture mortar during the construction.
4.0.8
4.0.9
4.0.10
When organic plasticizing agent, early-strength admixture, retarder and
antifreeze have been added into the mortar, they only ean be used after
inspected to be qualified. There are should be type inspection report of
the masonry intensity for organic plasticizing agent,
When mix the mortar at the construction site, the sub materials of each group
should be calculated by weight.
It should use machine 10 mix the masonry mortar, the mixture time should
according to the following specification, calculating from the completion the
materials filling.
1. Here are should be more than two minutes for cement mortar and cement
‘mixture mortar;
2, There are should be more than three minutes for cement powder and coal
ash mortar and mortar added with additional crear,
3. There are should be three to five minutes for mortar added with organic
plasticizing agent.4.0.11 The mortar should be used right after mixed. The cement mortar and cement
mixture mortar should be used within three and four hours respectively; and
within two and three hours respectively when the highest temperature is more
than 30°C during the construction,
Note: For the mortar added with retarder, the using time can be prolonged according to the specific
situation,
4.0.12 The intensity qualification standard for building mortar testing block at
acceptance shall meet with the following specifications:
‘The average value of the anti-press intensity of the same acceptance batch
should be more than or the same as the cube intensity corresponding to the
designed anti-press intensity grade. The lowest value of the anti-press
intensity grade of the same acceptance batch should be more than or the same
as the 0.75 times of the cube intensity corresponding to the designed anti-
press intensity grade.
Note: 1 There are at lease three groups of the testing batches for the same type
and the same intensity grade in the acceptance batch of the masonry mortar,
When there is only one group of testing batch in the same acceptance batch,
the average value of the anti-press intensity grade must be more than or the
same as the cube intensity corresponding to the designed anti-press intensity
grade.
‘2. The intensity of the mortar should be conserved according to the
specification of the anti-press testing result of the block with the duration of
28d.
The quantity of the spot check: The kinds of types and intensity grades of
masonry mortar for each testing batch within 250m’ masonry, at least one
time inspection on each mixture is demanded.
‘The way of inspection: To take the mortar testing block at the exit of the
mixture at random(one group of testing block in the same mixture time), and
to test the intensity report of the testing block at last.
4.0.13 When the following institution appears during the building or the inspection,
the mortar and the intensity grade of the masonry body can be tested locally,
at the original site or taking samples, to identify the intensity grade,
1 The testing block of the mortar is lack of representative or insufficiency.
2. There are doubt or conflict on the results of testing block of the masonry.
3 The results of the masonry testing block can not meet the requirements
of the design.
n5 The engineering of the brick masonry
5.0 General regulations
5.0.1 This chapter is suitable for the masonry engineering of agglomerating the
common bricks, agglomerating the perforated bricks, steaming and pressing the
sand lime bricks and the fly ash bricks.
5.0.2 The bricks used for dry walls and the surface of the pole should be trimness on
the comers and coloury.
5.0.3 The masonry body of the underground or under the damp proofing course
should not use the perforated bricks in the areas of with frost heaving
environment or condition,
5.0.4 The bricks should be pour liquid on one or two days before building the
masonry body.
5.0.5 The length of the spreading plasma should be less than 750mm when use
spreading plasma while building the bricks. The length of the spreading plasma
should be less than S00mm when the temperature is exceed 30°C during the
construction term.
5.0.6 The brick piling should be carried out on the highest layer of bricks of each
layer of wall of 240mm mail wall, stage level of the brick masonry and the
extruding course.
5.0.7 The seams, which the bricklaying is higher than the girder, should be built as the
triangle shape. The width of the seams should be more than Smm on the bottom
surface of the girder; while be less than 15mm at the top side of the girder.
The width of the internal to the arch should not be less than 20mm. There is
should be 1% cove at the bottom of the arch.
5.0.8 The moulding boards, of which the bricks are exceeding the girder, only can be
removed when the intensity grade of the masonry seam is not less than 50% of,
the designed value.
5.0.9 The holes of the perforated bricks should be upright to the pressed surface while
being built.
5.0.10 The period of the steamed and pressed bricks of should be longer than
twenty- eight days while being built in the construction.
5.0.11 Transparent seams, blind seams and bastes are forbidden for vertical seams.
5.0.12 The connection of the temporary broken part of the masonry should be
washed clean before being rebuilt, and to fill in the mortar to keep the seam
straight and plain,
5.1 The master items
5.2.1 The intensity grade of the bricks and mortar must to accord with the
designed requirements.
The quantity of the take out samples: after the bricks of each manufacture
arrived to the building site, each batch have 150,000 pieces of the clinker
bricks, 50,000 pieces of the perforated bricks, 19,000 pieces of the sand limb5.2.2
5.2.3
5.2.4
bricks and the fly ash bricks, as one group. The quantity of the samples of the
masonry testing bricks is according to the specification of 4.0.12.
Testing method: to check the testing reports of the bricks and mortar.
The satiation of the mortar on the vertical seams of the masonry should not,
be less than 80%,
The quantity of the take out samples: there are should be more than 5 parts
for each testing batch.
Testing method: to test the area of the adhesive spoor of the bottom of the
bricks and mortar with hundred-grid net. To test three bricks on each parts
and take the average value of the three.
The corners and connection of the masonry must be built at the same
time. To build the inside and outside walls separately without any
available measure is forbidden. For the circumstance of can not to be
built at the same time and must to obligate the temporary gap, the gap
must to be built as inclined stubble. The length of the vertical projection
of the inclined stubble must be longer than 2/3 of the height of itself.
The quantity of the take out samples: to test 20% of inclined stubble of each
testing batch and should be more than 5 parts.
Testing method: test by inspecting
In the area, where the grade of the non-anti-earthquake fortify and anti-
earthquake fortify is six and seven grade, the temporary gap can be obligated
as straight stubble except at the comers when inclined stubble can not be
obligated, The straight stubble must be built as protruding stubble. The
agglomerated reinforced steel bar should be put in the place with straight
stubble with the amount of 196 for each 120mm thick wall (2$6 reinforced
steel bar for 120mm thick wall), the space alone the height of the wall should
not exceed 500mm, All the length of the buried-in from the stubble should
not be shorter than 500mm, and should not be shorter than 1000mm in the
area where the anti-earthquake fortify is six or seven grade. There should be
bend catch with 90 degree angle at the end of the wall, (Fig. 5.2.4)
‘The quantity of the take out samples: to test 20% of inclined stubble of each
testing batch and should be more than 5 parts.
‘Testing method: observe and measure
The specification for approval: the obligated stubble and the diameter are
right, the vertical space error is less than 100mm, and the length of the
obligation is almost accord with the specification.5,
2.3 The permitted error of the position and upright degree of the masonry should
be accord with specification in the form 5.2.5,
Form 5.2.5 _ the permitted error of the position and upright degree of the masonry
No Project Permitted error (mm) _| Testing method
T |The excursion of the| 10 To test with theodolite
position of axes and measute or any other |
instruments.
2 | Upright | Each layer 3 To test with 2m line
degree board
The [10m [20 suspend line and ruler or
height i any other instruments
5,
5,
5,
The quantity of the take out samples: for all the axes, the supported wall pole
should be tested. Check the extruding angle for the entire height of the verticality
of the external wall. They should be checked at least four parts, one part for each
20m of each layer. Check 10% of the typical rooms for the internal wall, at least
three rooms, at least 2 parts and 5 poles in one room.
5.3 The Common Items
.3.1 The building method of the masonry body should be right. The wrap building
way is forbidden to use for interleaving up and down seams, building to link to
inside and outside walls and brick poles.
The quantity of the take out samples: one part each 20m for external wall, three
to five meters for each part and at least three parts. Check 10% of the typical
rooms for the internal wall, at least three rooms.
Testing method: observe
The specification for approval: besides to meet the requirements of this term, the
dry walls and walls between the windows should have no seams, The seams on
the wet walls which are longer than 300mm should be less than three and can
not be on the same wall.
3.2 The seams of the masonry body should be horizontal, even, vertical and straight,
and should be in even thickness. The thickness of the horizontal seam should be
10mm, within the scale of 8mm to 12mm.
‘The quantity of the take out samples: for the masonry being built in each step of
the falsework, one part each twenty meters.
Testing method: to measure with ruler the height of the masonry for ten husk
and calculate.
3.3 The permitted error for general measurement of the masonry body should be
accord with the specification in form 5.3.3.Form 5.3.3 _ the permitted error for general measurement of the masonry body
room
No | Project Permitte | Testing method The quantity
derror of the
(mm) samples
T_ |The tip surface of the [+15 | To check with theodolite and | Should _ not)
base and the elevation ruler be less than
of the floor 5 parts
2 [The | Dry wall [3 To check with two meters | 10% of the
level off | and pole alongside ruler and triangle | typical
of the [Wet wall | 8 shaped ruler rooms, and
surface | and pole should not
be less than
three rooms,
at least two
parts in each
room
3 | The height and width | #15) To check with ruler 10% of the
|” | of the windows and holes of the
| | doors(the back stuft) testing
batch,
: should not
be less than
five parts
4 |The excursion of the | 20 Based on the window in the | 10% of the
up and down windows dottom, to check with | testing
on the outside wall theodolite and suspend ine | batch,
should not
be less than
five parts
3 |The grade | Dry wall [7 To check with ten meters| 10% of the |
of line and rulers typical =|
horizontal rooms, and
and even | Wet wall [10 should not
of the be less than
vertical three rooms,
seam at least two
| parts in each
\ room
6 |The shape crack | 20 Based on the first husk brick | 10% of the
seam on the dry wall of each layer, to check with | typical
suspend line and rulers rooms, and
should not
be less than
three rooms,
at least two
parts in each |
1s6 The masonry engineering of the concrete smal} size hollow bricks
6.0 General regulations
6.0.1 This chapter is suitable for the acceptance of construction quality of he common
concrete small size hollow bricks and the lightweight aggregate concrete small
size hollow bricks (small size bricks for short hereinafter)
6.0.2 The age of the small size bricks used in the construction should be less than
28d.
6.0.3 When laying small size bricks, the feculence on the surface and the rough edge
on the bottom of the hole of the bricks used as the button stems should be
cleaned. And the bricks of the unqualified presentation quality should be picked
out.
6.0.4 The mortar used in the construction should select special one for the masonry of
the small size bricks.
6.0.5 The masonry under the indoor ground course of the bottom floor or under the
damp proof course should adopt the holes made with the full filled concrete
bricks whose intensity grade should not be less than C20.
6.0.6 When laying small size brick in the dry and buming hot weather, the water may
be sprinkled to moisten small size bricks in advance. The lightweight aggregate
concrete small size bricks may be watered in advance. If there is water on the
surface of the small size bricks, the construction is prohibited.
6.0.7 The cracked small size bricks are not allowed to use in the construction of
the bearing wall body.
6.0.8 The small size bricks wall body should be laid in the way of the stagger joint
according to holes. And the length of the seam should be less than 90mm. When
the separate parts of the wall body can not meet the previous conditions, the
binding steel bars or the steel bar net slices should be installed in the seams. But
the vertical straight seams still should not exceed two pieces of small size bricks.
6.0.9 The small size bricks should be laid on the wall inversely with the bottom-
side up.
6.1.10 The concrete poured to form the button stems should adopted the special
concrete poured hole small size bricks. When the common concrete is
adopted, the slump constant should not less than 90mm.
6.1.11 When pouring the button stem concrete, the following rules should be obeyed:
1. The sundries in the holes, such as the mortar etc., should be cleaned,
and flushed with the water.
2. When the intensity of the masonry mortar is greater than IMpa, the
button stem concrete may be poured.
3. Before pouring the button stem concrete, the proper quantities of the
stone-cleaned sanded cement grout same with the button stem conerete
should be poured, then the conerete is poured.
6.1.12 When the small size bricks need to be moved or the small size bricks are
impacted, they should be laid again.
166.1 The master items
6.1.1 The intensity grade of the small size bricks and the mortar should be meet
the demand of the design,
The quantity of the spot check: Every manufacturer, one group should be
inspected casually per ten thousand small size bricks. For the small size bricks
used in the construction base and the base course of the multistoried, The
quantity of the spot check should not less than 2 groups. The quantity of casual
inspection of the mortar test blocks should observe the regulation 4.0.12 in this
record,
The way of inspection: Refer to the test report of the small size bricks and the
mortar.
6.1.2 The satiation grade of the mortar of the horizontal masonry seams should not be
less than 90% computed according to the net area. The satiation grade of the
mortar of the vertical masonry joints should not be less than 80%, and the beard
of the vertical seam should be infilled with the masonry mortar. The hidden
seams and the transparent seams should not exist.
The quantity of the spot check: the places sampled from every verification set
should not be less than 3.
The way of inspection; To measure the bonding ttace of the small size bricks and
the mortar, 3 small size bricks should be measured every place, and the average is
the result.
6.1.3 The corner of the wall body and the junction of the cross walls should be
built at the same time. The temporary intermittence should be built
crosswise, and the horizontal projection length should not be less than 2/3 of
the height.
‘The quantity of the spot check: the 20% junctions should be sampled from
every verification sets
‘The way of inspection: observation inspection.
6.1.4 The axial line displacement and the verticality displacement of the masonry
should observe the regulation 5.2.5 in this record.
6.2 The common items
62.1 The vertical seam thickness and the horizontal seam width of the wall body
should be 10mm, but not greater than 12mm and not less than 8mm,
‘The quantity of the spot check: the amount of the inspection points every floor
should not be less than 3.
The way of inspection: To reduce the height of 5 pieces of small size bricks
measured with the rule and the length of the 2m masonry.
6.2.2 The allowable deviation of general size of the small size bricks wall body should
observe the regulation 5.3.3 and the items 1~S in the form 5.3.3 in this
regulation,7 The masonry engineering of the stones
7.1 General regulations
7.1.1 The texture of the stones used in the stone masonry should be compact, and
without the decency and cracks. The stones used in the dry walls and the pole
surfaces should be colory.
7.1.2 The extraneous components, such as the mud and the inerustation, on the surface
of the stones should be cleaned before building.
7.1.3 The joint thickness of the stone masonry: the coarse stones and the rubble ashlar
should not be greater than 20mm. The fine stones should not be greater than
Smm,
7.1.4 After the mortar coagulates initially, if the laid stones need to be moved, the
original mortar should be cleaned, and the stones should be laid over again.
7.1.5 The first stone to build the rough ashlar base should coat the mortar and the
bigger plane should be downward, The stones of the first layer to build the
construction base should coat the mortar, and the layer should be built as the t-
shaped one.
7.1.6 The first layer, the comers, the junctions and the holes of the rough ashlar
masonry should use the bigger flat rough ashlar. The highest layer of the
masonry of every floor( including the base) should use the bigger rough ashlar.
7.1.7 The building of the earth-retaining wall should observe the following
regulations:
1. Every 3~4 layer is one delamination height which should be leveled
once,
2. The seam thickness of the exposed plane should not be greater 4mm,
the stagger joint between two delamination heights should not be less
than 80mm.
7.1.8 If the middle part of the tearth-retaining wall is made of the rough ashlar, the
length by which the t-shaped stones extend into the rough ashlar should not be
less than 200mm.
.9 If there is no regulation for the design of the flush hole, the construction
should observe the following regulations:
1. The flush holes should located evenly. One flush hole is located at
intervals of about 2m every 1m in the height.
2. The grait or the reduced stone should be paved as the drainage
layer whose heigh and weigth are 300mm and whose thickness is
200mm between the the flush hole and the soil body.
7.1.10 The fill of the inner side of the earth-retaining wall should be
pounded hierarchically. The thickness of the hierarchical loose earth should be
300mm. The soil surface of the top of the wall should be made as the proper slope in
order to lead the running water to the outside of the earth-retaining wall.
7.2 The master items
7.2.1 The intensity grade of the stones and the mortar should meet the demand of
18the design.
1. The quantity of the spot check: One group should be sampled from the
identical habitat. The quantity of the spot check of the mortar test block
should observe the regulation 4.0.12 in this regulation.
2. The way of inspection: the verification of the stone should refer to the
certificate of the product quality. The verification of the stone and the
mortar should refer to the test report of the test block.
7.2.2 The fullness grade of the mortar should not be less than 80%
The quantity of the spot check: the places sampled from one batch should not,
be less than 1.
The way of inspection: To observe.
7.2.3 The allowable deviation of the axial line position and the verticality of the stone
masonry should observe the specification of the form 7.2.3.
Form 7.2.3 The allowable deviation of the axial line position and the verticality
of the stone masonry
Item | Items Allowable deviation(mm) Way of
numbe rough Ashlar | Stone masonry | inspection
r masonry, |
‘base | wall | Coarse stone | Rubble Fine
ashlar ashlar
base | wall | base | wall | Wall,
pole
1 ‘Axial line position | 20 15 | 20 15 [15 [10 | 10 | Inspecting with
the altometer and
the rule or other
measuring
apparatus
2 Verticali | Every 20 20 10 [7 [Inspecting with |
ty of| floor the _altometer, |
wall suspension wire
surface and rule, o other
Full 30 30 5 [20 _ | measuring
depth apparatus.
The quantity of the spot check: For the exterior wails, one position should be
inspected every 20m as per one floor (or within 4m in height), every position
extend by 3m, but the inspected positions should not be less than 3. For the inner wall,
the 10% of the typical natural space should be inspected, but the inspected spaces
should not be less than 3. The inspected places should not be less than 2, and the
inspected poles should not be less than5.
7.3 The common items
7.3.3 The allowable deviation of the stock size of the stone masonry should observe
the specification in the form 7.3.4.
‘The quantity of the spot check: For the exterior walls, one position should be
inspected every 20m as per one floor ( within 4m in height), every position
extend by 3m, but the inspected positions should not be less than 3. For the inner
19wall, the 10% of the typical natural space should be inspected, but the inspected
spaces should not be less than 3. The inspected places should not be less than 2,
and the inspected poles should not be less than5.
Form 7.3.1 The allowable deviation of the stock size of the stone masonry
Item] Hems ‘Allowable deviation Way of inspection
no. Rough ‘Stone mortar
| ashlar
mortar
‘base [wall | base | wall | base | wall | Wall,
pole
T Height mark of | #25 [21 | £25 [21 [#15 [215 [£10 | Inspection with the
the Base and the 5 5 balance level and the rule
wall masonry top
plane
2 Thickness of the [+30 [+20 |+30 [420 [415 [+10 [+10 | Inspection with the rule
masor 10 -10 ~5_|-5 |
3 Surfa [Dry | - 20 | - 20 [- 10 |S Fine ashlar should be
ce | wall, inspected with the and
| sm | pole guiding ruler of 2m the
oot [Earth |- [20 |- [20 |- ,[15 |- | Wedge-type feeler, others
hhne | wall, should be inspected with
ss | pole the 2m wire drawn
according to two rulers
1 vertical to the seams _|
a Flainess of the|- [- |- |- |- 10 [3 | Inspection with the 10m |
seam of the dry wire and the rule
wall L
7.3.4 The form of the group building of the stone masonry should observe the
following specifications:
Building between the inner and the outer, building stagger joints between the
upper and the lower.
The stone on the rough ashlar wall should not be less than 1 every 0,7m? of
wall area,
The quantity of spot check: For the exterior walls, one position should be
inspected every 20m as per one floor (or within 4m in height), every
position extend by 3m, but the inspected positions should not be less than 3
For the inner wall, the 10% of the typical natural space should be inspected,
but the inspected spaces should not be less than 3.
The way of inspection: To observe8 The masonry engineering of the reinforced masonry
8.1 General regulations
8.0.1 The masonry engineering of the reinforced masonry should observe the
regulations in the chapter 5 and 6 besides the demands in this chapter.
8.0.2 Before filling the concrete into the constructional column, the position of the
retaining pole and the template should be watered moist, The floor ash, the brick
residues and other sundries in the template should be cleaned, and the stone-
cleaned sanded cement grout of the proper quantity same as the construction
pole concrete should be filled in the connection plane. When vibroing, the wall
body should be protected from impacting. The vibration propagation through the
wall body is forbidden.
8.0.3 The length of the anchoring installed in the horizontal seam of the masonry
should not be less than 50d, and the length of its horizontal or vertical fold
should not be less than 20d and 150mm. The length of the lap joint of the steel
bar should not be less than 55d.
8.0.4 The masonry shear wall of the building blocks of the reinforcing bars should
adopt the special mortar of the small size bricks masonry and the special
hole-filled concrete of the small size bricks.
8.1 The master items
8.1.1 The kind, the specification and the quantity of the steel bar should observe
the demand of the design,
The way of inspection: To inspect the certificate of qualification of the steel
bars, the test report of the steel bar performance and the potential engineering
records.
8.1.2 The intensity grade of the concrete and the mortar of the constructional
column, the button stem, the combined masonry structural parts and the
reinforcing bars masonry shear wall structural parts should meet the
demands of the design.
The quantity of spot check: For all kinds of structural parts, one group of test
blocks should be made at least every baich of masonry to be inspected.
The way of inspection: To refer to the test report of the test blocks of the
conerete and the mortar.
8.1.3 The joint of the constructional and the wall body should be build as the combed
joint. The combed joint should be withdrawn firstly and moved forward late.
The position preformed for the binding steel bars should be correct. Optionally
folding is not allowed under construction.
The quantity of spot check: The 20% constructional columns every inspection
batch should be sampled, and not be less than 3 places.
The way of inspection: To observe.
The criterion of qualification: The vertical dislocation of the steel bars should not,
be greater than 100mm. The size of the combed joint along the direction of heightshould not be greater than 300mm. The vertical dislocation of the steel bars and
the size deviation of the combed joint should not exceed 2 places every
constructional column,
8.1.4 The position of the constructional columns and the allowable verticality
deviation should observe the specifications in the form 8.2.4.
Form 8.2.4 the allowable size deviation of the constructional columns
= ‘Allowable
~ Items deviation Way of inspection
(mm)
Inspecting with the
1 | Position of the pole center line 10 | altometer and the ruler or
other measuring apparatus
a Inspecting with —_the |
2. | Dislocation between two pole 8 | altometer and the ruler or |
vy other measuring apparatus _|
Inspecting with the wire
Every layer 10 | pallet of Sn
A Pole = 15 | inspecting with the
Verticality | Full | 10m altometer, the suspension
depth wire and the ruler, or other
210m | 20 * | measuring apparatus
The quantity of spot check: 10% should be sampled every inspecting batch at
least, and not be less than 5 places.
8.1.5 For the small size hollow bricks masonry of the reinforcing bars
conerete, the button stem concrete should be cut through at the fabricated floor and
the sectional size of the button stem should not be weakened.
The quantity of spot check: The 10% constructional columns every
inspection batch should be sampled, and not be less than 3 places.
The way of inspection: To observe.
8.2 The common items
82.1 The steel bars installed in the vertical seam of the masonry should be
installed in the seam centeredly. The thickness of the vertical seam should be greater
than the diameter of the steel bar by more than 4mm. The thickness of the mortar
covering layer of the exposed plane of the masonry should not less than 1Smm.
The quantity of spot check: 3 constructional parts should be sampled from
one batch to be inspected. 3 places should be inspected every constructional part
The way of inspection: To observe aided with the steel ruler.
8.2.2 The prevention of corrosion of the steel bars stalled in the seams of
the masonry should meet the specification of the item 3.0.11 in this regulation.
The quantity of spot check: 10% steel bars should be sampled from one
batch to be inspected.
The way of inspecting: To observe.
The ctiterion of qualification: The anti-corrosive paint should not miss
brushing( soaked). The desquamation owing to the expansion scab scale should not exist.
8.23 In the reticulate reinforcing bars masonry, the mesh reinforcement
and its arrangement spacing interval should meet the demands of the design.
2The quantity of spot check: 10% should be sampled from one batch to be
inspected, and 5 places at least should be sampled.
The way of inspecting: The specification of the steel bars should refer to the end
products of the mesh reinforcement. For the inspecting of the spacing interval of
the mesh reinforcement, the local seam should be picked for observation, or the
seam should be pierced into with the probe for observation, or the steel bars
location determinator should be used to determinate.
The criterion of qualification: The location of the mesh reinforcement along the
height of the masonry which exceeds the specification of the design by one layer
of bricks should not be more than 1.
8.2.4 For the combined bricks masonry constructional parts, the vertical bearing steel
bars protective layer should meet the demands of the design, the distance apart
from the surface of the bricks masonry should not be less than Smm. The tow
ends of the binding steel bar should have hooks. The location of the binding
steel bars and the hoop reinforcement should be correct,
The quantity of spot check: 10% should be sampled from one batch to be
inspected, and 5 places at least should be sampled.
The way of inspecting: To observe and measure with the ruler before making the
template, .
The criterion of qualification: the steel bars protective layer should meet the
demands of the design. 80% of the location of the binding steel bars and the
making of the hooks should meet the demands, The locations where the spacing
interval of the hoop reinforcement exceeds the specified value should not more
than 2, and the spacing interval of every one of these locations should not exceed
the height of one layer of bricks.
8.2.5 In the reinforcing bars building bricks masonry shear wall, the lap joint length of
the bearing steel bars adopting the lab butts should not be less than 35d, and not
be less than 300mm.
The quantity of spot check: 20% of every kind of constructional parts( wall, pole,
lintel) should be sampled from one batch to be inspected, and the quantity
should not be less than 3 pieces.
The way of inspecting: To measure with the ruler.9 The masonry engineering of the filling in walls
9.0 General regulations
9.0.1 The chapter is suitable for the acceptance of construction quality of the building
construction using the masonry of the filling in walls such as the hollow blocks,
the steam compression concrete building blocks, the lightweight aggregate
concrete small size hollow bricks et.
9.0.2 The product age of the steam compression concrete building blocks and the
lightweight aggregate concrete small size hollow bricks should exceed 28d.
9.0.3 During the process of the transportation and the loading and unloading, the
hollow blocks, the steam compression concrete building blocks and the
lightweight aggregate concrete small size hollow bricks are forbidden to be
thrown and dumped, and should be stacked trimly separately according to the
kind and the specification after approaching, The stack height should not exceed
2m. The steam compression concrete building blocks should be prevented from
the rain
9.0.4 Before building of the masonry of the filling in walls, the bricks should be
watered moist ahead of 2d. When laying the steam compression concrete
building blocks, the masonry plane should be watered properly.
9.0.5 When building the masonry Wall with the steam compression concrete building
blocks and the lightweight aggregate concrete small size hollow bricks, the
common agglomeration bricks, or the cellular bricks, or the common concrete
small size hollow bricks, of the time-casting concrete bank etc. should be used
in the bottom of the wall, and the height should not be less than 200mm,
9.1 The master items
9.1.1 The intensity grade of the bricks, the building blocks and the masonry mortar
should meet the demands of the design.
The way of inspecting: To refer to the product qualification certificate and the
product performance inspection report of the bricks or the building blocks, and
the test report of the mortar test blocks.
9.2. The common items
9.2.1 The stock size allowable deviation of the masoncy of the filling in walls should
observe the regulations in form 9.3.1.
The quantity of spot check:
(1) For the item 1 and 2 in the form, 10% but not less than 3 spots should be
sampled stochastically from the standard rooms batch to be inspected, For the rooms
of big area or the corridors, two axial lines or every extension of 10 meters are
regarded as one standard room, the check spots of every room should not be less
than 3,
(2) For the item 3 and 4 in the form, 10% but not less than 5 spots should be
sampled stochastically from the batch to be inspected.
Form 9.3.1 the stock size allowable deviation of the masonry of the filling in
mwalls
Ttem = Allowable _ | Way of inspection
| number deviation(mm)
| Deviation of the i Tnspecting with the ruler
| axial line
1 <3m 3 Inspecting with the wire pallet
verticality of 2m, or the suspension wire
a i and the ruler
Inspecting with the guiding ruler
2 _| Surface smoothness e of 2m and the wedge-type feeler
Height and width of Inspecting with the ruler
3 the holes of the +5
widows(rear jack)
Deviation of the Inspecting with the altometer or |
A upper and lower aa the suspension wire
windows in the
exterior wall
9.32 The steam compression concrete building blocks and the lightweight
aggregate concrete small size hollow bricks should not be used with other
bricks. Z
‘The quantity of spot check: 20% but not less than 5 places should be sampled
from the batch to be inspected.
‘The way of inspecting: To inspect the external appearance.
9.3.3 The fullness grade of the masonry of the filling in walls and its way of
inspecting should observe the specifications in the form 9.3.3
The quantity of spot check: 3 places should be inspected every shelf at least,
and 3 blocks should be inspected every place at least.
Form 9.3.3 The fullness grade of the masonry of the filling in walls and its way of
inspecting
Kind of the masonry | seam | Fullness grade and its demands | Way of
inspectin,
Masonry of the hollow | Horizon | >80% Inspecting the
bricks Vertical | Filled with the mortar, the| area of the |
transparent seams and the | mortar
hidden seams and the false | bonding trace
seams are not allowed on the back
Masonry of the steam | Horizon | >80% surface of the
compression concrete | Vertical | >g0% bricks
building blocks and the
lightweight aggregate |
concrete small size
hollow bricks
9.3.4 The retained ‘location for the binding steel bars and the net chips on the
masonry of the filling in walls should accord with the number of the block
layer. The binding steel bars and the net chips should be embedded in the
seams. The embedded length should meet the demands of the design. The
vertical deviation should not exceed the height of one layer.
2s935
9.3.6
9.3.7
The quantity of spot check: 20% but not less than 5 places should be
sampled from the batch to be inspected.
The way of inspecting: To observe and measure with the ruler.
The masonry of the filling in walls should be built in the way of the stagger
joints. The joint length of the steam compression concrete building blocks
should not less than 1/3 of the length of the building blocks. The joint length
of the lightweight aggregate concrete small size hollow bricks should not less
than 90mm. The vertical straight joint should not bigger than 2 layers.
The quantity of spot check: 10% of the standard rooms batch to be inspected
but not less than 3 rooms should be sampled.
‘The way of inspecting: To observe and measure with the ruler.
The thickness and width of the masonry of the filling in walls should be
correct. The seams of the masonry made of the hollow bricks and the
lightweight aggregate concrete small size hollow bricks should be 8~12mm.
The horizontal seam thickness and the vertical seam width of the masonry
made of the steam compression concrete building blocks should be 15mm
and 20mm separately.
The quantity of spot check: 20% but not less than 5 places should be sampled
from the batch to be inspected. :
The way of inspecting: To reduce the height measured S layers of the hollow
bricks or the small size bricks and the masonry of 2m with the ruler.
When the part of the masonry of the filling in walls being built close to the
girder and the bottom of the board, a given interstice should be retained
which should be built tightly at least 7d after the masonry of the filling in
walls is finished.
The quantity of spot check: 10% of the filling in walls pieces (the filling in
wall between two poles is regarded as a filling in wall), but not less than 3
pieces, should be sampled from the batch to be inspected.
The way of inspecting: To observe.
2610.0.1
10 Construction in winter
When the outdoor average temperature is steadily below 5°C for Sd
continuously, the masonry engineering should adopt the measures of the
construction in winter.
Note: The temperature should be determined by the local meteorologic data.
10.0.2
10.0.3
10.0.4
10.0.5
10.0.6
10.0.7
10.0.8
@Besides during the term of the construction in winter, if the lowest
temperature of that day is below 0'°C, the regulations in this chapter
should be observed.
Besides the requirements in this chapter, the acceptance of the teleutostage
construction quality of masonry engineering should still observe the
specifications in the previous chapters of this regulation and the
specifications in the national current standards Code for Teleutostage
Construction of Construction Engineering JGJ104.
‘The materials used in the teleutostage construction should meet the
following demands:
1 The lime paste and the calcium carbide paste ete. should be
prevented from freezing. If frozen, they should be meited before
being used. .
2 When mixing the sand used for the mortar, the ice cakes and frozen
blocks whose size exceeds 10mm should not be included.
3. The bricks used for the masonry and other materials should be
prevented from water for the protection of frost.
Besides the demands in the normal atmosphere temperature, The retaining of
the mortar test blocks in the teleurostage construction should meet the
demands of retaining 1 group more of test blocks under the same
maintenance condition as the masonry at least, And the intensity should be
inspected for 28d.
If the frozen soil dose not have the frost heaving nature, the base can be built
on the frozen ground base. If the frozen soil has the frost heaving nature, the
base can be built on the unfrozen ground base, Under construction and before
backfilling earth, the ground base should be prevented from freezing.
If being laid in the temperature over 0°C, the common bricks, the multihole
bricks and the hollow bricks should be watered moist. If building in the
temperature below or equal to 0°C, watering is not necessary, but the
consistency of the mortar should be increased. For the construction with the
shock strength of 9 degrees, if the common bricks, the multihole bricks and
the hollow bricks can’t be watered moist, the laying is forbidden without the
special measurements.
The materials should be filled in by two steps when mix the mortar. The
temperature of the water can not exceed 80 °C while the temperature of the
sand can not exceed 40°C.
The temperature of the using of the mortar should meet the following
specifications:
271 The temperature should be higher than +5°C while using the method of
adding additional cream.
2, The temperature should be higher than +5°C while using the method of
adding chlorine salt.
3. The temperature should be higher than +5°C while using the method of
warming room.
4 The lowest temperature for using the mortar should be 10°C , 15°C and
20°C respectively while using the method of freezing when the extra
ventricular temperature is 0°C~~ -10°C, -11°C—~ -25°C and below -
25°C respectively.
10.0.9 The temperature should not be lower than +5°C for the bricks while being
built when using the method of warming room. The temperature of the
warming house, which is 0.5 meter to the bottom of what have been built,
should not be lower than +5°C.
10.0.1 The conserve time of the masonry in the warming house should be carried
‘out according to the temperature in the house with the specification in form
10.0.11
Form 10.0.1 __ The conserve time of the masonry for warming house method
[Temperature in the [5 10 5 20
warming house(*C)
Conserve time (a) 36 35 24 33
10.0.11 Observation and inspection should be done on masonry in the thawy period
of the construction while using the method of freezing.
10.0.12 The intensity grade of the mortar should be lifted one degree higher than as
in the normal temperature environment when using the method of adding
salty mortar.
10.0.13 The method of adding salty mortar is forbidden for masonry with bars.
2811.The construction inspection and acceptance on the sub-
engineering
11.0.1 The following documents and records should be supplied before acceptance
of the masonry engineering.
1. The technical code for the complement of the construction
2. The qualification cettificate and the product performance report of the
raw materials
3. The notification of the proportion of the concrete and the mortar
4, The testing report of the anti-press grade for concrete and the mortar
piece
5. The recorder of the construction
6. The acceptance records of the master items and the common items for
each testing batch
7 The quality control documents of the construction
8. The technical documents for the disposal of very important problems or
the amendment of the design
9. Any other required documents :
11.0.2 The general comments on the impression quality of the masonry engineering
should be given out while inspecting and accepting the sub-engineering.
11.0.3 When the quality of the masonry engineering can not meet the requitements, is
should be executed accord with the current state standard Unified Code for
acceptance of construction quality of construction engineering GBS0300.
11.0.4 The masonry with cracks should be inspected according to the following
circumstance:
1 For the cracks on the masonry that could effect the safety of the framework,
the experienced inspection unit should authenticate them. For those to be
repaired or reinforced, they should be inspected for a second time when being
used meeting the requirements.
2. For the cracks on the masonsy that will not effect the safety of the
framework, they should be inspected. For those will effect the using
function and the impression quality, they should be disposed.
29Attachment A The quality acceptance recorder of the masonry engineering
inspected batch
0.1 To uniform the forms of the testing records for acceptance of masonry
engineering, the forms from A.0.1-1~form A.0.1-5 are listed for the
checking of the quality.
A.0.2 For the testing records of the quality of masonry engineering with reinforce
steel bars, form A.0.1-1 or form A.0.1-2 should be used except for the form
A.0.1-4,
30Form A.0.1-1 The acceptance records of the quality of masonry engineering testing batch
[Profect name Sub-engineering ‘Accepiance parts
“The Construction unit The project manager
"The code and the serial The professional section
number of the construction chiet |
anit
|The sub construction unit The team lead of the
construction team.
The | The code for the acceptance of the | The assess |The acceptance records from the
mast | quality records from the | supervisor (construction) unit
items construction unit
1. the intensity | The design
grade of the bricks | requirements
MU
2, the intensity | The design
grade of the mortar | requirements
M
3. the obligation of | 5.23
the inclined stubble
4. the joint| $2.4
treatment of the
stubble and steel
bars
5. the _ satiation | 280%
| grade of the mortar
6. the displacement | <10mm
of the axes
7. the vertical | <3mm
degree(each layer)
1. the building way | 5.3.1
2, the thickness of | 5.3.2
the vertical seam
3. the elevation of | Within
the top surface +15mm
the level off of | Dry wall:Smm
‘the surface Wet wall:8mm_
5. the holes of the | Within
doors and windows | + 15mm.
6. excursion of the | 20mm
doors and windows
7. the even and | Dry wall:7mm
steaight degree of | Wet
the vertical seams _| wall:10mm_
8, The t-shape | 20mm
crace seam on
the dry wall
|The assess results given by the | Professional Check of the project: the principal of the quality
construction unit contral:
Yy/mm/dd
The assess results given by the | The engineer of the supervising( the principal of the technical ffom the
supervisor(construction) unit} construction unit
Yyimm/éd
Note: this form is filled in by the professional quality checker of the construction, and accepted by
the engineer of the supervising.
31Form A.0.1-2 The acceptance records of the small size bricks and the mortar testing batch
unit
Project name Sub-engineering ‘Acceptance parts ]
‘The Construction unit “The project manager
The code and the serial The professional section
number of the construction chief
‘The sub construction unit
The tam lead of the
construction team
The
mast
items
The code for the acceptance of the | The assess
quality
records ftom the
construction unit
The acceptance records from the
supervisor (construction) unit
1. the _ intensity
grade of the smal
bricks
The design
requirements
MU.
2. the intensity
grade of the mortar
The design’
requirements
M
3. the obligation of
the inclined stubble
623
4.
3.
6
the satiation
grade ofthe
vertical seams
290%
8. the satiation
grade of the upright
seams
280%
9. the excursion of
the axes
<10mm_
10. the vertical
degree(each layer)