Professional Documents
Culture Documents
Hardware Test
Hardware Test
Objective To verify that the I/O cabinet is built according to the approved drawings.
Tested OK
Tested OK
General cabinet construction Tested OK
Mounting plate Tested OK
DIN Rails Tested OK
Internal mounting assemblies Components layout on: Tested OK
AI Tested OK
DI Tested OK
AO Tested OK
DO Tested OK
Terminals Tested OK
Devices Tested OK
Panel Earth Cable/Terminals Tested OK
Cable wire Tested OK
Circuit breaker rating Tested OK
AC/DC separation Signal Termination Tested OK
Terminals and wiring types Tested OK
§ S7 -1200 PLC, Expansion Modules(AI & DIDO cards) Tested OK
Wire sizes Tested OK
Wire crimping with ferrule/lug Tested OK
Wire duct size and color Cable Handling Tested OK
Routing, entry and terminations Tested OK
System cables Doors Tested OK
The quantity, type and location of the panel components should match the I/O
Expected Results
cabinet drawings.
The verification of the items listed above has been completed and witnessed by:
_______________________ _______________________
Date Signature