Q-202310-32a

PROJECT : Supply and Installation Smoke Control of System


LOCATION : EPZA, Rosario Cavite
CLIENT NAME : KAPCO Manufacturing Corporation
DATE : October 23, 2023
ATTENTION : Ma'am Nilda Montiano - Assistant General Affairs Manager
COST BREAKDOWN
Item No. Description Qty Units MATERIAL COST LABOR COST TOTAL COST TOTAL AMOUNT
I GENERAL REQUIREMENTS
Mobilization / Demobilization 1 lot 20,000.00 20,000.00 20,000.00

Documentation and As-built plan 1 lot 18,750.00 18,750.00 18,750.00

Medical, Safety and Security Requirements 1 lot 12,500.00 12,500.00 12,500.00

II Supply and Install Smoke Extraction Fan

Wall mounted exhaust fan


II.1 Description: Propeller type / Belt Driven 42"Ø, 2 set 65,463.75 19,639.13 85,102.88 170,205.75
50,000 CFM, 1/4" Wg, 5 HP, 220Volts, Phase 3, 60 Hz
Wall mounted exhaust fan
II.2 Description: Propeller type / Belt Driven 36"Ø, 2 set 25,000.00 7,500.00 32,500.00 65,000.00
1,000 CFM, 1/8" Wg, 1 HP, 220Volts, Phase 3, 60 Hz
Wall mounted exhaust fan
II.4 Description: Propeller type / Belt Driven 36"Ø, 1 set 18,750.00 5,625.00 24,375.00 24,375.00
500 CFM, 1/8" Wg, 1 HP, 220Volts, Phase 3, 60 Hz
III Fire Fighters Smoke Control Panel (FFSCP) -
Wiring and Roughing-ins of SMEF to FFSSCP 1 lot 151,250.00 45,375.00 196,625.00 196,625.00
Fire Fighters Smoke Control Panel (FFSCP) 1 lot 125,000.00 37,500.00 162,500.00 162,500.00
IV OTHERS
Miscelanous and Consumables 1 lot 68,750.00 20,625.00 89,375.00 89,375.00

GRAND TOTAL - Php (VAT Exempt) 759,330.75


TERMS AND CONDITIONS

1. PAYMENT: 60% Downpayment and 40% progress billing.


2. VALIDITY: This offer is valid for 15 days from date of quotation.
3. NOTES:
a. Exclusion: Any Scope of works / Materials not mentioned in the above BOQ.
b. Conditions: Any Additional works or revision on the agreed design and specification will be charged as variation.
c. Warranty: All works are guaranteed againts workmanship defects one year commissioning after receipt of down payment whichever comes first.
d. Bond, insurances and permits are not included.
e. All utilities such as water and power supplies, etc. to be used in the construction shall be provided by the Owner.

We appreciate your interest. If you need further clarification, please feel free to call us.

Thank you and best regards,


GOZOIKOS CONSTRUCTION INC.

ENGR. GEDEON O. ZONIO, PME


GENERAL MANAGER