Professional Documents
Culture Documents
1019 - From Portal
1019 - From Portal
CIRCULATED PHASE-2 REVIEW DOCUMENT (GENERATED) BY SINAM HUDSON SINGH ON 19-01-2022 13:17:40
Review Analysis:
5.1) Status of standard(s), if any from which assistance had been drawn in the formulation of this IS.
1. Standard 2. Standard 3. Whether the standard has since been 4. Major 5. Action
(No.) (Title) revised changes proposed
1. 2. Referred 3. Since 4. Changes in the referred Standards since last review 5. 6. Action
Referred standards revised of standard Changes proposed
standards (Title) standard in the
(No.) number of the referred
corresponding standard
standard which
are
affecting
the
standard
under
review
IS 1003 Specification IS 1003 (Part ) Requirements that arc to met by door shutters. when
(Part 1): for timber 1): 2003 tested as per relevant parts of IS 4020 (Parts I to 16) : 1998
1966 panelled •Door shutters--Methods of tests (third revision)' have
and glazed been specified. b) 'Spot test' for determination of
shutters: penetration and identification of preservatives used for
Part 1 Door treatment oftimber has been included. c) Other
shutters modifications based on the prevailing practices in the
country have been made
https://www.services.bis.gov.in:8071/php/BIS_2.0/Reaffirmation/ProcessAction.php?ID=OTY2 1/4
1/19/22, 2:21 PM Admin | Dashboard
IS Specification IS 4992:1975
4992:1968 for door
handles for
mortice
locks
(vertical
type)
IS Specification IS 742:1981
742:1966 for zinc base
alloy die
castings
IS Specification WITHDRAWN
1385:1968 for phosphor
bronze rods
and bards,
sheet and
strip and
wire
IS Specification IS 410:1977
410:1967 for rolled
brass plate,
sheet, strip
and foil
IS Specification IS 292:1983
292:1961 for brass
ingots and
castings
https://www.services.bis.gov.in:8071/php/BIS_2.0/Reaffirmation/ProcessAction.php?ID=OTY2 2/4
1/19/22, 2:21 PM Admin | Dashboard
5.3) Any other standards available related to the subject & scope of the standard being reviewed (International/regional/other
national/association/consortia, etc or of new or revision of existing Indian Standard).
1. 2. 3. Relevant clause of the IS under review that is likely to be impacted (Clause & 4. Action
Source Development IS No.) proposed
5.6) Issues arising out of changes in any related IS or due to formulation of new Indian Standard.
1. Related IS 2. 3. Provision in the IS under review that would be 4. Changes that may be 5. Action
(revised or Related impacted & the clause no. or addition of new necessary in the Standards proposed
new) IS Title clause/provision under review
https://www.services.bis.gov.in:8071/php/BIS_2.0/Reaffirmation/ProcessAction.php?ID=OTY2 3/4
1/19/22, 2:21 PM Admin | Dashboard
ACTION
ACTION LOG
SINAM HUDSON
SINGH
(Employee)
COMMUNICATION
Copyright ©2020. All rights reserved. Designed & Developed by ITSD, BIS
https://www.services.bis.gov.in:8071/php/BIS_2.0/Reaffirmation/ProcessAction.php?ID=OTY2 4/4