This document outlines a construction project schedule that includes 7 tasks over 14 days. It details the purchasing of materials from February 1-10, off-site fabrication from March 7-11, on-site fabrication from March 14-16, and installation and setup from March 15-18. Mobilization and demobilization is scheduled for March 14-15.
Original Description:
Original Title
- GUANZON MASINLOC- GANTT CHART FOR INDOOR-OUTDOOR SIGNAGE
This document outlines a construction project schedule that includes 7 tasks over 14 days. It details the purchasing of materials from February 1-10, off-site fabrication from March 7-11, on-site fabrication from March 14-16, and installation and setup from March 15-18. Mobilization and demobilization is scheduled for March 14-15.
This document outlines a construction project schedule that includes 7 tasks over 14 days. It details the purchasing of materials from February 1-10, off-site fabrication from March 7-11, on-site fabrication from March 14-16, and installation and setup from March 15-18. Mobilization and demobilization is scheduled for March 14-15.
Third Ace Construction ID WORK DESCRIPTION Duration Start 27Finish Feb '22 06 Mar '22 13 Mar '22 T W T F S S M T W T F S S M T W T F S 1 2 GENERAL REQUIREMENTS 14 days? Tue 01/03/22 Fri 18/03/22 3 Purchasing of Materials 8 days? Tue 01/03/22 Thu 10/03/22 4 Off- Site Fabrication 5 days? Mon 07/03/22 Fri 11/03/22 5 On-Site Fabrication 3 days? Mon 14/03/22 Wed 16/03/22 6 Mobilization and Demobilization 2 days? Mon 14/03/22 Tue 15/03/22 7 Installation and Setup 4 days Tue 15/03/22 Fri 18/03/22