WOS09

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

WELL OPERATIONS STANDARDS MANUAL Ref: WOS 09

Issue: October 2000


PART 2 - WELL OPERATIONS STANDARDS
Page: 1 of 1

9 DRILLING CONTRACTOR MANAGEMENT (WOS 09)

9.1 General
9.1.1 The Drilling Agreement between Lasmo and the Drilling Contractor shall be administered by
the Lasmo Well Operations Manager or his approved designee.

9.1.2 The Lasmo Well Operations Manager, or his appointed designee, shall manage day-to-day
business with the designated representative of the Drilling Contractor.

9.1.3 The detailed work programme shall be agreed in writing between the Lasmo Well
Operations Supervisor and the Drilling Contractor’s senior on-site representative.

9.1.4 A copy of all instructions issued shall be maintained on file and be available for inspection
by the Lasmo Well Operations Manager.

You might also like