SQP NO : ADANI/SQP/M/177
ITEM :Fabrication of STRUCTURE INCLUDING STRINGERS , SHOT POSTS , PULLEY FRAMES ,DRIVE BASEFRAMES ,
REV : R1
adani DECKPLATES, RAIN PROTECTION COVER, TAKE UP STRUCTURES ,BELT GUARDS, GENERAL ACCESS ,GALLERY
STRUCTURES, GRATING WALKWAYS, SUPPORTS HAND RAILS, CHUTES, SKIRTS , HOPPERS, COLUMN, BEAM, SILO
SHELL MISCELLANEOUS STRUCTURES etc.
DATE :11/01/2023
Approved By QA
1.5 Internal Flaw (For PL THK 16mm & above ) MA Ultrasonic Test 100% 100% 100% ASTM A 578 ASTM A 578 LeveB UT REPORT √ P H H
Internal Flaw (For Round Ø 50 mm & ASME SEC VIII Div II /Aproved MTC/Lab test
1.8 MA Ultrasonic Test 100% 100% 100% ASTM A 388 -2011 √ P H H
above) procedure report
Appd.Drg / Technical MTC/Lab test
1.90 Liner Plate for Gate, hopper and chute Chem Properties MA Chem Properties 1/Heat/Size 1/Heat/Size 100% Appd.Drg / Technical Specification √ P V V
Specification report
Mech properties and Mech Properties & 1/Heat/Size 1/Heat/Size Appd.Drg / Technical MTC/Lab test
1.10 MA 100% Appd.Drg / Technical Specification √ P V V
Hardness Hardness At Random At Random Specification report
Review of batch test KIOMPL/QA/Welding/01 (Latest KIOMPL/QA/Welding/01 (Latest batch test Only KIOMPL Appd. Welding
1.4 Welding Consumable Chemical & Mechanical properties MA 1 / Lot / Size 1 / Lot / Size 1 / Lot / Size √ P V V
certificate Revision) Revision) certificate consumable to be Used.
weld visual, Reinforcement, Fillet size , In Vendor Procedure / AWS D1.1 Table.1 / Client approved fabrication to be checked at the time of final
2.4 Welding MA Visual / Measurement 100% 100% 100% IR √ P H H
process NDT etc specification inspection.
STANDARD QUALITY PLAN ( SQP)
SQP NO : ADANI/SQP/M/177
ITEM :Fabrication of STRUCTURE INCLUDING STRINGERS , SHOT POSTS , PULLEY FRAMES ,DRIVE BASEFRAMES ,
REV : R1
adani DECKPLATES, RAIN PROTECTION COVER, TAKE UP STRUCTURES ,BELT GUARDS, GENERAL ACCESS ,GALLERY
STRUCTURES, GRATING WALKWAYS, SUPPORTS HAND RAILS, CHUTES, SKIRTS , HOPPERS, COLUMN, BEAM, SILO
SHELL MISCELLANEOUS STRUCTURES etc.
DATE :11/01/2023
Approved By QA
PLATE THICK ABOVE Vendor's Fab Drawing / Client Vendor's Fab Drawing / Client Approved
2.7 PRE HEATING MA Measurement 100% 100% 100% IR √ P H V
20MM Approved GA GA
PWHT (STRESS PLATE THICK Vendor's Fab Drawing / Client Vendor's Fab Drawing / Client Approved
2.8 MA Measurment 100% 100% 100% IR √ P H V Heat Chart review
RELIEVING) 30 mm & above Approved GA/procedure GA/procedure
ROOT GAP, OVERLAP Vendor's Fab Drawing / Client Vendor's Fab Drawing / Client Approved
2.10 Butt Joint Fit Up MA Measurment 100% 100% 100% IR √ P H H
& STRAIGHTNESS Approved GA/procedure GA/procedure
Visual
3.2 Weld Quality / Size MA 100% 100% 100% AWS D1.1 Div 1 . Table1 /Appd drg/ Appd procedure I √ P H H
testing/Measurment
STANDARD QUALITY PLAN ( SQP)
SQP NO : ADANI/SQP/M/177
ITEM :Fabrication of STRUCTURE INCLUDING STRINGERS , SHOT POSTS , PULLEY FRAMES ,DRIVE BASEFRAMES ,
REV : R1
adani DECKPLATES, RAIN PROTECTION COVER, TAKE UP STRUCTURES ,BELT GUARDS, GENERAL ACCESS ,GALLERY
STRUCTURES, GRATING WALKWAYS, SUPPORTS HAND RAILS, CHUTES, SKIRTS , HOPPERS, COLUMN, BEAM, SILO
SHELL MISCELLANEOUS STRUCTURES etc.
DATE :11/01/2023
Approved By QA
SURFACE PREPARATION PAINTING & Vendor's Fab Drawing / Client Vendor's Fab Drawing / Client Approved
4.0 Finishing & Correctness &Match Marking MA Visual / Measurement 100% 100% 100% IR √ P H RW
MATCH MARKING Approved GA GA
Note: -
1. Wherever Raw material traceability is not available , check testing is to be carried out at NABL accredited laboratory.
2. If not specified in drawing, minimum fillet size is to be 6mm.
3. If not specified in drawing Single V groove joint to be considered upto 28mm. For size 28mm and above double V joint preparation is to be considered.
4. NO holes to foul at fasteners / weld bead.
5. Match marking is mendatory wherever assebly is to be done at site.
5. At matching flange / other faces skim machining cut is mendatory, respective components thickness must be consider for skim machining cut .
7. Rust preventive is must prior to dispatch on machining surfaces and fasteners.
8. Stress releaving is to be done in closed furnace and charts are to be submitted for client review and records.
9. No mitre joints are allowed. For hand rais and grating bend are to be pre fabricated / Pipe fittings.
10. Machining is to be done in single setting and all the relevant inspections to be done
11. Vendor To ensure that Corrosion protection specification as relavent is given to manufacturer prior to commencement of manufacturing.
12. Drive base frames are to be stress relieved mendatorily as per client approved procedure.
13. Latest edition reference and acceptance standars shall be refered and followed .
14. Vendor to submit all NDT procedures for client review and approval
15. Welding consumables and Paint are to be of approved make only. Batch test certificates for these consumables are to be submited at the time of final inspection.
16. Unless specified all fasteners are to be hot dip galvanized with HDG thickness of 60 to 80 microns .
17. All tests shall be carried out as per BIS or equivalent international standards as per Concession Agreement.
LEGEND:- D* Records identified with tick (p) shall be essentially included by supplier & manufacturer in Quality Documentation package.
** M: Manufacturer / Sub-Supplier, C: Main Supplier, A: Client or their authorized representative.
Use the following term as appropriate in columns 10. , MA- Major, P: Perform, V: verification, RW: Random Witness and H: Customer Hold Point to be witnessed and work shall not proceeded till it is witnessed and cleared in writing.