Alexandria University

Faculty of Engineering
Specialized Scientific Programs (SSP)
Project 1 (CAE504)
Fall 2023

You should select one of the listed FIDIC and smart construction items, then do two separate
reports as follows:

Report (CONDITIONS OF CONTRACT FOR CONSTRUCTION (FIDIC)) Specifications:


▪ Cover page (University logo, Report Title, Your Name and ID, Supervisor Name, Group No.)
▪ List of contents
▪ List of figures
▪ List of tables
▪ Body of the report (at least):
1. Clause summary
2. Responsibilities of parties
3. Case study (Example)
▪ Check of plagiarism (not exceed 25%)
▪ References

General Specifications:
▪ Font and spacing according to the following:
Font type ➔ Times New Roman
Report title ➔ Font 18, Bold.
Main Headings ➔ Font 16, Bold
Subheadings ➔ Font 14, Bold
Normal paragraphs ➔ Font 12, Single line spacing

Submission Date:

Date of submission: Saturday , December 20, 2023

Prof. Sherif Mohamed Hafez


Page 1 of 3
Construction Engineering and management staff
Alexandria University
Faculty of Engineering
Specialized Scientific Programs (SSP)
Project 1 (CAE504)
Fall 2023

NO. FIDIC Clause


1 Notices and Other Communications
2 Priority of Documents
3 Contract Agreement
4 Delayed Drawings or Instructions
5 Employer’s Use of Contractor’s Documents
6 Contractor’s Use of Employer’s Documents
7 Compliance with Laws
8 Joint and Several Liability
9 Limitation of Liability
10 Right of Access to the Site
11 Employer’s Financial Arrangements
12 Site Data and Items of Reference
Employer-Supplied Materials and Employer’s
13
Equipment
14 Engineer’s Duties and Authority
15 The Engineer’s Representative
16 Delegation by the Engineer
17 Engineer’s Instructions
18 Replacement of the Engineer
19 Contractor’s General Obligations
20 Contractor’s Representative
21 Contractor’s Documents
22 Contractor’s Health and Safety Obligations
Contractor’s Unforeseeable Physical
23
Conditions
24 Contractor’s Equipment
25 Contractor’s Operations on Site
26 Security of the Site
27 Subcontractors and Nominated Subcontractors
28 Labour Laws
29 Health and Safety of Personnel
30 Manner of Execution
31 Testing by the Contractor
32 Defects and Rejection
33 Extension of Time for Completion
Prof. Sherif Mohamed Hafez
Page 2 of 3
Construction Engineering and management staff
Alexandria University
Faculty of Engineering
Specialized Scientific Programs (SSP)
Project 1 (CAE504)
Fall 2023

34 Delays Caused by Authorities


35 Delay Damages
36 Consequences of Employer’s Suspension
Payment for Plant and Materials after
37
Employer’s Suspension
38 Cost of Remedying Defects
39 Remedying of Defective Work off Site
40 Further Tests after Remedying Defects
41 Right of Access after Taking Over
42 Performance Certificate
43 Works to be Measured
44 Method of Measurement
Value Engineering in variation and
45
adjustments
46 Variation Procedure
47 Adjustments for Changes in Laws
48 Adjustments for Changes in Cost
49 Payment and Advance Payment
50 Schedule of Payments
51 Delayed Payment
52 Release of Retention Money
53 Currencies of Payment
54 Notice to Correct
55 Termination for Contractor’s Default
Valuation after Termination for Contractor’s
56
Default
57 Responsibility for Care of the Works
Exceptional Events and Notice of an
58
Exceptional Event
59 Insurance to be provided by the Contractor
60 Claims For Payment and/or EOT
61 Avoidance of Disputes
62 Arbitration

Prof. Sherif Mohamed Hafez


Page 3 of 3
Construction Engineering and management staff