REQUIREMENTS AND SOLUTIONS FOR DYNAMIC VOLTAGE RESTORER A CASE STUDY

P. Dhler, R. Affolter, O. Apeldoorn


ABB Industrie AG 5300 Turgi, Switzerland

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

CONTENTS
INTRODUCTION MARKET REQUIRMENTS OF THE DVR OPERATING PRINCIPLE OF A DVR SAG COMPENSATION CAPABILITY RELIABILITY AND AVAILABILITY LOSSES CONTROL AND PROTECTION HARMONICS MONITORING CONCLUSION

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Introduction
ABB Industrie AG, Switzerland Power Electronics Systems

Turgi

www.abb.com/powerelectronics ABB Automation


ABB Industrie AG, Schweiz IEEE PES 2000

Market requirements
Market requirements determine: Sag & Swell compensation capability Reliability and Availability Losses Control and Protection Harmonics Monitoring

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Operating Principle
Booster Transformer Distrib. Bus Load

Converter

Energy Storage

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Operating Principle
Standby
IL xt VB xt xt xm VL VB xt

Boost
IL

xm VL

Converter

VG = 0

Converter

|V | > 0 G

shorted CT !

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Topology
Q3 VG
Distribution Bus

IB= IG

Q1 T1

Filter

Q2

Load Bus

TL

Control VL

DVR
ABB Automation
ABB Industrie AG, Schweiz

Charger

IEEE PES 2000

Topology
Short circuit operation (SCO-Mode)

No switching during SCO - Mode No switching losses No harmonics

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Topology

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Compensation Requirements
0.65

0.55 Voltage sag [%] 0.45

0.35

0.25 0 100 200 300 400 500

ms ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Compensation Capability
0.65
0.65

0.55
0.7

ABB

Voltage sag [%] 0.45

others
max. three phase sag capability

0.35
0.35

0.3
0

100

200

300

400

100

200

300

400

ms ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Reliability Availability
An Availability of > 98,5% can be achieved This is reached by
4 Simple Design 4 Low number of Parts 4 Implementation of the robust IGCT 4 Overcurrent capability

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Reliability Availability
4 MVA load In operation since 1.5 years no IGCT failure (~200FIT) thyristor technology is at 100 FIT
ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Losses
Definition at SCO-Mode (Standby) Transformer losses (measured) Converter (calculated) Energy storage (calculated) Auxiliaries (measured) Goal
ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

= 98,5%

Losses
Feature
device on-state loss device turn-off loss device turn-on loss gate drive power short-circuit current dv/dt snubber di/dt snubber switch chip diode chip chip mount

IGBT

GTO

IGCT
50 % 100 % 5% 50 % external (choke) no yes monolithic monolithic pressure

100 % 70 % 100 % 100 % 100 % 30 % 1% 100 % self limited (= f(t)) external (choke) no yes no yes discrete monolithic discrete monolithic solder pressure

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Control and Protection


Vin
A,B,C

a, Transformation, eliminate zero sequence b Park Transformation s


freeze

a,b

e jw t

a,b

d,q

dqin dqfilt

Low pass filter

PLL

dqout
Fault Trigger

Voltage recovery < 1 ms to 100%

VDC

DC Voltage compensation, state of charge Reproduce phasors Create 3-phase signals Pulse Width Modulator PWM Generate boost voltage
IEEE PES 2000

e jw t

d,q
a,b

a,b
A,B,C

Pulse Logic Vbus

ABB Automation
ABB Industrie AG, Schweiz

Harmonics
Q3 VG
Distribution Bus

IB= IG

Q1 T1

Filter

Q2

Load Bus

TL

Control VL

DVR

Charger

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Harmonics
Spectrum of DVR Output Voltage
0,6

No harmonics during SCO - Mode

0,4

UGN [%]
0,2

0 1 Ust 0,5 0 0 40 80 120 160 200

Order n of harmonics ABB Automation


ABB Industrie AG, Schweiz IEEE PES 2000

Monitoring
automatic data acquisition and logging remote online access remote data transfer PC-based interface RS232 or RS485 remote diagnostics and software changes

ABB Automation
ABB Industrie AG, Schweiz IEEE PES 2000

Design Parameters
Load & Power Factor which has to be protected Voltage to be connected Maximum single phase sag [%] or Maximum three phase sag [%] Length of Sag [ms] to protect Area to be protected Recovery time for DC Link Voltage to 100% Overcurrent capability without going in bypass