Where are the signals list of signals and lams Piping to verify the line number and provide

Please add the supply for the local activation on this panel.
details like cable tag the counter flange/end connection as
& local/Remote DBR to provide the tag shown in detail "A".
number, source, AC/ selection ? numbers to all these
DC supply
PN-5425001
MODULE M-01 items.
P78 - CO2 SNUFFING SYSTEM CONTROL PANEL
1) Vendor to provide the details of items like A13, A06, A03 etc
XSH-5425980 YS-5425980 2) As per the Technical specification the Manual selector switch is required
XSH-5425981 YS-5425981 to set the Co2 battery as Main. Vendor to check.
3) Vendor to indicate the Set pressure of all Safety valves. Vendor to indicate the
YS-5425982B
XYH-1350518
YS-5425982A
alarm values, set values of all Instruments.
XYH-1350521
YS-5425991
YS-5425992 4) How the Automatic actuation occurs? Thermal detection instruments are
USM-5425990 mentioned on this document ? Vendor to check.
When common fault 5) How the system locally operated. Push buttons are not shown ?
DETAIL "A"

NOT USED. will be activating ? 6) Vendor to provide the details of signals and when they are activating?
Make it Spare
JBIF-1411-980 Also the types like NO/NC, Normally Energized / De-Energized, 24VDC etc.
Inhibit of the Automatic ZSL-5425980 7) All components of the system shall be suitable for operating in a marine
Activation signals environment. Vendor to check.
mentioned on Cause & 8) Area classification: Hazardous Area (Zone 2, Gr. IIA, T3). Vendor to check
Effect, Does it really
required?
DETAIL "C" DETAIL "B"
INJECTION NOZZLE: CN-5425504A/B INJECTION NOZZLE: CN-5425002A/B & CN-5425004A/B

PG-5425980

PSV-5425980
Piping to provide the PIT-5425980
No. Qty UOM Descriptions
A
1 5 PC
CO2 SNUFFING SYSTEM
Air / Shore Connection, 3/4" BSPT
counter connection
2 16 PC CO2 Cylinder, 45kg, w/ Pressure Operated Valve
3
4
5
6
8
3
5
16
PC
LOT
PC
PC
End Plug, F/CO2 Pressure Operated Valve
Cylinder Fastening (4 Cabinets)
CO2 Pressure Gauge, 1/2" NPT Male
Discharge Hose, type 10/330mm
details
7 5 SET CO2 Manifold, Carbon Steel
8 5 PC Pressure Relief Valve
9 5 PC Pressure Transmitter, EX Proof, Suitable for Zone 2, IIA, T3 installation
10 10 PC Block & Bleed Valve, SS316, 1/2" NPT
11 8 PC 2 Way Solenoid Valve, Normally Closed, EX Proof, Suitable for Zone 2, IIA, T3 installation
12 5 PC Bleeder
13 16 PC Manifold Check Valve 3/4" BSP T
14 8 PC Connection Hose
15 6 PC CO2 INJECTION NOZZLE, FLANGE CONNECTION
16 8 PC Connection Hose
17 5 PC Ball Valve, 1", Carbon Steel
18 5 PC Limit Switch, EX Proof, Suitable for Zone 2, IIA, T3 installation
Check Valve, 1", Carbon Steel
XY-5425980B
19 8 PC
XY-5425980A
B ELECTRICAL PANELS
CO2 Control Panel, SS316, with Main / Standby Battery Selection Switches;
After Solenoid valve
1 1 PC
2
C
3 PC
EX Proof, Suitable for Zone 2, IIA, T3 installation
Junction Box, SS316 , EX Proof, Suitable for Zone 2, IIA, T3 installation
CYLINDER CABINET
activated by Electrical
CO2 Cylinder Cabinet for CO2 Cylinders , C.S Material Structure, Offshore Painting;

D
1
1 3

1
SET

PC
Screen Type Door (See Through), c/w Ventilation Louver

SPECIAL TOOLS
Manual Handle for Cylinder Top Valve
signal, how the Co2
2 1 PC Weighing Device for CO2 Cylinder

E
1 3 PC
INSTRUCTION SIGN
Sign CO2 Cylinder Cabinet
from the Batteries feed
2 3 LOT Sign Operation Instruction
3 3 LOT Sign Equipment
to the Pipe ?

Piping to verify the line number and provide


the counter flange/end connection as
Piping to verify the line number and provide shown in detail "A".

VENT POST
the counter flange/end connection as
shown in detail "A". INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED
OUTSIDE OF THEIR PURPOSE
FORM OWNED TO PETROBRAS N-381 REV.L

Keppel Shipyard / Bras FELS


ZSL-5425981A
ZSL-5425982A
JBIF-1411-981 JBIF-1411-982
ZSL-5425982B
Designer: Hansin Solutions Pte Ltd.
ZSL-5425981B

SRGE
PG-5425982A PG-5425982B

PIT-5425982A PIT-5425982B
PSV-5425981B
PSV-5425982A PSV-5425982B
PIT-5425981B CLIENT:
PG-5425981B E&P
JOB:
PSV-5425981A BUZIOS FIELD AREA DEVELOPMENT
PIT-5425981A AREA:

PG-5425981A PETROBRAS 78 (P-78)


TITLE:
To be check with DBR
Piping & Instrumentation Diagram (P&ID)
XY-5425981A XY-5425982A-2 XY-5425982B-1
XY-5425981B DESIGN EXEC. CHECK.
XY-5425982A-1 XY-5425982B-2
APPROV.
Does Main/Standby DATE SCALE SHEET of
battery selection from The CO2 cylinders are
the CSS ? to contain 45 kg of (I) SCP78
No.
A-3 carbon dioxide at a I-DE-3010.2G-5425-944-HG4-001
297 mm x 420 mm
pressure of 5900
kPa gauge at 21ºC.
Vendor to check