1ZSC029349D0080en Instruction
1ZSC029349D0080en Instruction
2 Instruction 7
2.1 Replacing contact pin on test tap ................................................................................................................................................ 7
2.2 Verifying the replacement ............................................................................................................................................................ 10
Replacement instruction 3
1ZSC029349D0080 EN, 2022-05-25
4 Replacement instruction
1ZSC029349D0080 EN, 2022-05-25
1 Safety
The following describes the symbols that appear in the manual, along with their meaning.
DANGER!
The yellow, filled warning triangle warns that an accident will occur if the instructions are not
complied with and that it will result in serious personal injury or death and/or major damage to the
product.
It is used, for example, to warn of such dangers as: contact with high voltage, explosion or fire
risk, risk for toxic gases, risk of crushing, impacts, falls from high places, etc.
CAUTION!
The round warning symbol warns that an accident could occur if the instructions are not observed,
and that this could result in personal injury and/or damage to the product.
It is also used to warn of risks that entail burns, eye or skin injuries, impaired hearing, crushing or
slipping injuries, tripping, impacts, falls from high places, etc.
In addition, it is used to warn of functional requirements when assembling or removing equipment
where there is a risk of damage to the product or downtime.
NOTE!
The comment symbol identifies important information and conditions. Also used to indicate any
danger that could lead to property damage.
Torque
The torque symbol indicates tightening torque.
Replacement instruction 5
1ZSC029349D0080 EN, 2022-05-25
1.2 Hazardous working situations
Hazard Action
Working close to high voltage. Disconnect all plant power. Ground all objects at the workplace.
If work must be done close to live plant components, make sure that
the safety distance is in compliance with the applicable safety
regulations.
Working on ladders and platforms. Work must be done in accordance with the applicable safety
regulations.
Do not use ladders or platforms in poor weather conditions.
Working with heavy objects. Do not walk under lifted objects.
Make sure that heavy objects are stable before starting work.
Precaution Action
Waste and cleaning up Clean up liquid waste with an adsorbent. Treat waste as hazardous
to the environment.
Fire Extinguish fires with powder, foam or carbon dioxide.
6 Replacement instruction
1ZSC029349D0080 EN, 2022-05-25
2 Instruction
General
Replacing the contact pin can be done on a bushing directly from the transport box, or on a bushing already
installed.
Please refer to the Installation and Maintenance guide 1ZSC00563-AAD for information on how to handle
the bushing e.g. lift of the bushing, disposal and environmental information.
G007958
Safety
DANGER!
Risk of electrocution!
Make sure that the transformer is de-energized and out of service before any work is performed on
the bushing .
DANGER!
Follow local regulations at all times!
NOTE!
It is recommended that the work is performed by qualified personnel.
Replacement instruction 7
1ZSC029349D0080 EN, 2022-05-25
Required equipment
Tool Note
Caliper -
Instrument to measure Capacitance and TanD -
Torque wrench 5 Nm
Socket 14mm 1/4" square drive
Thread-locking fluid, Grade 42 High strength thread locking fluid, permanent locking
Replacement kit Including 2 size contact pin and spare sealing for test
tap cover
Special socket for tightening the pin -
Lifting device If the bushing is in the transport box
Skylift If the bushing is installed on the transformer
High pressure air -
NOTE!
If not specifically stated, none of the tools are provided by Hitachi Energy.
Procedure
8 Replacement instruction
1ZSC029349D0080 EN, 2022-05-25
3. Unthread the contact pin counter clockwise using
the special socket (3).
NOTE!
The contact pin is glued to test tap
bushing.
NOTE!
Do not use the removed contact pin as
replacement.
NOTE!
G007961
Make sure the special socket is
mounted the correct way.
4. Use high pressure air to clear the threads from old excessive locking liquide.
NOTE!
If the distance is approximately 8.5 mm
use the shorter pin and if the distance
is 10.5 mm use the longer contact pin
for the replacement.
G007963
2 Apply Loctite
Replacement instruction 9
1ZSC029349D0080 EN, 2022-05-25
7. Thread the new contact pin using the special
socket (3) with 5 Nm.
NOTE!
Make sure the special socket is
mounted the correct way.
G007964
8. Measure the distance A.
NOTE!
The measure should be 28,8 +/- 0,2
mm, otherwise contact Hitachi for
further evaluation.
G007968
End of instruction
10 Replacement instruction
1ZSC029349D0080 EN, 2022-05-25
2.2 Verifying the replacement
The verification of the test tap replacement is done with measurement of capacitance and dissipation factor
over C1 and/or C2 please refer to section Measurement of capacitance and dissipation factor in the
installation guide 1zsc000563-AAD.
For bushings not installed on a transformer the measurements can be verified against nameplate, for bushings
already installed on a transformer the measurements should be compared to values recorded during
commissioning.
This can be done directly during replacement or during transformer test.
NOTE!
The transport container must be removed before measuringthe capitance and dissipation factor
(tan 8)
NOTE!
The bushing needs to be lifted out of the transport box. See installation and maintenance guide
1ZSC00563-AAD.
Replacement instruction 11
1ZSC029349D0080 EN, 2022-05-25
Hitachi Energy Sweden AB
Components
SE-771 80 Ludvika
Sweden
www.hitachienergy.com/contact-us
E-mail: contact-us@hitachienergy.com
www.hitachienergy.com/offering/product-and-system/transformer-insulation-and-components