CALCULATION of FAR
23
28
* Occupancy Type = A-2
22 21 * Total Land area = 1063.94 sqm.
29 * Deducted Land Area = at North Side 5.03X2.28=11.47
= at East Side (20.5+2.6+18.89)X1.37=57.53 sqm
30
* Net Land Area = 994.94 sqm
* Required Road Width = 9.14 m & 3.66 m
19 20 * Existing Road width = Front 5.64m, Side 0.86m , 1.57m & 1.70m
* Basic FAR = 5.00
Parking 647.53
Basement floor Stair = 7.34
Driver's Waiting 8.27 683.12
4.57m WIDE ROAD P.P Semi Store = 6.23
Lift Pit 13.75
Cover Drain Semi Pucca
4.15m W
Semi Semi
P.P Pucca Bldg.
4 Std. Pucca P.P Lift, Stair & Lobby =48.61 Guard room 4.00
Semi 2 Std. 6 Std. Bldg. Ground floor 689.13
Semi Electrical Room
W
Pucca Bldg.
Pucca Bldg.
P.P Semi Community = 156.46 Front/North Verandah 3.16
7 Std. Pucca Apartment = 285.76
AD
3 Std. Bldg.
Pucca Bldg. Apartment = 435.53
Bldg. 6 Std.
GA
Semi 3 Std. Lift= 13.66 East Road/Front Ver 13.29
S
DCC DUSTBIN
5 Std. Pucca Bldg. Bldg. Stair= 11.80
Semi 6 Std. Semi Semi 540.53 GA
120m Far From Site
U/C
DC
Bldg.
S
P.P Side Ver (West) 2.04
C
2nd floor Corridor & Lobby= 45.63
Pucca Bldg. Pucca Pucca
P.P GA DC
>>>
EL
Fire Stair
S C
4 Std. 13.66
P.P P.P
Cover Drain
P.P Bldg. 4.92 D
A ± 0.0m
DC EL
4.27
Bldg.
W I D A D >>
GAS
P.P P.P Bldg. Pucca 12 Std. DC
Stair= 11.80 C
4 Std. 3rd floor 540.53 EL PP
5 Std. 4 Std. Bldg. Side Ver (West) 2.04
m
9.14 E R O
GA
IDE
0m I
C
Mosque P.P
Bldg.
IDE R
OAD P.P Semi O S W ARE ROAD
EL
FFE E
Apartment = 435.53
EL
Semi P
3.35
Bldg. CTE N
G
<<< STIN
OPEN P.P
m
4.27m
XI
540.53 GAS DC
C
Pucca T FOR Side Ver (West) 2.04
R Bldg. Corridor & Lobby= 45.63
5.03X2.28m LAND TO BE LEF
4.27m
E
C
DC
Garbage
4.57
IDE
6 Std. Collection
WIDE R
4M 5. P.P Semi
C
mW
C
ROA
DC
U/C
9.1 Bldg. Bldg. GAS
Pucca
EL
Pucca
D TP
G A R A G E
DCC
4.92
W A S A SE
Front/North Verandah
Garbage GUARD
5 Std.
IDE
22.8
WIDE
Collection GAS
OPO
P.P 6 Std. Apartment = 435.53
Semi
DC
4 Std.
20.2
C
Bldg. 9 Std
EL
4 Std.
PR Lift= 13.66 East Road/Front Ver 13.29
Bldg.
ROA
OAD
5m
DC
C
Recharge pit for Bldg. P.P 5th floor Stair= 11.80 GA +0.75m
in Semi 540.53
r Dra
S
400 KW Rain water Bldg. Side Ver (West) 2.04
AY
Corridor & Lobby= 45.63
S L U M A R E A
5.03X2.28m LAND TO BE LEFT FOR
D
1.37m ROAD
D Cove Proposed Electric Connection Pucca
ROAD
2.28m
EW
3.6
A 3.71m
EL
14,000 Gallon
U/C O
E R P.P 2 Std. Proposed Water Connection 1
LP
Fire Stair 13.66
DC
C
DAP PROPOSED 9.14M ROAD WIDEN
RIV
6m
P.P
WID
22.
5 Std. 2 Std. 6 Std.
ED
m
85m
WID
4.92
AD 4.57
20.50m
WID
EL
E 3 Std.
20.2
P.P respect to road =+0.3m
.
ID Mosque
ER
3 .6 5 m
P.P
m
Bldg.
6m.
OA
4.25
Bldg. Bldg. Bldg. 540.53
Bldg. Rain water
6th floor Corridor & Lobby= 45.63 Side Ver (West) 2.04
D
>
m
PROPOSED 59
ROAD>
P.P 2. LAND TO BE
13.10m
Cover
P.P
Semi P.P
Bldg.
Bldg.
Rain water PLOT 6 Std. Front/North Verandah 4.92
3.76
6 Std. U/C Apartment = 435.53
Drain
Pucca AD
IDE RO
PP 4 Std. Bldg. Bldg.
N Lift= 13.66 East Road/Front Ver 13.29
O PE Bldg. 1.83m W U/C
m.
4 Std. U/C 7 Std.
2.1
4.27m
12.95m
4 Std.
PP
E
P.P 9 Std. Semi
540.53
4m
Recharge pit for Bldg. P.P Corridor & Lobby= 45.63 Side Ver (West)
D
PP
Bldg.
m
Rain water
Bldg. Bldg. U/C Pucca
94
I
3 Std. P.P Fire Stair 13.66
D >>
W
5.
P.P P.P
15.70m A
E RO
3Std.
WIDE
<< 3.96m
Front/North Verandah
Bldg. Pucca Rain water Semi Recharge pit for
I
Bldg. SP 1 Std. Bldg. Apartment = 435.53
Rain water 1.37m
.
. 2 8 m W
R
2 Std. 4 Std.
Pucca Lift= 13.66 East Road/Front Ver 13.29 20.00m. .
<< 2
OAD
m
9 Std. 9 Std. P.P P.P P.P 8 Std. 5 Std. 3 Std. Bldg. Stair= 11.80 Proposed Electric Connection 2.08m. 1 .80
Bldg.
ROAD
1.52m.
Bldg. 8th floor Side Ver (West) 2.04 400 KW
6 Std. SP Corridor & Lobby= 45.63
1.5
Bldg. Bldg. Bldg. Bldg. IP
Bldg.
3m
3 Std. 7 Std. Semi Fire Stair 13.66 Proposed Water Connection 1 m.
6 Std. U/C 13.7
.
Bldg. 5 Std. 3 Std. 7Std. Pucca 14,000 Gallon m. 3.76m. 2.44m.
Bldg. 5.22
D
0.44m.
Bldg. P.P
ROA
6 Std. P.P Bldg. 4.92
1.52
Front/North Verandah IP
P.P P.P 5 Std. Bldg. .
P.P .69m
IDE
Apartment = 435.53 Recharge pit for
IDE ROAD
6 Std. Bldg. P.P 6
W P.P
2.29m
m.
Bldg. Lift= 13.66 East Road/Front Ver 13.29
2 Std. m 3 Std.
P.P 3.66m W
Rain water
1.57m.
P.P P.P 4.5 7 6 Std. Bldg. 3 Std. Stair= 11.80 2.47m.
7.28m.
6 Std. Bldg. Bldg. SP Side Ver (West) 2.04
.
6 Std. P.P 5 Std. Semi Corridor & Lobby= 45.63 1.40m.
6 Std. Bldg.
Bldg. Semi P.P
Height=+36.12m
Bldg. 5 Std. Bldg. Bldg. 4 Std. Pucca Fire Stair
STAIR, U.G.W.R.
13.66 IP
O.H.W.R.
6 Std. P.P
from GL
Bldg. 3 Std. Machine room 32.43
4.76m.
Cover Drain
P.P Semi Bldg. Pucca Semi Pucca Roof N/A Slab Out Line
6 Std. 4 Std. Bldg. 49.53
5 Std. Pucca P.P i Semi Pucca Of Basement
1.07m.
P.P Stair 17.10 1.52m.
Bldg. 6 Std.
Bldg. 6 Std. Sem Bldg. Pucca
6 Std. a 5 Std.
Pucc
Bldg.
)
6 Std. Bldg. Total FAR Area 4627.23 1659.32 6286.55
20.50m.
Bldg. P.P Bldg. P.P
2 Std. Bldg.
.95m I
of Basement +1.22m
Bldg.
1.52m.
3.02m.
13.7
Semi P.P P.P SP 4 Std. 6 Std.
Bldg.
Semi
3 W 0.85m.
ROOF OF PARKING (Beyond FAR)
Level= +3.66 m
1
3 Std. P.P Bldg. Recharge pit for
6 Std. P.P Pucca
W ID Semi 6.92m.
m.
4.57m 8 Std. P.P
1.65m.
Bldg. P.P Rain water
Pucca
Cover Drain
m
3.66
Bldg. 4 Std.
+1.22
Bldg. P.P P.P 6 Std.
Slab outline
DE ROAD
1.01m.
Semi Bldg. Bldg.
ING =
2.43m.
P.P
WI
AD
4 Std. 6 Std.
P.P 3.66m
1.80m.
8 Std. Semi 3 Std.
E ROAD
m
P.P Pucca
9.12m.
4 Std.
PARK
Semi 1.37m.
Semi Bldg. Bldg.
m W ID 10 Std. Bldg. Pucca Bldg. (20.50+2.60+18.89)X1.37m LAND TO BE LEFT FOR
4.04m.
4.57 P.P Pucca 6 Std. Bldg. IP
WID
RO
FOR
P.P P.P P.P DAP PROPOSED 3.66M ROAD WIDEN
Pucca 6 Std. Bldg. m.
250m
1.43
O P E N
4.57m WIDE R
1.40m.
Semi NB: Set back from Road
3.01m WIDE
ER
1.42
5 Std. 4 Std. Bldg. Centre is 4.50m
Pucca 2 Std. 4 Std. Bldg. PROJECT:
m.
Bldg. Bldg.
OAD
18.03m.
Bldg. Bldg. 0m. 1.00m.
2 Std. 11.5 5.41m.
Semi 5 Std. Recharge pit for
1.93m.
Bldg.
2.29
P.P Semi 4 Std. 2.08m.
ROOF OF PARKING
Pucca Bldg.
3.84m.
(Beyond FAR)
1 Std. Bldg. Level= +2.40 m Rain water
m.
Semi Semi Pucca P.P 5 Std. 6Std. IP
5 Std. U/C 2 Std. Bldg.
Pucca Pucca Semi Bldg. Bldg. Recharge pit for
2.59m.
SW 2.92m.
44.51m.
Bldg. Pucca Bldg. 4 Std. Rain water 5.02m.
P.P
45.52m.
LIFT, STAIR, U.G.W.R.
Septic Tank
Bldg.
OAD
OAD
1.63m.
4 Std. O.H.W.R. 0.94m.
5.31m.
R P.P 6 Std. Height=+36.12m
Semi
WID E Bldg. P.P
6 Std. Semi Bldg.
4.24m.
Bldg. 3 Std. Bldg. 5.00m. POWER:
Pucca 4 Std. Bldg. Bldg. P.P 4 Std. Green Area=243.87 sqm IP 1.78m.
IP
1.52m.
P.P P.P ROOF OF PARKING
13.10
Bldg. 6 Std. Bldg.
1.0m
(24.51% of land area) (Beyond FAR)
1.27m.
Semi 1.45m.
1.27m.
8 Std. Bldg. P.P Level= +3.66 m
Cover Drain
Pucca .
2.45m
m.
Bldg. P.P 8.23m.
2.30m.
5 Std.
5 Std. 2 Std. P.P Bldg. 1.07m.
4 Std.
1.52m.
Bldg. Bldg. 7.98m.
Bldg. P.P Semi ROOF OF PARKING (Beyond FAR)
1.48m.
1.47m.
4 Std. 6 Std. Level= +3.66 m
Semi Pucca 7.96m.
2.56m.
Bldg. 5 Std. Bldg. 2.01m
.
P.P Semi Pucca
18.89m.
Semi 2 Std. Bldg. Recharge pit for
Pucca 1.76m.
Pucca P.P Bldg.
P.P E RO
AD P.P 4 Std. Rain water 2.35m.
1.63m.
Semi Bldg. IP 1.65m.
N 6 Std.
2 Std.
66m WID 3 Std.
Pucca
Semi
SP 0.63m.
PROPOSED BUILDING
IP
5.12m.
Bldg.
3 . 10(TEN)-STORIED+1(ONE) BASEMENT
3.63m.
2.1
Bldg. Bldg.
Semi Pucca
>>
4m
ROAD
P.P Semi Height = +32.15m from GL
SITE PLAN E
.
Pucca
Semi
Pucca
W I D LEGEND
<< 1.83m
>>
1.38m
1.50m.
0.88m.
1.80m.
1.80m.
IP ROOF OF PARKING
6 Std. Bldg. 6 Std. Bldg. (Beyond FAR)
3.34m.
Water Line
Level= +3.66 m
Bldg. 3.00m. 3.73m. ADDRESS:
.
3 Std.
R
1.98m.
ROOF OF PARKING
Bldg.
4 Std.
HERITAGE BUILDINGS ARE (Beyond FAR)
Sewarage Line ARCHITECT:
E
Level= +3.66 m
5.48m.
D
IP
GAS Line
1.78m.
SITUATED WITHIN 250m DIAMETER 12.9
m WI
1.40m.
2.08m.
IP GAS GAS GAS
5m.
1.65m. Recharge pit for
OF THE PROPOSED SITE. 1.35m. Rain water DCC Drain DCC DCC DCC
0.28m.
m.
1.82m.
2.08
1.31m.
2
<< 2.66
3.
16 .01
0.73m.
0.76m. 1.81m.
Recharge pit for m m.
. m
Level= +1.22
.
m
Rain water 3.83m.
94
2.16m
5.
2.45m.
m. IP Slab Out Line
LAYOUT PLAN
2.71
2.00m
2.44m. 5.26m. IP Of Basement
IP
.
Slab Out Line FOR PARKING. LEVEL=+1.22m Scale: 1:200 ENGINEER:
Of Basement
15.70m
19.45m.