Professional Documents
Culture Documents
Orrifice Flange R.5
Orrifice Flange R.5
: : : : :
PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of BFW, Daerator & Condensate
28/03/2011
BILL OF MATERIAL
N0 86 87
DESCRIPTION
ORIFICE FLANGE ORIFICE FLANGE 4" 3"
SIZE
300#, Sch.Std, WN-RF, FS, A-105 300#, WN-RF, SCH.40, Forged Steel, A105
SPECIFICATION
UNIT
Pcs Pcs
Q'TY
4 2
Page 2 of 15
: : : : :
PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Dummy Quench & charge System (Stage 1, Material Tambahan)
23/05/2011
BILL OF MATERIAL
NO DESCRIPTION SIZE SPECIFICATION UNIT QT'Y
Page 3 of 15
: PT. Krakatau Steel (Persero) : Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant : Mechanical And Piping : Bill Of Material Modification of ECW Cooling Tower :
24/05/2011
BILL OF MATERIAL
NO 93 94 DESCRIPTION ORIFICE FLANGE ORIFICE FLANGE 6" 28" SIZE A105, 300#, WN-RF, FS, ANSI B16.36 A105, 300#, WN-RF, FS, SCH.40, ANSI B16.36 SPECIFICATION UNIT Pcs Pcs QT'Y 2 2
Page 4 of 15
: : : : :
PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Heat Recuperator & Outlet Duct
27/04/2011
BILL OF MATERIAL
NO DESCRIPTION SIZE SPECIFICATION UNIT Q'TY
Page 5 of 15
: PT. Krakatau Steel (Persero) : Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant : Mechanical And Piping : Bill Of Material Modification of Medium Pressure System :
21/04/2011
BILL OF MATERIAL
No
Description
Size (inc)
Remarks
Unit
Quantity
Page 6 of 15
: PT. Krakatau Steel (Persero) : Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant : Mechanical And Piping : Bill Of Material Modification of Medium Pressure System (Tambahan) :
11/05/2011
BILL OF MATERIAL
No Description Size (inc) Remarks Unit Quantity
Page 7 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of N2 Skid & Discharge Solid Cut off Valve / Sealing Revision Prep. By Checked Approved Date
BILL OF MATERIAL
No Description Size (inch) Specification Unit
Page 8 of 15
2
11/05/2011
QT'Y
Page 9 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Quench Gas Reduction Revision Prep. By Checked Approved Date
BILL OF MATERIAL
No Description Size (inc) Remarks Unit
Page 10 of 15
2
31/03/2011
Quantity
Page 11 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of Recycle Gas Revision Prep. By Checked Approved Date
BILL OF MATERIAL
N0 32
DESCRIPTION
ORIFICE FLANGE 24"
SIZE
300#, WN-RF, FS, A105, ANSI B16.36
SPECIFICATION
UNIT
Pcs
Page 12 of 15
1
28/03/2011
Q'TY
4
Page 13 of 15
Client Project Title Package Doc.title. Doc No. : : : : : PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification Of Steam Drum 221 F1 & F2 Revision Prep. By Checked Approved Date
BILL OF MATERIAL
No
Description
Size (inc)
Remarks
Unit
Page 14 of 15
1
02/05/2011
Quantity
Page 15 of 15
: : : : :
PT. Krakatau Steel (Persero) Zero Reformer Project For 5800 TPD DR1 HYL III DR Plant Mechanical And Piping Bill Of Material Modification of BFW, Daerator & Condensate
28/03/2011
BILL OF MATERIAL
N0
DESCRIPTION
ORIFICE FLANGE ORIFICE FLANGE ORIFICE FLANGE ORIFICE FLANGE ORIFICE FLANGE 3" 4" 6" 24" 28"
SIZE
300#, WN-RF, SCH.40, Forged Steel, A105 300#, Sch.Std, WN-RF, FS, A-105 A105, 300#, WN-RF, FS, ANSI B16.36 300#, WN-RF, FS, A105, ANSI B16.36 A105, 300#, WN-RF, FS, SCH.40, ANSI B16.36
SPECIFICATION
UNIT
Pcs Pcs Pcs Pcs Pcs
Q'TY
2 4
2 4 2
87 86 93 32 94