CONTENTS
—Characteristic curves
5—
1) HP governing valve opening - STG output curve·································26
EXPLANATION OF ABBREVIATION:
(1): HP——High Pressure (cylinder)
(2): IP——Intermediate Pressure (cylinder)
(3): LP——Low Pressure (cylinder)
(4): HPH——High Pressure feed-water Heater
(5): LPH——Low Pressure feed-water Heater
(6): DE——Deaerator
(7): H.E. ——High pressure cylinder Exhaust
(8): GSH——Gland Steam Heater
(9): STG——Steam Turbine Generator
(10): FP——Feed-water Pump
(11): DP——Drain Pump
(12): CP——Circulating water Pump
(13): CW——Circulating Water
(14): T——Temperature
(15): X——Dryness
(16): CW temp——Circulating Water temperature
(17): SPO——Sliding Pressure Operation
(18): THO——The HPHs out of service condition
N17AS25.RTE
The technical data sheets of typical operating conditions
45 1
(VWO: Main steam mass flow - 1028 t/h, Condenser pressure - 0.0095 MPa(a))
specific
steam pressure temp degree isentropic
stage volume velocity stage
mass after after of enthalpy
after ratio efficiency
flow stage(N0) stage(N0) reaction drop
N0 stage(N0)
(TMCR: Main steam mass flow - 972 t/h, Condenser pressure - 0.0095 MPa(a))
specific
steam pressure temp degree isentropic
stage volume velocity stage
mass after after of enthalpy
after ratio efficiency
flow stage(N0) stage(N0) reaction drop
N0 stage(N0)
Atmosphere
Atmosphere
Atmosphere
Atmosphere
Atmosphere
2nd extraction
Atmosphere
IP front
LP rear
IP rear
HP rear
4 3 2 1 1 2 3 4 5 5 4 3 2 1 1 2 3 3 2 1 1 2 3
to LPH 4 to LPH 1
GSH
condensing water
N17AS25.RTE
45
two HP main stop value
four HP governing value
6
N17AS25.RTE
The gland leak-off高压缸前汽封漏汽量曲线
flow (HP front) curves
漏汽量(t/h)
45 7
7
6
The gland leak-off flow (HP front) curves
5
Steam flow of leak-off (t/h)
7.00
4
6.00
3
5.00
2
4.00
1
3.00
0
100 300 500 700 900 1100
2.00
总漏汽量 漏到高排汽量 进汽量(t/h)
漏入DJ4汽量 供自密封汽量
1.00
0.00
400 500 600 700 800 900 1000 1100
The total To H.E Main steam mass flow (t/h)
To LPH4 Sealing steam
To GSH
3.00
2.50
2.00
1.50
1.00
0.50
0.00
400 500 600 700 800 900 1000 1100
2.00
1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40
0.20
0.00
400 500 600 700 800 900 1000 1100
The total From the 16th stage Main steam mass flow (t/h)
To LPH4 Sealing steam
To GSH
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
400 500 600 700 800 900 1000 1100
The total Sealing steam To GSH Main steam mass flow (t/h)
0.60
0.50
0.40
0.30
0.20
0.10
0.00
400 500 600 700 800 900 1000 1100
Ⅰ 9 9
0.450 0.450 51.9748 103.9695
Ⅱ 9 18
Ⅲ# Ⅱ#
Ⅰ# Ⅳ#
N17AS25.RTE
The thermal process graph (TMCR)
45 13
32
3.9 35 37.1
750
17 .
)
3 390 .6 a(a
MP
s sure
e
pr
e nt ha lp y k J/ kg
71
875 2. 1 temperature ℃
1 3.
33 62. 2
6#
333 8.6 4 52.5
50 4.8
hs= 398.8 kJ/kg
hi= 330.3 kJ/kg
69
4 .3
306 0.3
7# 06
34 0.3 0.5
29 85.1
4#
26 1.2
39
0.1
2 747 .1
3#
136 .8
71
0.0
263 9.9
TMCR CONDITION 90 .4
2#
48
4.1 35 34.9
75 0
17.
)
3 390 .6 a(a
MP
su re
p res
e nt ha lp y k J/ kg
87
711 2. 2 te mp era tu re ℃
1 4.
33 59. 9
6#
335 0.0 4 52.2
51 2.7
hs= 385.9 kJ/kg
hi= 322.2 kJ/kg
08
4 .6
306 8.4
7# 32
34 5.7 0.5
29 83.2
4#
26 0.7
47
0.1
2 745 .5
3#
136 .4
75
0.0
263 8.6
VWO CONDITION 91 .8
2#
7#
A
91.45 3068.4
△ T=8.0 4.4699
GSH
1028.00 921.7
3 45.7 2 4 .60 81
9 31.9 5 3 068 .4
S
213.66 D
221 .66
540 .00 17. 750
1 028 .00 339 0.6
A
91.45 3068.4
0.0 0
91 .45 951 .9
△T=4.0 345.72 4.6081
B
HP
s
52.72 2931.8
6#
2.2186
452.22
△ T=8.0 1028.00 802.9
52.72 3359.9
186.71 H.E.
temp ℃
flow t/ h
1028.00 780.0 D
1 94. 71
183.68 S
C
GSH
1 44. 17 8 29. 1
DE
45.54 3163.8
FP
1.0903
838.29 642.1
5 40.0 0 4 .14 73
9 31.9 5 3 534 .9
GSH
152.08
S
5.3 7
△T=1.0
D
B
D
64.03 3009.7 0.45
4#
B
0.5164
△ T=8.0 53.17 3359.9
838.29 449.0 452.22 2.2872
B
11 4.74
106.74
IP
6 4.03 48 1.5
353.17 1.1240
E
C
24.71 2745.5
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1421 58.66 2983.2
△ T=8.0 838.29 373.9 260.67 0.5324
D
S
720.02 370.1 GSH
95.9 6
346369 kW
87.96
88.7 4 4 02.0
2.9679 kg/kW.h
7958.7 kJ/kW.h
11 8.3 396 .7
DP △T=3.0
260 .67 0.53 24
772 .38 298 3.2
GSH
F
S
29.53 2638.6
2#
9 0.96
0.0727
720.02 277.5 29.53 2638.6
2 9.53 38 1.0
0. 76
△T=3.0
VWO(CW temp 33℃
24.71 2745.5
G
1#
0.0296
LP
0.77 2922.1
GSH
27 .52 288 .2
0 .00
0.0951
S
make up
0.29
S
0.77 41 1.6
CP
15
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
1058.84 1108.8 1058.84 1130.8 30.84
锅炉
boiler
254.75 259.41
△T=2.0
7#
A
94.26 3067.6
△ T=8.0 4.4514
GSH
1058.84 920.3
3 45.2 1 4 .58 91
9 29.1 7 3 067 .6
S
213.36 D
221 .36
540 .00 17. 750
1 028 .00 339 0.6
A
94.26 3067.6
0.0 0
94 .26 950 .5
△T=4.0 345.21 4.5891
B
HP
s
54.36 2931.6
6#
2.2055
451.97
△ T=8.0 1058.84 801.3
54.36 3359.5
186.35 H.E.
temp ℃
flow t/ h
1058.84 778.4 D
1 94. 35
183.31 S
C
GSH
1 48. 63 8 27. 4
DE
46.93 3162.9
FP
1.0814
863.28 640.4
5 40.0 0 4 .13 02
9 29.1 7 3 535 .1
GSH
151.68
S
5.3 6
△T=1.0
D
B
D
65.88 3007.6 0.44
4#
B
0.5110
△ T=8.0 54.80 3359.5
863.28 447.5 451.97 2.2737
B
11 4.37
106.37
IP
6 5.88 48 0.0
352.67 1.1149
E
C
25.44 2744.2
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1403 60.53 2981.8
△ T=8.0 863.28 372.3 259.94 0.5268
D
S
741.58 368.6 GSH
95.6 0
344599 kW
87.60
91.3 3 4 00.5
2.9832 kg/kW.h
8002.1 kJ/kW.h
12 1.7 395 .2
DP △T=3.0
259 .94 0.52 68
764 .71 298 1.8
GSH
F
S
30.38 2637.2
2#
9 0.60
0.0717
741.58 276.1 30.38 2637.2
3 0.38 37 9.5
0. 74
△T=3.0
VWO(CW temp 33℃
25.44 2744.2
G
1#
0.0292
LP
0.77 2921.9
GSH
27 .90 286 .8
3 0.84
0.0951
S
make up
0.28
S
0.77 41 1.6
CP
16
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
972.00 1094.9 972.00 1116.8 0.00
锅炉
boiler
251.78 256.44
△T=2.0
7#
A
84.86 3060.3
△ T=8.0 4.2380
GSH
972.00 909.8
3 40.3 1 4 .36 91
8 82.7 6 3 060 .3
S
210.99 D
218 .99
540 .00 17. 750
972 .00 339 0.6
A
84.86 3060.3
0.0 0
84 .86 939 .6
△T=4.0 340.31 4.3691
B
HP
s
48.97 2927.9
6#
2.1063
452.54
△ T=8.0 972.00 793.0
48.97 3362.2
184.43 H.E.
temp ℃
flow t/ h
972.00 770.1 D
1 92. 43
181.42 S
C
GSH
1 33. 83 8 18. 8
DE
42.50 3166.0
FP
1.0359
795.68 634.0
5 40.0 0 3 .93 22
8 82.7 6 3 537 .1
GSH
150.19
S
5.1 0
△T=1.0
D
B
D
59.98 3011.5 0.43
4#
B
0.4912
△ T=8.0 49.40 3362.2
795.68 442.8 452.54 2.1714
B
11 3.25
105.25
IP
5 9.98 47 5.2
353.66 1.0680
E
C
23.23 2747.1
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1351 54.88 2985.1
△ T=8.0 795.68 368.2 261.22 0.5063
D
S
684.77 364.5 GSH
94.6 2
330092 kW
86.62
83.2 1 3 96.3
2.9446 kg/kW.h
7970.7 kJ/kW.h
11 0.9 391 .1
DP △T=3.0
261 .22 0.50 63
733 .91 298 5.1
GSH
F
S
27.69 2639.9
2#
8 9.62
0.0691
684.77 272.9 27.69 2639.9
2 7.69 37 5.3
0. 67
△T=3.0
TMCR(CW temp 33℃
23.23 2747.1
G
1#
0.0282
LP
0.77 2921.3
℃,Make up 0%)
GSH
24 .65 283 .6
0 .00
0.0951
S
make up
0.27
S
0.77 41 1.6
CP
17
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
1008.37 1095.8 1008.37 1117.7 29.37
锅炉
boiler
251.96 256.62
△T=2.0
7#
A
88.30 3061.1
△ T=8.0 4.2505
GSH
1008.37 910.0
3 40.7 5 4 .38 19
8 86.3 3 3 061 .1
S
211.04 D
219 .04
540 .00 17. 750
979 .00 339 0.6
A
88.30 3061.1
0.0 0
88 .30 939 .8
△T=4.0 340.75 4.3819
B
HP
s
50.98 2928.3
6#
2.1082
452.24
△ T=8.0 1008.37 792.7
50.98 3361.5
184.37 H.E.
temp ℃
flow t/ h
1008.37 769.8 D
1 92. 37
181.36 S
C
GSH
1 39. 28 8 18. 6
DE
44.19 3164.7
FP
1.0344
824.89 633.3
5 40.0 0 3 .94 38
8 86.3 3 3 537 .0
GSH
150.03
S
5.1 2
△T=1.0
D
B
D
62.24 3009.2 0.42
4#
B
0.4892
△ T=8.0 51.41 3361.5
824.89 442.0 452.24 2.1734
B
11 3.09
105.09
IP
6 2.24 47 4.5
353.08 1.0664
E
C
24.11 2745.6
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1343 57.12 2983.5
△ T=8.0 824.89 367.4 260.41 0.5043
D
S
709.82 363.7 GSH
94.4 4
330322 kW
86.44
86.3 5 3 95.6
2.9638 kg/kW.h
8013.5 kJ/kW.h
11 5.1 390 .3
DP △T=3.0
260 .41 0.50 43
731 .52 298 3.5
GSH
F
S
28.72 2638.4
2#
8 9.44
0.0686
709.82 272.1 28.72 2638.4
2 8.72 37 4.6
0. 66
△T=3.0
TMCR(CW temp 33℃
24.11 2745.6
G
1#
0.0280
LP
0.77 2921.3
℃,Make up 3%)
GSH
25 .34 282 .8
2 9.37
0.0951
S
make up
0.27
S
0.77 41 1.6
CP
18
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
769.00 1035.0 769.00 1056.5 0.00
锅炉
boiler
238.79 243.46
△T=2.0
7#
A
61.84 3043.6
△ T=8.0 3.3945
GSH
769.00 861.8
3 25.0 3 3 .49 95
7 03.5 9 3 043 .6
S
200.15 D
208 .15
540 .00 17. 750
769 .00 339 0.6
A
61.84 3043.6
0.0 0
61 .84 889 .9
△T=4.0 325.03 3.4995
B
HP
s
35.98 2912.1
6#
1.6946
454.51
△ T=8.0 769.00 752.9
35.98 3372.0
175.17 H.E.
temp ℃
flow t/ h
769.00 730.0 D
1 83. 17
172.30 S
C
GSH
97. 82 7 77. 5
DE
31.83 3176.9
FP
0.8370
639.36 600.9
5 40.0 0 3 .14 95
7 03.5 9 3 545 .0
GSH
142.51
S
4.1 0
△T=1.0
D
B
D
45.44 3022.3 0.35
4#
B
0.3986
△ T=8.0 36.33 3372.0
639.36 418.2 454.51 1.7470
B
10 7.41
99.41
IP
4 5.44 45 0.4
356.99 0.8628
E
C
18.17 2758.8
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1104 41.34 2996.4
△ T=8.0 639.36 344.9 265.24 0.4109
D
S
554.62 341.4 GSH
89.1 1
264080 kW
81.11
63.6 0 3 73.2
2.9120 kg/kW.h
8132.8 kJ/kW.h
8 4.7 367 .9
DP △T=3.0
265 .24 0.41 09
592 .41 299 6.4
GSH
F
S
21.13 2649.0
2#
8 4.11
0.0558
554.62 253.9 21.13 2649.0
2 1.13 35 2.2
0. 33
△T=3.0
18.17 2758.8
G
80%TMCR(CW temp 33℃
1#
0.0231
LP
0.77 2920.2
GSH
14 .90 264 .6
0 .00
0.0951
℃ ,Make up 0%)
S
make up
0.22
S
0.77 41 1.6
CP
19
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
576.00 965.7 576.00 986.7 0.00
锅炉
boiler
223.52 228.14
△T=2.0
7#
A
42.05 3026.3
△ T=8.0 2.5749
GSH
576.00 805.6
3 08.6 6 2 .65 45
5 31.1 2 3 026 .3
S
187.32 D
195 .32
540 .00 17. 750
576 .00 339 0.6
A
42.05 3026.3
0.0 3
42 .05 831 .9
△T=4.0 308.66 2.6545
B
HP
s
24.63 2892.5
6#
1.2916
456.69
△ T=8.0 576.00 705.5
24.63 3381.9
164.14 H.E.
temp ℃
flow t/ h
576.00 682.7 D
1 72. 14
161.44 S
C
GSH
66. 68 7 28. 8
DE
22.31 3188.4
FP
0.6410
487.02 561.6
5 40.0 0 2 .38 91
5 31.1 2 3 552 .4
GSH
133.31
S
3.1 4
△T=1.0
D
B
D
32.37 3033.9 0.27
4#
B
0.3068
△ T=8.0 24.90 3381.9
487.02 387.9 456.69 1.3316
B
10 0.20
92.20
IP
3 2.37 42 0.0
360.85 0.6608
E
C
13.11 2771.0
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.0852 29.23 3008.6
△ T=8.0 487.02 317.7 269.93 0.3163
D
S
426.38 314.4 GSH
82.6 7
198121 kW
74.67
45.4 8 3 46.1
2.9073 kg/kW.h
8399.7 kJ/kW.h
6 0.6 340 .9
DP △T=3.0
269 .93 0.31 63
453 .43 300 8.6
GSH
F
S
15.17 2660.0
2#
7 7.67
0.0431
426.38 231.4 15.17 2660.0
1 5.17 32 5.2
0. 00
△T=3.0
13.11 2771.0
G
60%TMCR(CW temp 33℃
1#
0.0180
LP
0.77 2919.0
GSH
6 .93 242 .1
0 .00
0.0951
℃ ,Make up 0%)
S
make up
0.17
S
0.77 41 1.6
CP
20
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
488.00 928.2 488.00 948.8 0.00
锅炉
boiler
215.14 219.72
△T=2.0
7#
A
33.52 3031.9
△ T=8.0 2.1954
GSH
488.00 774.9
3 06.3 6 2 .26 32
4 51.8 9 3 031 .9
S
180.26 D
188 .26
540 .00 17. 750
488 .00 339 0.6
A
33.52 3031.9
0.1 8
33 .52 800 .3
△T=4.0 306.36 2.2632
B
HP
s
19.85 2881.3
6#
1.1046
458.14
△ T=8.0 488.00 679.5
19.85 3387.3
158.04 H.E.
temp ℃
flow t/ h
488.00 656.7 D
1 66. 04
155.45 S
C
GSH
53. 37 7 02. 0
DE
18.21 3195.2
FP
0.5497
416.42 539.9
5 40.0 0 2 .03 69
4 51.8 9 3 555 .8
GSH
128.21
S
2.6 9
△T=1.0
D
B
D
26.62 3042.1 0.24
4#
B
0.2638
△ T=8.0 20.09 3387.3
416.42 371.2 458.14 1.1388
B
9 6.22
88.22
IP
2 6.62 40 3.2
363.42 0.5667
E
C
10.87 2779.3
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.0735 23.94 3016.1
△ T=8.0 416.42 302.7 273.09 0.2720
D
S
366.52 299.5 GSH
79.1 2
165279 kW
71.12
37.4 9 3 31.2
2.9526 kg/kW.h
8642.2 kJ/kW.h
4 9.9 326 .0
DP △T=3.0
273 .09 0.27 20
388 .60 301 6.1
GSH
F
S
12.41 2667.7
2#
7 4.12
0.0371
366.52 219.7 12.41 2667.7
1 2.41 31 0.3
0. 00
△T=3.0
10.87 2779.3
G
50%TMCR(CW temp 33℃
1#
0.0158
LP
0.77 2920.5
GSH
3 .95 230 .4
0 .00
0.0951
℃ ,Make up 0%)
S
make up
0.18
S
0.77 41 1.6
CP
21
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
773.00 1035.3 773.00 1057.4 0.00
锅炉
boiler
239.09 243.83
△T=2.0
7#
A
61.60 3081.8
△ T=8.0 3.4125
GSH
773.00 860.7
3 40.5 6 3 .51 81
7 07.9 1 3 081 .8
S
200.36 D
208 .36
540 .00 14. 906
773 .00 342 2.5
A
61.60 3081.8
0.0 0
61 .60 890 .9
△T=4.0 340.56 3.5181
B
HP
s
37.12 2912.5
6#
1.7021
454.33
△ T=8.0 773.00 749.0
37.12 3371.5
174.81 H.E.
temp ℃
flow t/ h
773.00 730.8 D
1 82. 81
172.48 S
C
GSH
98. 72 7 76. 0
DE
32.10 3176.5
FP
0.8407
642.18 601.6
5 40.0 0 3 .16 63
7 07.9 1 3 544 .8
GSH
142.66
S
4.0 7
△T=1.0
D
B
D
45.65 3024.3 0.35
4#
B
0.4003
△ T=8.0 37.47 3371.5
642.18 418.7 454.33 1.7547
B
10 7.53
99.53
IP
4 5.65 45 1.0
356.85 0.8667
E
C
18.26 2758.5
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1109 41.58 2996.1
△ T=8.0 642.18 345.4 265.11 0.4127
D
S
557.01 341.8 GSH
89.2 2
264136 kW
81.22
63.9 1 3 73.6
2.9265 kg/kW.h
8162.3 kJ/kW.h
8 5.2 368 .4
DP △T=3.0
265 .11 0.41 27
595 .08 299 6.1
GSH
F
S
21.25 2648.8
2#
8 4.22
0.0561
557.01 254.2 21.25 2648.8
2 1.25 35 2.7
0. 28
△T=3.0
18.26 2758.5
G
1#
0.0232
LP
0.77 2925.7
GSH
15 .07 265 .0
0 .00
0.0951
S
make up
0.22
S
0.77 41 1.6
CP
22
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
586.00 967.2 586.00 989.2 0.00
锅炉
boiler
224.48 229.27
△T=2.0
7#
A
41.76 3118.2
△ T=8.0 2.6217
GSH
586.00 804.5
3 47.8 4 2 .70 27
5 41.5 0 3 118 .2
S
188.06 D
196 .06
540 .00 11. 376
586 .00 346 0.6
A
41.76 3118.2
0.1 6
41 .76 835 .3
△T=4.0 347.84 2.7027
B
HP
s
26.48 2893.9
6#
1.3127
456.39
△ T=8.0 586.00 698.9
26.48 3381.0
163.77 H.E.
temp ℃
flow t/ h
586.00 685.4 D
1 71. 77
162.07 S
C
GSH
68. 24 7 27. 2
DE
22.90 3187.6
FP
0.6513
494.87 563.9
5 40.0 0 2 .43 25
5 41.5 0 3 552 .0
GSH
133.84
S
3.1 1
△T=1.0
D
B
D
32.95 3039.2 0.28
4#
B
0.3116
△ T=8.0 26.75 3381.0
494.87 389.6 456.39 1.3533
B
10 0.62
92.62
IP
3 2.95 42 1.7
360.52 0.6714
E
C
13.36 2770.4
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.0865 29.84 3007.8
△ T=8.0 494.87 319.3 269.61 0.3212
D
S
433.08 316.0 GSH
83.0 5
198296 kW
75.05
46.3 1 3 47.7
2.9552 kg/kW.h
8488.0 kJ/kW.h
6 1.8 342 .5
DP △T=3.0
269 .61 0.32 12
460 .73 300 7.8
GSH
F
S
15.47 2659.5
2#
7 8.05
0.0437
433.08 232.6 15.47 2659.5
1 5.47 32 6.8
0. 00
△T=3.0
13.36 2770.4
G
1#
0.0183
LP
0.76 2932.0
GSH
7 .30 243 .3
0 .00
0.0951
S
make up
0.19
S
0.76 41 1.6
CP
23
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
494.00 927.2 494.00 949.1 0.00
锅炉
boiler
215.84 220.64
△T=2.0
7#
A
32.95 3138.3
△ T=8.0 2.2253
GSH
494.00 771.4
3 52.6 5 2 .29 41
4 58.5 6 3 138 .3
S 540 .00 9.6 11
180.76 D
188 .76
494 .00 347 9.1
A
32.95 3138.3
0.3 2
32 .95 802 .6
△T=4.0 352.65 2.2941
B
HP
s
21.45 2882.4
6#
1.1170
457.79
△ T=8.0 494.00 669.7
21.45 3386.4
157.27 H.E.
temp ℃
flow t/ h
494.00 658.5 D
1 65. 27
155.86 S
C
GSH
54. 40 6 98. 7
DE
18.58 3194.4
FP
0.5557
421.02 541.4
5 40.0 0 2 .06 47
4 58.5 6 3 555 .5
GSH
128.57
S
2.6 4
△T=1.0
D
B
D
26.92 3048.6 0.24
4#
B
0.2667
△ T=8.0 21.69 3386.4
421.02 372.4 457.79 1.1516
B
9 6.51
88.51
IP
2 6.92 40 4.4
363.05 0.5729
E
C
11.01 2778.7
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.0742 24.28 3015.3
△ T=8.0 421.02 303.8 272.75 0.2749
D
S
370.50 300.6 GSH
79.3 7
165086 kW
71.37
37.9 3 3 32.3
2.9924 kg/kW.h
8729.7 kJ/kW.h
5 0.5 327 .1
DP △T=3.0
272 .75 0.27 49
392 .93 301 5.3
GSH
F
S
12.59 2667.2
2#
7 4.37
0.0375
370.50 220.5 12.59 2667.2
1 2.59 31 1.4
0. 00
△T=3.0
11.01 2778.7
G
1#
0.0159
LP
0.76 2935.5
GSH
4 .13 231 .2
0 .00
0.0951
S
make up
0.21
S
0.76 41 1.6
CP
24
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
892.00 805.0 892.00 805.0 0.00
锅炉
boiler
187.20 187.20
7#
A
0.00
GSH
892.00 805.0
3 46.9 5 4 .48 98
8 87.5 2 3 074 .5
S
187.20 D
0 .00
540 .00 17. 750
892 .00 339 0.6
A
0.00
0.0 0
B
HP
s
0.00
6#
0.00
892.00 805.0
187.20 H.E.
temp ℃
flow t/ h
892.00 782.2 D
0. 00
184.15 S
C
GSH
DE
48.65 3176.0
FP
1.1021
843.35 644.1
5 40.0 0 4 .04 09
8 87.5 2 3 536 .0
GSH
152.53
S
5.2 9
△T=1.0
D
B
D
64.13 3019.8 0.55
4#
B
0.5226
△ T=8.0 0.55
843.35 451.2
B
11 5.26
107.26
IP
6 4.13 48 3.7
359.01 1.1362
E
C
25.19 2756.3
Calculated Steam Ra te=
Calculated Heat Ra te=
STG output =
3#
0.1446 58.84 2994.4
△ T=8.0 843.35 374.8 266.17 0.5387
D
S
724.37 371.0 GSH
96.1 8
330552 kW
88.18
89.3 2 4 02.9
2.6985 kg/kW.h
8216.3 kJ/kW.h
11 9.0 397 .7
DP △T=3.0
266 .17 0.53 87
777 .35 299 4.4
GSH
F
S
29.66 2647.0
2#
9 1.18
0.0733
724.37 278.3 29.66 2647.0
2 9.66 38 1.9
(CW temp 33℃
0. 77
△T=3.0
25.19 2756.3
G
1#
0.0299
℃,Make up 0%)
LP
0.77 2922.9
GSH
27 .85 289 .0
0 .00
0.0951
S
make up
0.29
S
0.77 41 1.6
CP
25
GE NERAT OR
T= 33 ℃
N17AS25.RTE
CONDENSER
HP governing valve opening – STG output curve
HP governing valve opening-STG output curve
350
STG output(MW)
300
250
200
150
100
50
0
0 1 2 3 4
N17AS25.RTE
45
HP governing valve opening
26
Main steam mass flow-STG output curve
350
300
250
200
150
100
400 500 600 700 800 900 1000 1100
N17AS25.RTE
45
Main steam mass flow(t/h)
27
Heat rate-STG output curve
Heat rate(kJ/kW.h)
9000
8600
8400
8200
8000
7800
N17AS25.RTE
120 160 200 240 280 320 360
45
STG output(MW)
28
Steam rate-STG output curve
2.99
Steam rate(kg/kW.h)
2.97
2.96
2.95
2.94
2.93
2.92
2.91
2.90
120 160 200 240 280 320 360
N17AS25.RTE
45
STG output(MW)
29
Final feed water temperature – STG output curve
Final feedwater temperature-STG output curve
Final feedwater temperature(℃)
260
250
240
230
220
210
140 160 180 200 220 240 260 280 300 320 340 360
N17AS25.RTE
45
STG output(MW)
30
Cylinder efficiency-STG output curves
95
85
75
65
55
140 160 180 200 220 240 260 280 300 320 340 360
N17AS25.RTE
45
HP efficiency IP efficiency LP efficiency
STG output(MW)
31
Pressure after governing stage – STG output curve
Pressure after governing stage-STG output curve
Pressure after governing stage (MPa(a))
16
14
12
10
4
100 150 200 250 300 350 400
N17AS25.RTE
45
STG output(MW)
32
Pressure at extraction point – STG output curves (1)
Pressure at extraction point-STG ouput curves(1)
Pressure at extraction point(MPa(a))
5.0
4.0
3.0
2.0
1.0
0.0
130 150 170 190 210 230 250 270 290 310 330 350
N17AS25.RTE
45
7# 6# 5# 4# STG output(MW)
33
Pressure at extraction point – STG output curves (2)
Pressure at extraction point-STG ouput curves(2)
Pressure at extraction point(MPa(a))
0.18
0.15
0.13
0.10
0.08
0.05
0.03
0.00
140 160 180 200 220 240 260 280 300 320 340 360
N17AS25.RTE
45
3# 2# 1# STG output(MW)
34
Condenser back pressure variation - STG output variation curve
Condenser back pressure variation-STG output variation curve
STG output variation(kW)
8000
6000
4000
2000
-2000
-4000
-6000
-8000
-10000
-12000
N17AS25.RTE
-14000
45
-5 -4 -3 -2 -1 0 1 2 3 4 5 6 7
condenser back pressure variation(kPa)
35
Mechanical and electric loss - STG output curve
Mechanical and electric loss-STG output curve
Mechanical and electric loss(kW)
5500
5000
4500
4000
3500
3000
N17AS25.RTE
2500
45
145 170 195 220 245 270 295 320 345 370
STG output(MW)
36
N17AS25.RT
Calculation of steam velocity (1)
45 37
NOTE:
1. The calculation of steam velocity is based on VWO condition;
2. The diameter of steam extraction pipe is of turbine side.
3. The calculation of steam velocity marked with (*)is based on THO condition
N17AS25.RT
Calculation of steam velocity (2)
45 38
To LPH4 φ102.3
1×φ 82.13 1.504 0.5324 0.6122 31.13
HP
front
Sealing steam φ128.2
1×φ 129.08 0.325 0.1150 2.8356 19.86
To GSH φ94.4
1×φ 69.99 0.046 0.0951 3.4291 6.29
To LPH4 φ102.3
1×φ 82.13 1.994 0.5324 0.4924 33.20
HP
Sealing steam φ128.2
1×φ 129.08 0.407 0.1150 2.2818 20.00
rear
To GSH φ94.4
1×φ 69.99 0.061 0.0951 2.7595 6.68
To LPH4 φ102.3
1×φ 82.13 1.875 0.5324 0.6768 42.91
IP
Sealing steam φ102.3
1×φ 82.13 0.253 0.1150 3.1338 26.77
front
To GSH φ78.9
1×φ 48.89 0.069 0.0951 3.7898 14.94
NOTE:
1. The calculation of steam velocity is based on VWO condition;
2. The negative steam mass flow is referred to leak-in flow.
3. The diameter of steam extraction pipe is of turbine side.
Main steam temperature correction curves
Main steam temperature correction curves
1.0
correction rate(%)
0.8
0.6
0.4
0.2
0.0
-0.2
-0.4
-0.6
N17AS25.RTE
-0.8
45
-1.0
-40 -30 -20 -10 0 10 20 30 40
heat rate STG output main steam temperature variation(℃)
39
Main steam pressure correction curves
-2
-4
-6
N17AS25.RTE
45
-8
-7 -5 -3 -1 1 3 5 7
heat rate STG output
rate of main steam pressure variation(%)
40
Reheat steam temperature correction curves
Reheat steam temperature correction curves
3
correction rate(%)
-1
-2
N17AS25.RTE
45
-3
-40 -30 -20 -10 0 10 20 30 40
heat rate STG output reheat steam temperature variation(℃)
41
Reheat steam pressure drop correction curves
Reheat steam pressure drop correction curves
2.0
correction rate(%)
1.5
1.0
0.5
0.0
-0.5
-1.0
-1.5
N17AS25.RTE
45
-2.0
4 5 6 7 8 9 10 11 12 13 14 15 16
heat rate STG output reheat steam pressure drop(%)
42
Condenser back pressure correction curves
5.0
4.0
3.0
2.0
1.0
0.0
-1.0
-2.0
-3.0
N17AS25.RTE
45
-4.0
5 6 7 8 9 10 11 12 13 14 15 16
STG output heat rate condenser back pressure(kPa(a))
43
Exhaust volume flow - Exhaust loss curve
40
35
30
25
20
15
N17AS25.RTE
45
10
1500 2000 2500 3000 3500 4000
44
Exhaust volume flow - LP casing efficiency curve
Exhaust volume flow - LP casing efficiency curve
LP casing efficiency(%)
90.5
90.0
89.5
89.0
88.5
88.0
87.5
87.0
N17AS25.RTE
45
86.5
1550 1800 2050 2300 2550 2800 3050 3300 3550 3800 4050