CE012 Rev1
CE012 Rev1
NOTES:
400
A Water Level A 2. Setting out of pipework according to coordinates E and H.
Level Indicator
Access Ladders 3. All underground GMS pipework, DCI fittings and valves to be DENSO
wrapped.
Reinforced Concrete Manhole
4. Tank Manufacturer to design, supply and install all pipework, fittings and
Foundation Ring valves between "Start- and End of Tank Manufacturer's Pipework" as
OVERFLOW & shown in drawing.
°
Future Outlet as per
96
Detail D with additional Overflow &
Blank Flange supplied by Center Point Scour Outlet
Tank Manufacturer Coordinate E
4775
Ground Level Balancing Tank
B ND150 GMS Pipework. Volume 450 m³ B
Design and supply by Ø 10.982 m
Tank Manufacturer Height 4.775 m
ND100 GMS Pipework as
per Drawing 5521/ME/003 Ø 10982 for 450 m³ Tank
and supplied by Contractor
450
150
C C
NGL NGL
END OF TANK MANUFACTURER'S PIPEWORK
FOR CONSTRUCTION
700
400
700
ND150 GMS Pipework with Valve
600 Detail D as per Drawing 5521/ME/003 and
supplied by Contractor
Reinforced Concrete Foundation Ring 1 Changes to Schematic Layout of Pipework FK 10.02.2023
NGL
Ø 110 uPVC Class 6 Pipe Ø 160mm uPVC Class 6 Pipe to Scour Manhole No. REVISIONS APP. DATE
150
200 223
from Water Meter Manhole
750
Flange Adaptor Ø 160mm/ND150 CLIENT
Flange Adaptor Ø 110mm/ND100 END OF TANK MANUFACTURER'S PIPEWORK
Kunene
D D
TANK PIPEWORK DETAILS SCALE 1 : 50 Ø 160mm uPVC Class 6 Pipe Regional
to Booster Pump Station
260 Council
PO BOX 502 TEL: (065) 27 3950, FAX: (065) 27 3077
TANK OUTLET PIPEWORK SCALE 1 : 50 OPUWO, NAMIBIA EMAIL: info@kunenerc.com.na
Table 1000/3 PO BOX 3628 TEL: (65) 231 997, FAX: (065) 231 980
275
Flange SANS1123
PROJECT
ND100 Bend Table 1000/3
200
Shell Panel OKANGUATI WATER SUPPLY PROJECT
150
Support bracket affixed to roof structure.
Shell Panel Tank Membrane Tank Membrane
Design and Supply by Tank Manufacturer.
DRAWING TITLE
100 ND100 GMS Pipe 3.0 m long with ND100 Bend
Channel Ring Channel Ring OHAMAREMBA SITE
supplied by Tank Manufacturer
450 m3 BALANCING TANK
200 3000 150
F F
PIPEWORK DETAILS
Foundation Ring Foundation Ring
CIVIL INSTALLATION