The document is a checklist for assessing a vendor's facilities for manufacturing and supplying FRP panels. It lists 47 items describing the plant, machinery, testing facilities, quality assurance processes, and certifications the vendor must have to meet various ICF and RCF specifications. Key requirements include an RTM machine, gel coat spray gun, testing equipment for barcol hardness, viscosity, flammability, tensile strength, and water absorption, as well as certifications for ISO, factory license, and tax registration.
The document is a checklist for assessing a vendor's facilities for manufacturing and supplying FRP panels. It lists 47 items describing the plant, machinery, testing facilities, quality assurance processes, and certifications the vendor must have to meet various ICF and RCF specifications. Key requirements include an RTM machine, gel coat spray gun, testing equipment for barcol hardness, viscosity, flammability, tensile strength, and water absorption, as well as certifications for ISO, factory license, and tax registration.
The document is a checklist for assessing a vendor's facilities for manufacturing and supplying FRP panels. It lists 47 items describing the plant, machinery, testing facilities, quality assurance processes, and certifications the vendor must have to meet various ICF and RCF specifications. Key requirements include an RTM machine, gel coat spray gun, testing equipment for barcol hardness, viscosity, flammability, tensile strength, and water absorption, as well as certifications for ISO, factory license, and tax registration.
PLANT & MACHINERY (ICF/MD/SPEC. 167& 263) 1 RTM machine with all accessories, including spray gun 2 Gel coat spray gun 3 Tools & accessories 4 Patterns & Moulds TESTING FACILITY (Firm is an RDSO approved supplier for LP sheet and Vinyl Upholstery; ICF CMT also audited the facilities and documents attached in separate file)(F/43-51)(F/266) 5 Barcol Impressor 6 Stop watch 7 Beakers 8 Thermometer 9 Apparatus for conducting flammability test 10 Ford cup for measuring viscosity 11 Brookefield viscometer 12 Covered damp free area for storage of raw materials, Independent manufacturing area for FRP components, Finishing, assembly and inspection area 13 Skilled Artisans & Supervisors with specialized qualification in the manufacture of FRP products. QUALITY ASSURANCE 14 QAP - Documented procedure of manufacturing FRP components 15 Traceability of isothalic FR resin 16 ISO Certificate 17 Factory License 18 Tax registration MDTS – 133 FACILITY(OTHER THAN ICF/MD/SPEC- 167, 167A & 263) 19 Pattern making shop 20 Qualified pattern maker with ITI certificate 21 Drilling machine 22 Air compressor 23 Mould handling facilities 24 Oven (0 – 200 degree C) with digital temperature indicators 25 Paint booth 26 Painter with 5 years experience 27 Weighing balance-electronic 28 Weighing balance- mechanical 29 Calibration of weighing machine TESTING FACILITIES -MDTS:133 30 Tensile testing m/c – 2.5 MT 31 Testing facility for critical oxygen index, smoke density and toxicity index. 32 Facility for testing resistance to spread of flame 33 Hot plate 34 Digital gloss meter 35 Muffle furnace (800 degree C) with digital temperature controller and indicator 36 Izod impact testing machine 37 Electronic balance (LC- 0.001 gm) 38 Facility for testing resistance to impact test 39 Facility for testing water absorption percentage 40 Measuring and checking gauges 41 DFT meter 42 Availability of Crucibles (3 nos.), beakers, watch plate, funnel etc 43 Facility for testing gel time for resin 44 Availability of lab stirrer 45 Facility for preparation of test samples 46 Jigs & fixtures for conducting load test, tensile test 47 Digital oven (0 – 200 degree C)