KEY PLAN:

0+350

A
N A

C 0+325

0+075
0+100
0+125
0+150
0+175
0+200
0+225
0+250
0+275
0+300
0+325
0+350
0+375
0+398

05
0+0
EXIT C 0+300
LEGEND:
PLAN
B B
5
02
LUP
0+ LANE EDGE
ASPHALT EDGE
EDGE OF VERGE

0+275
0+000 PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D
14.82

14.52
16.03

15.49
14.88

15.48

13.25

14.58
14.30

13.59
15.64

13.94

13.64
12.57
15.51

15.18
N.G.L
16.53

14.89

14.59

15.35

13.35
14.80
15.89

16.39
15.64

15.50

14.57

14.51

13.91
15.71
16.15
16.14

15.11
E FINISH LEVEL

-0.38

-0.07
0.95

0.26
0.00

0.50

2.00
0.67
0.87
1.25
1.06

1.34
1.20

1.20
0.17
1.21
REV/01 ISSUED FOR APPROVAL 29/05/2023 AGWA E
CUT+ FILL ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:
FOR APPROVAL

PROFILE FOR ACCESS ROAD EMS03A (EXIT)


CLIENT: PROJECT MANAGEMENT CONSULTANT:

F
F
BECHTEL ENGINEERING COMPANY
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


DESIGN CONSULTANT: CONTRACTOR:
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

HARD STRIP

HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

PIVOT POINT PIVOT POINT


1.5% PIVOT POINT
CIVIL
PIVOT POINT PIVOT POINT
1.5% PIVOT POINT
1.5% PIVOT POINT 1.5% 1.5%
PLAN / PROFILE / CROSS SECTION ( EXIT )
1:1

4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

EMS-03A-SHEET-2 OF 4

1:1
NGL NGL NGL
Natural Ground NGL Natural Ground NGL NGL PROJECT NAME :
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground Natural Ground

RC 2 Natural Ground
5.00CM THICK ASPHALT CONCRETE WEARING COURSE Logistic Facilities in the Connector
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD
TO ACHIEVE THE STANDARD REQUIRED MIN.
INITIAL SITE PREPARATION
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
NEOM
25.00 CM SUB BASE - FORMATION SURFACE TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
H MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. H
REGION ASSET CODE CONTRACT CODE
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C" 18 606000 1100001344
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115069 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
0+000 KEY PLAN:

0+0
25
1+025

N A

B
1+000

ENTRY

0+
0 50
LEGEND:

0+075
PLAN

0+100
0+125
0+150
0+175
0+200
0+225
B B

0+250
0+275
0+300
0+305

LUP
LANE EDGE
B ASPHALT EDGE
0+975 EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

-0.11 20.52 20.63


0.00 20.35 20.35
-2.58 21.27 23.85
-6.85 22.77 29.62

-4.82 22.02 26.84


0.38 25.02 24.64

-1.35 24.27 25.62

-5.17 23.52 28.68


29.46

-5.62 27.27 32.89

-3.26 26.52 29.78

-2.01 25.77 27.78


-5.65 28.02 33.67
-1.94 28.77 30.71

E
N.G.L

FINISH LEVEL REV/01 ISSUED FOR APPROVAL 29/05/2023 AGWA E


ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:

CUT+ FILL FOR APPROVAL


CLIENT: PROJECT MANAGEMENT CONSULTANT:

PROFILE FOR ACCESS ROAD EMS03A (ENTRY )

F
F
BECHTEL ENGINEERING COMPANY
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


DESIGN CONSULTANT: CONTRACTOR:
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

HARD STRIP

HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

PIVOT POINT PIVOT POINT


1.5% PIVOT POINT
CIVIL
PIVOT POINT PIVOT POINT
1.5% PIVOT POINT
1.5% PIVOT POINT 1.5% 1.5%
PLAN / PROFILE / CROSS SECTION ( ENTRY)
1:1

4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

EMS-03A-SHEET-2 OF 4

1:1
NGL NGL NGL
Natural Ground NGL Natural Ground NGL NGL PROJECT NAME :
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground Natural Ground

RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE


Natural Ground
Logistic Facilities in the Connector
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD
TO ACHIEVE THE STANDARD REQUIRED MIN.
INITIAL SITE PREPARATION
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
NEOM
25.00 CM SUB BASE - FORMATION SURFACE TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
H MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. H
REGION ASSET CODE CONTRACT CODE
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C" 18 606000 1100001344
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115069 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

C
KEY PLAN:

0+075

175.00
N A

91.25
0+0
50

0+
02
5

0+350
0+325
0+300
0+275
0+000
LEGEND:

0+250
0+225
0+200
0+175
0+150
0+125
0+100
0+075
0+050
0+025
0+000
PLAN
B B
LUP
D
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

16.42
14.05
13.53

14.58

15.75
13.08

16.96
12.37

12.70
11.38

11.86

15.14
12.10
11.61

N.G.L

AGWA E

14.05

16.42
13.53
REV/01 ISSUED FOR APPROVAL 29/05/2023

14.58

16.96
15.75
13.08
12.37

12.70
11.38

11.86

12.10

15.14
11.61

FINISH LEVEL ISSUE NO: DESCRIPTION DATE BY


PURPOSE OF ISSUE:
FOR APPROVAL
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
CUT+ FILL CLIENT: PROJECT MANAGEMENT CONSULTANT:

PROFILE FOR INTERSECTION ACCESS ROAD WITH MAIN ROAD


F
F
BECHTEL ENGINEERING COMPANY
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


DESIGN CONSULTANT: CONTRACTOR:
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

HARD STRIP

HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

PIVOT POINT PIVOT POINT


1.5% PIVOT POINT
CIVIL
PIVOT POINT PIVOT POINT
1.5% PIVOT POINT
1.5% PIVOT POINT 1.5% 1.5% PLAN / PROFILE / CROSS SECTION ( INTERSECTION )
1:1

4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

EMS-03A-SHEET-3 OF 4

1:1
NGL NGL NGL
Natural Ground NGL Natural Ground NGL NGL PROJECT NAME :
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground Natural Ground

RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE


Natural Ground
Logistic Facilities in the Connector
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD
TO ACHIEVE THE STANDARD REQUIRED MIN.
INITIAL SITE PREPARATION
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
NEOM
25.00 CM SUB BASE - FORMATION SURFACE TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
H MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. H
REGION ASSET CODE CONTRACT CODE
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C" 18 606000 1100001344
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115069 01

1 2 3 4 5 6 7 8
0+125 1 2 3 4 5 6 7 8
KEY PLAN:

A B
0+100

0+075

B
410.00 182.00 N A

0+
05
0

1+597
0+

1+575
1+550
1+525
1+500
1+450

1+475
1+425
02

1+400
1+375
1+350
LEGEND:

1+325
1+300
1+275
5

1+250
1+225
1+200
1+175
1+150
1+125
1+100
1+075
0+000

1+050
1+025
1+000

BOX CU
0+950

0+975

PLAN
B B

LVERT
BOX CU

BOX CU
D LUP

LVERT

LVERT
LANE EDGE
ASPHALT EDGE
EDGE OF VERGE
BOX CULVERT

PROFILE
NATURAL GROUND
DESIGN LEVEL

C C

D D

E
29.42

29.45

29.45

28.62

27.43

26.22
26.46

25.82

25.46
29.36

29.08

28.64

25.29
26.00

25.56
26.76

25.67

25.27
27.07
27.77
28.41
29.31

29.21
29.12

25.13
28.11

N.G.L
29.42

29.45

29.45

27.43
28.62

26.22

25.82
E

26.46

25.46
29.36

29.08

28.64

25.29
26.00

25.56
26.76

25.67

25.27
27.07
27.77
28.41
29.31

29.21
29.12

25.13
28.11

REV/01 ISSUED FOR APPROVAL 29/05/2023 AGWA


FINISH LEVEL ISSUE NO: DESCRIPTION DATE BY
PURPOSE OF ISSUE:
FOR APPROVAL
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
CUT+ FILL CLIENT: PROJECT MANAGEMENT CONSULTANT:

PROFILE FOR INTERSECTION ACCESS ROAD WITH MAIN ROAD

F
F
BECHTEL ENGINEERING COMPANY
0.925 3.65 .50 1.00 1.00
1.00
.50

.50 3.65 .50 1.00


1.00
1.00
.50

.50 3.65

3.65 .50 17.50

.50 1.00 1.00 0.50 3.65 3.65 .50 1.00


DESIGN CONSULTANT: CONTRACTOR:
HARD STRIP

VERGE

HARD STRIP
HARD STRIP

HARD STRIP

HARD STRIP

CARRIAGEWAY

HARD STRIP

HARD STRIP
HARD STRIP

VERGE
CARRIAGEWAY
VERGE

VERGE
VERGE
VERGE

VERGE
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
EXISTING HIGHWAY 55

DESIGN CONSULTANT / CONTRACTOR NEOM / EPM

DRAWN M. AGWA 28-05-2023

CHECKED M. AGWA 28-05-2023 CHECKED


APPROVED M. AGWA 28-05-2023 APPROVED

G SCALE NTS SHEET SIZE A0 G


DISCIPLINE NAME:

PIVOT POINT PIVOT POINT


1.5% PIVOT POINT
CIVIL
PIVOT POINT PIVOT POINT
1.5% PIVOT POINT
1.5% PIVOT POINT 1.5% 1.5% PLAN / PROFILE / CROSS SECTION ( INTERSECTION )
1:1

4:1

4:1
1:1

PROTEZIONE
PROTEZIONE2

PROTEZIONE
PROTEZIONE2
1:1

1:1

4:1

1:1
1:1
4:1 4:1 4:1
1:1

4:1
1:1

EMS-03A-SHEET-4 OF 4

1:1
NGL NGL NGL
Natural Ground NGL Natural Ground NGL NGL PROJECT NAME :
5.00CM THICK ASPHALT CONCRETE WEARING COURSENGL
Natural Ground Natural Ground Natural Ground

RC 2 5.00CM THICK ASPHALT CONCRETE WEARING COURSE


Natural Ground
Logistic Facilities in the Connector
10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2
5.00CM THICK ASPHALT CONCRETE WEARING COURSE RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE 5.00CM THICK ASPHALT CONCRETE WEARING COURSE (CH 00+000 to CH 75+000)
RC 2 10.00CM THICK ASPHALT CONCRETE BASE COURSE RC 2 RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE MC 1 10.00CM THICK ASPHALT CONCRETE BASE COURSE 10.00CM THICK ASPHALT CONCRETE BASE COURSE
RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
30.00CM THICK AGGREGATE ROAD BASE COURSE MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE RC 2
10.00CM THICK ASPHALT CONCRETE BASE COURSE
Work Order No .1100001344/015
MC 1 TO ACHIEVE THE STANDARD REQUIRED MIN. TO ACHIEVE THE STANDARD REQUIRED MIN. MC 1
30.00CM THICK AGGREGATE ROAD BASE COURSE 30.00CM THICK AGGREGATE ROAD BASE COURSE
TO ACHIEVE THE STANDARD REQUIRED MIN.
CBR≥80% @ 100% COMPACTION WITH MDD CBR≥80% @ 100% COMPACTION WITH MDD
TO ACHIEVE THE STANDARD REQUIRED MIN.
INITIAL SITE PREPARATION
CBR≥80% @ 100% COMPACTION WITH MDD 25.00 CM SUB BASE - FORMATION SURFACE 25.00 CM SUB BASE - FORMATION SURFACE CBR≥80% @ 100% COMPACTION WITH MDD
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
NEOM
25.00 CM SUB BASE - FORMATION SURFACE TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED 25.00 CM SUB BASE - FORMATION SURFACE
MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. KINGDOM SAUDI ARABIA
TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. TO BE PREPARED TO ACHIEVE THE STANDARD REQUIRED
H MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. MIN. SOAKED CBR≥ 50% @ 98% COMPACTION WITH MDD. H
REGION ASSET CODE CONTRACT CODE
PROPOSED CROSS SECTION "B"
PROPOSED CROSS SECTION "C" 18 606000 1100001344
PROPOSED CROSS SECTION "D" PROPOSED CROSS SECTION "A"
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

Typical CROSS SECTION ASB CIV SHD 115069 01