The document provides information on air handling units (AHUs), fan coil units (FCUs), re-heat coils, and variable air volume (VAV) equipment for a building project. It lists 7 AHUs serving different areas with motor ratings ranging from 22KW to 37KW. It describes 7 FCUs with 0.75m3/Sec capacity and 1.5KW motors serving various mechanical rooms. 183 re-heat coils are provided in ductwork for lab, animal, and support areas. 33 VAVs are installed in ducts serving individual rooms in the office area.
The document provides information on air handling units (AHUs), fan coil units (FCUs), re-heat coils, and variable air volume (VAV) equipment for a building project. It lists 7 AHUs serving different areas with motor ratings ranging from 22KW to 37KW. It describes 7 FCUs with 0.75m3/Sec capacity and 1.5KW motors serving various mechanical rooms. 183 re-heat coils are provided in ductwork for lab, animal, and support areas. 33 VAVs are installed in ducts serving individual rooms in the office area.
The document provides information on air handling units (AHUs), fan coil units (FCUs), re-heat coils, and variable air volume (VAV) equipment for a building project. It lists 7 AHUs serving different areas with motor ratings ranging from 22KW to 37KW. It describes 7 FCUs with 0.75m3/Sec capacity and 1.5KW motors serving various mechanical rooms. 183 re-heat coils are provided in ductwork for lab, animal, and support areas. 33 VAVs are installed in ducts serving individual rooms in the office area.
(a)Lab Area 4(3W+1S) NOIDA AHU-1to 4 37 KW SF (GF/FF/SF) =15m3/Sec Penthouse (b)Animal House 3(2W+1S) AHU-5 to 7 37 KW (GF/FF/SF) =15m3/Sec -do- (c)Office Area 1 AHU-8= 37KW and 15KW (GF/FF/SF) 13m3/S -do- (d)Support Area 1 22KW- (GF) AHU- (i) Cooling FF - 9=8.6m3/S coil/heating coil/ Penthouse pre-filter /Micro Vee Filter/Steam humidifier (ii) No heating coil for office AHU. (iii) Two Fans for Office AHU. 8 Fan Coil Unit 7 Carryaire 0.75m3/Sec 1.5 KW,3 Phase (i)1 each for (FCU) Equipment Motor M/C room of NOIDA lift, 1 to 4 (penthouse) (ii) 1 for Elect. Power Room- GF (iii)1 for Fire pump room – GF (iv)1 for Plumbing Pump Room - GF 9 Re-heat Coil 183 Carryaire Installed in line Provided for Equipment ___ with duct. each room/ NOIDA combination of room in Lab/ Animal/Support area. 10 VAVs 33 Trox ___ Installed in line Provided for with duct. each room/ combination of room in office area.