GUIDE FOR PLANNING ROUTINE WORK (Preventive Maintenance Scheduled) WORK ORDER & WORK REQUEST

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 33

FOR PREVENTIVE MAINTENANCE SCHEDULING (WORK REQUEST / WORK ORDER) – DAIRY

SCHEDULE

- DOUBLE CLICK MY COMPUTER


- CLICK plns (||ADC-NASEEM) (Z:)

- DOUBLE CLICK THE WORK

- DOUBLE CLICK PM PLANNING 2014

- DOUBLE CLICK THE WORK DAIRY


- DOUBLE CLICK MAINTENANCE FORM

- DOUBLE CLICK 2014

- DOUBLE CLICK PM WORK ORDER 2014 & PM WORK REQUEST 2014


WORK ORDER

CHECK AND CHANGE THE WEEK & DATE SCHEDULE

CHECK THE WORK ORDER NO. DEPEND ON MASTER PLAN

CHECK AND CHANGE THE WORK REQUEST NO. & WORK ORDER NO. DEPENDS IN TRACKING
WORK REQUEST

CHECK THE WORK REQUEST NO. DEPEND ON MASTER PLAN

CHECK AND CHANGE THE WEEK & DATE SCHEDULE

CHECK AND CHANGE THE WORK REQUEST NO. DEPENDS ON TRACKING


- DOUBLE CLICK PM PLANNING 2014

DOUBLE CLICK TRACKING 2014


DOUBLE CLICK WO & WR TRACKING 2014

NOTE: THIS TRACKING IS COMMON FOR UTILITIES, ICE CREAM, BISCUIT, WATER TREATMENT
& DAIRY
CONFIRMATION TIME

PRD CONFIRMATION DATE

APPROVED BY

STATUS OF PM

TIME REQUEST

PM TYPE

WO & WR NO.

WO & WR CODE

PART OF EQUIPMENT / ACTION

EQUIPMENT

PRODUCTION LINE

AREA

DATE

WEEK

MONTH
LEGEND:

MONTH - COVER MONTH OF PREVENTIVE MAINTENANCE SCHEDULED

WEEK - WEEK SCHEDULED DEPEND ON THE MONTH

DATE - DATE COVER THAT WE NEED TO FINISHED THE PREVENTIVE MAINTENANCE SCHEDULED

AREA - AREA OF DEPARTMENT RESPONSIBLE FOR P.M. SCHEDULE

PRODUCTION LINE - LOCATION OF SECTION RESPONSIBLE FOR P.M. SCHEDULE

EQUIPMENT - MACHINES / EQUIPMENT NEED TO CONDUCT P.M.

PART OF EQUIPMENT - HOW TO CONDUCT PREVENTIVE MAINTENANCE


/ ACTIONS

WO & WR CODE - WORK ORDER CODE & WORK REQUEST CODE (CHECK IN MASTER PLAN)

WO & WR NO. - COMMON NO. FOR UTILITIES, ICE CREAM, BISCUIT, WATER TREATMENT, DAIRY OR PLANNED
MAINTENANCE

PM TYPE - WHAT TYPE OF PM (PREVENTIVE MAINTENANCE OR PLANNED MAINTENANCE)

TIME REQUEST - REQUEST TIME FOR CONDUCTING OF PREVENTIVE MAINTENANCE

STATUS OF PM - STATUS IF THE PM IS GENERATED, RESCHEDULED, CANCELLED OR DONE

GENERETED & RESCHEDULED IS YELLOW COLOR, CANCELLED IS RED & DONE GREEN

CONFIRM BY - CONFIRMATION OF WORK ORDER AND WORK REQUEST BY SUPERVISOR OR MANAGER

CONFIRMATION DATE- TO CONFIRMED THE DATE, TO START OF P.M.

CONFIRMATION TIME - TO CONFIRMED THE TIME, TO START OF P.M.


FOR PREVENTIVE MAINTENANCE SCHEDULING (MASTER PLAN) – DAIRY SCHEDULE

- DOUBLE CLICK MY COMPUTER


- CLICK plns (||ADC-NASEEM) (Z:)

- DOUBLE CLICK THE WORK

- DOUBLE CLICK PM PLANNING 2014

- DOUBLE CLICK THE WORK DAIRY


DOUBLE CLICK DAIRY MASTER PLAN

DOUBLE CLICK BOTTLE FILLING MACHINE-1, SAME AS CARTON FILLING MACHINE, CUP FILLING
MACHINE, PROCESS 2014 & VALVE & CALIBRATION
DOUBLE CLICK BOTTLE FILLING MACHINE MASTER PLAN SAME AS CARTON FILLING MACHINE
MASTER PLAN, CUP FILLING MACHINE MASTER PLAN, PROCESS 2014 MASTER PLAN & VALVE &
CALIBRATION MASTER PLAN (EXCEL)

PINK SCHEDULED FOR WO/WR

GREEN (DONE LAST WO/WR)


SAMPLE IN ACTUAL WORK ORDER & WORK REQUEST
THIS PICTURE IS FOR WORK ORDER CODE & WORK REQUEST CODE
THIS PICTURE IS FOR WORK ORDER NO. & WORK REQUEST NO.
THIS PICTURE IS FOR MACHINES & PARTS OF MACHINES
THIS PICTURE IS FOR THE FREQUENCY OF PREVENTIVE MAINTENANCE
THIS PICTURE IS FOR THE WORK INSTRUCTION & SPARE PARTS NEED FOR PM

THIS IS THE COVERED MONTH/YEAR


THIS PICTURE IS FOR THE WEEK OPEN & DATE OF THE WHOLE THAT WE NEED CONDUCT A PM

THIS PICTURE IS FOR THE LINE OR AREA OF RESPONSIBLE DEPARTMENT OR SECTION


THIS PICTURE IS FOR THE LINE OR AREA OF RESPONSIBLE DEPARTMENT OR SECTION
THIS PICTURE IS FOR THE AREA OF RESPONSIBLE DEPARTMENT OR SECTION
THIS PICTURE IS FOR THE LINE OF RESPECTIVE DEPARTMENT OR SECTION
THIS PICTURE IS FOR THE EQUIPMENT OR MACHINE FOR P.M.
THIS PICTURE IS FOR THE TASK OF P.M. SCHEDULE
THIS PICTURE IS FOR THE WORK ORDER CODE & WORK REQUEST CODE
THIS PICTURE IS FOR THE WORK ORDER NO. & WORK REQUEST NO.
THIS PICTURE IS FOR THE P.M. TYPE (PLANNED MAINTENANCE OR PM SCHEDULE OR URGENT)
THIS PICTURE IS FOR THE TIME NEEDED TO WORK/CONDUCT THE P.M. SCHEDULE
THIS PICTURE IS FOR THE SIGNATORY OF SUPERVISOR OR MANAGER FOR AFFECTED P.M. AREA
THIS DATE IS FOR START OF TASK

PERSONNEL WHO CONDUCT PM

SUPERVISOR OF PERSONNEL WHO CONDUCT PM