Professional Documents
Culture Documents
SMS Monthly Progress 2023 Rev
SMS Monthly Progress 2023 Rev
,LTD
8 2.7.3.1 In soft material (using 20T Excavator) 32,566.14 2.97% 12 days 09-12-23 22-12-23 0.9 1.8 0.2
9 2.7.3.2 In weathered rock (using 30T Excavator) 49,428.44 4.50% 6 days 23-12-23 29-12-23 4.5 86.99
10 2.7.4 Foundation preaparation and treatment 8 days 30-12-23 09-01-24
11 2.7.4.1 Preparation of final foundation surface before concreting 689.15 0.06% 2 days 30-12-23 01-01-24 0.1
12 2.7.4.2 Dental concrete 0 days 09-01-24 09-01-24 82.74
13 2.7.5 Treatment of cut surfaces in open cut excavations 174 days 22-12-23 13-06-24
14 2.7.5.1 Dia. 25 mm Rockbolts in rock surfaces in open cut excavations 0 days 22-12-23 13-06-24
15 2.7.5.2 Dia. 25 mm Anchor Bars 0 days 22-12-23 13-06-24
16 2.7.5.3 Dia. 30 mm Soil Nails (deformed hollow type bars) 0 days 22-12-23 13-06-24 77.84
17 2.7.5.4 Dia. 55 mm Drainage Pipe and Geotextile Wrapping for slope excavation 0 days 22-12-23 13-06-24
Shotcrete (nominal average thickness of 50 mm) without wire mesh or steel
18 2.7.5.5 5,751.00 0.52% 2 days 23-12-23 25-12-23 0.5
fiber on temporary slope
Shotcrete (nominal average thickness of 100 mm) with wire mesh (DB 4 mm 72.25
19 2.7.5.6 55,056.00 5.02% 7 days 26-12-23 02-01-24 1.0 4.0
@100 mm x 100 mm) on permanent slope
Shotcrete (nominal average thickness of 100 mm) with steel fiber on
20 2.7.5.7 0 days 08-12-23 08-12-23
permanent slope
21 2.7.6 Drilling and Grouting 0 days 06-12-23 06-12-23
67.05
22 2.7.6.1 Drilling for grout curtain 0 days 06-12-23 06-12-23
23 2.7.6.1a Setting up for drilling curtain grout curtain holes 0 days 06-12-23 06-12-23
24 2.7.6.1b Drilling 76 mm diameter holes with core recovery 0 days 06-12-23 06-12-23
25 2.7.6.1c Drilling 76 mm diameter holes without core recovery 0 days 06-12-23 06-12-23
62.17
26 2.7.6.1d Drilling 48 mm diameter holes 0 days 06-12-23 06-12-23
27 2.7.6.2 Drilling for consolidation grouting 0 days 06-12-23 06-12-23
28 2.7.6.2a Setting up for drilling consolidation grout holes 0 days 06-12-23 06-12-23
29 2.7.6.2b Drilling 76 mm diameter holes with core recovery 0 days 06-12-23 06-12-23
57.29
30 2.7.6.3 Water pressure testing for 5 pressures (Lugeon's Test method) 0 days 06-12-23 06-12-23
31 2.7.6.4 grout mix 0 days 06-12-23 06-12-23
32 2.7.6.5 Submission of final reports for Drilling and Grouting 0 days 06-12-23 06-12-23
33 2.7.7 Conventional concrete 93 days 02-01-24 18-04-24
52.40
34 2.7.7.1 Class C 12/15 Backfill Concrete 9,050.00 0.82% 30 days 15-02-24 20-03-24 0.2 0.2 0.2 0.2 0.2
35 2.7.7.2 Class C 12/15 Lean Concrete 10,000.00 0.91% 3 days 02-01-24 04-01-24 0.9
36 2.7.7.3 Class C 12/15 Porous Concrete 12,300.00 1.12% 30 days 15-02-24 20-03-24 0.2 0.2 0.2 0.2 0.2
37 2.7.7.4 Class C 25/30 Reinforced Concrete 494,208.00 45.02% 90 days 05-01-24 18-04-24 1.0 4.6 3.0 3.5 3.1 3.3
47.523.1 3.0 3.0 3.0 3.0 3.8 3.2 ### 2.0
38 2.7.7.5 Class C 50/60 Abrasion (high)-resistant concrete 0 days 16-01-24 16-01-24
39 2.7.8 Reinforcement 90 days 05-01-24 18-04-24
40 2.7.8.1 Reinforcing steel, f'y = 420 MPa 243,337.60 22.17% 90 days 05-01-24 18-04-24 0.5 1.5 2.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.4 1.5 1.6 1.5
41 2.7.9 Joints, Waterstop, contact treatments 90 days 05-01-24 18-04-24 42.58
42 2.7.9.1 Waterstop width between 250 mm and 300 mm 1,984.00 0.18% 90 days 05-01-24 18-04-24 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
43 2.7.10 Embankment and Miscellaneous Fill 51 days 01-04-24 29-05-24
44 2.7.10.1 Filter 32,357.00 2.95% 45 days 01-04-24 22-05-24 0.4 0.2 0.2 0.5 0.7 0.6 0.4 0.1
45 2.7.10.2 Compacted Backfill 30% fine content 47,900.00 4.36% 45 days 01-04-24 22-05-24 37.83 0.5 0.3 0.1 0.6 1.0 0.8 0.5 0.3
46 2.7.10.3 Transition 10,336.00 0.94% 45 days 08-04-24 29-05-24 0.0 0.0 0.0 0.3 0.2 0.1 0.1
47 2.7.10.4 Riprap 29,034.00 2.65% 45 days 08-04-24 29-05-24 0.3 0.1 0.5 0.6 0.5 0.4 0.3
33.23
Page 1 of 4
42.58
Total
December,2023 January,2024 37.83 February,2024 March,2024 April,2024 May,2024 June,2024
Amount
Id Item Task name % Duration Start Finish Remark
(USD) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
48 2.7.10.5 Compacted gravel 8,778.00 0.80% 5 days 19-04-24 24-04-24 0.1 0.7
33.23
49 2.7.10.6 Material 50% fine Dmax 2-5mm 6,285.00 0.57% 10 days 19-04-24 30-04-24 0.1 0.5 100.00
99.93
50 2.7.11 D/S riverbed protection works 3 days 19-04-24 22-04-24 99.25
51 2.7.11.1 Rockfill packing (max. stone size 1000mm) 3,186.00 0.29% 3 days 19-04-24 22-04-24 0.0 0.2 97.98
52 Rockfill packing (max. stone size 300mm) 2,826.00 0.26% 3 days 19-04-24 22-04-24 0.0 0.2
28.23 96.19
53 2.7.12 Miscellaneous Items 137 days 05-01-24 12-06-24
54 2.7.12.1 Piezometer cell 5,700.00 0.52% 3 days 03-06-24 05-06-24 0.5
93.69
55 2.7.12.2 Topographic mark 1,800.00 0.16% 3 days 30-05-24 01-06-24 0.2
56 2.7.12.3 Vertical staff gauge for reservoir level reading 765.00 0.07% 6 days 06-06-24 12-06-24 0.1
57 2.7.12.4 Dia. 55 mm PVC Pipe for Pressure relief well 1,125.00 0.10% 2 days 23-05-24 24-05-24 22.72 90.69 0.1
58 2.7.12.5 Dia.100 mm Drainage PVC Pipe to release water under raft 390.00 0.04% 2 days 05-01-24 06-01-24 0.0
59 Bill N° 3.7 Bangliang-1 Intake Structure 32 days 19-04-24 25-05-24
60 3.7.1 Preparation of foundation for concreting 1 days 19-04-24 19-04-24 86.99
61 3.7.1.1 Preparation of final foundation surface before concreting 19.25 0.00% 1 days 19-04-24 19-04-24 0.0
62 3.7.2 Conventional concrete 31 days 20-04-24 13-05-24 16.63
63 3.7.2.1 Class C 12/15 Plum Concrete 200.00 0.02% 1 days 13-05-24 13-05-24 0.0
82.74
64 3.7.2.2 Class C 12/15 Lean Concrete 400.00 0.04% 1 days 20-04-24 20-04-24 0.0
65 3.7.2.3 Class C 20/25 Reinforced Concrete 14,400.00 1.31% 30 days 22-04-24 25-05-24 0.3 0.3 0.3 0.3 0.3
66 3.7.2.4 Class C 50/60 Abrasion (high)-resistant concrete
67 3.7.2.5 Class C 30/37 Second stage concrete, with non-shrink agent 10.09 77.84
68 3.7.3 Reinforcement 30 days 22-04-24 25-05-24
69 3.7.3.1 Reinforcing steel, f'y = 400 MPa 5,500.00 0.50% 30 days 22-04-24 25-05-24 0.1 0.1 0.1 0.1 0.1
70 3.7.3.2 Plain round mild steel, f'y = 240 MPa
71 3.7.4 Joints, Waterstop, contact treatments 30-04-24 30-04-24
Progress on Plan
72 3.7.4.1 Waterstop width between 250 mm and 300 mm 30-04-24 30-04-24 3.90 72.25
73 3.7.5 Furnishing, fabrication and installing of metalwork 30-04-24 30-04-24 Progress by Actual
Galvanised high yield 250 grade structural steel handrails and gratings 1.41
74 3.7.5.1 including all embedded parts, frames etc. of same grade steel to fix them in 30-04-24 30-04-24 0.11
the concrete
67.05
Total 1,097,661 100%
Weekly % 0.11 1.30 2.48 6.19 6.54 6.09 5.51 5.01 4.60 4.75 4.95 4.88 4.88 4.88 4.88 5.20 5.60 4.90 4.25 3.70 3.00 2.50 1.79 1.27 0.68 0.07
Total of weekly % 0.11 1.41 3.90 10.09 16.63 22.72 28.23 33.23 37.83 42.58 47.52 52.40 57.29 62.17 67.05 72.25 77.84 82.74 86.99 90.69 93.69 96.19 97.98 99.25 99.93 100.00
Monthly Work Progress on Plan
Monthly % 10.09 23.14 19.17 62.17 19.84 18.44 8.56 0.75
Total of Monthly % 10.09 33.23 52.40 72.25 90.69 99.25 100.00
Weekly %
Total of weekly % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Monthly Work Progress by Actual
Monthly % 0.00 0.00 0.00 57.29 0.00 0.00 0.00 0.00
Total of Monthly % 0.00 0.00 0.00 0.00 0.00 0.00 0.00
52.40
47.52
42.58
37.83
33.23
28.23
Page 2 of 4
NAM PHAK HYDROPOWER PROJECT SOKE MAHASUP CONSTRUCTION CO.,LTD
3.90 Page 3 of 4
1.41
0.11
16.63
Progress on Plan
Total of weekly % 0.11 1.41 3.90 10.09 16.63 22.72 28.23 33.23 37.83 42.58 47.52 52.40 57.29 62.17 67.05 72.25 77.84 82.74 86.99 90.69 93.69 96.19 97.98 99.25 99.93 100.00
Monthly Work Progress on Plan 86.99
Monthly % 10.09 23.14 19.17 19.84 18.44 8.56 0.75
Total of Monthly % 10.09 33.23 52.40 72.25 90.69 99.25 100.00
Weekly % 82.74
Total of weekly % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Monthly Work Progress by Actual
Monthly % 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total of Monthly % 0.00 0.00 0.00 0.00 77.84 0.00 0.00 0.00
72.25
67.05
62.17
57.29
52.40
47.52
42.58
37.83
33.23
28.23
22.72
16.63
Progress on Plan
Progress by Actual
10.09
3.90
1.41
0.11
Page 4 of 4