Paradip Refinery
DATE:09.04.2023
Topic Covered:
LOSS OF FLOW IN ANY 1 PASS CV IN CDU FURNACE F-
101/201
Faculty: MD ARIF
Training Session Attended By:
Sl. Sl.
No Name Signature/Date No. Name Signature/Date
.
ANIL
1 8
GYAN
2 9
DHEERAJ
3 10
ARVIND
4 11
GIRIRAJ
5 12
DHARMENDRA
6 13
7 14
Low Crude flow in CDU Furnace. Ensure firing is stopped to avoid coking in coil. Thermal sock
may arise in furnace.
Either hydrocarbon / coil purging steam should flow in coils till furnace box is cooled. Do not
allow the furnace run dry.
Inform Panel Officers / Shift in Charge. Don’t bypass any process interlocks / approved procedure.
Ensure Coil purging steam in F- 101/201/002 is warmed up condition, free of condensate.
Hammering in Coil may arise. Header should be properly warmed up and IVs to be fully
opened.
On flow reducing below trip value ensure furnace F-101/201 is tripped on Low Low flow
Interlock. Check XZVs in field for physically verifying valve closure.
On NO Flow Condition in any passes F-101/201 furnace coils may coke / oxidized due to high
radiation / convection heat. This may lead to Coil Metal Failure, High Skin Temp.
Establish coil purging steam flow gradually in that particular pass if HC flow with bypass
valve is not opened. Hammering may happen. Ensure coil purging steam is dry.