Mock drills were conducted in January and February 2023 at the AVU and PDR plants to address hot naptha leaks from pumps and an emergency coil leak. A schedule was outlined for mock drill topics from March 2023 through March 2024, including total pump and power failures, fires, leaks, and other emergency scenarios to prepare for. Drills would be held monthly to address various failure modes across the plants.
Mock drills were conducted in January and February 2023 at the AVU and PDR plants to address hot naptha leaks from pumps and an emergency coil leak. A schedule was outlined for mock drill topics from March 2023 through March 2024, including total pump and power failures, fires, leaks, and other emergency scenarios to prepare for. Drills would be held monthly to address various failure modes across the plants.
Mock drills were conducted in January and February 2023 at the AVU and PDR plants to address hot naptha leaks from pumps and an emergency coil leak. A schedule was outlined for mock drill topics from March 2023 through March 2024, including total pump and power failures, fires, leaks, and other emergency scenarios to prepare for. Drills would be held monthly to address various failure modes across the plants.
Month Mock Drills done in Jan and Feb 2023 in AVU, PDR
Hot Naptha leak from TPA pump 10-P-004B
Jan-23 Emergency handling due to Coil leak in VDU furnace Hot Naptha leak from TPA pump due to seal leak of 10-P-004C Feb-23 Leak in running pump of P-24 warm up spool Month Mock drill topics for year 2023-24 in AVU, PDR Total failure of all running crude pumps 201-P-001A/B/C/D/E) Total power failure Mar-23 Total failure of both running flash crude pump 10-P-003A/B/C trip Total failure of both running RCO pumps 10-P-007A/B trip Instrument air failure Total failure of both running VR pumps 10-P-0025A/B/C trip Apr-23 Water shot in desalters Failure of compressor 10-K-003A/B Nitrogen failure Partial failure of running crude pumps 201-P-001A/B/C/D/E) May-23 Cooling water failure MP steam failure at battery limit CDU heater tube rupture and fire in furnace Total failure of both running flash crude pump 10-P-003A/B/C trip Jun-23 Total power failure Fuel gas failure VDU heater tube rupture and fire in furnace Total failure of both running VR pumps 10-P-0025A/B/C trip Jul-23 Water shot in desalters Instrument air failure Fuel oil failure Vacuum loss in VDU column Aug-23 Emergency due to fire in running VR pump 10-P-025A LPG leak from 011-C-002 (SR-LPG Caustic wash column) CDU Furnace F-101 and F-201 tripping FD pump failure in VDU furnace Sep-23 Emergency due to fire in running RCO pump 10-P-007A Total failure of both running flash crude pump 10-P-003A/B/C trip Total failure of all running crude pumps 201-P-001A/B/C/D/E) Total power failure Oct-23 Hot Naptha leak from TPA pump due to seal leak of pump 10-P-004A/B/C Instrument air failure Total failure of both running VR pumps 10-P-0025A/B/C trip Water shot in desalters Nov-23 Failure of compressor 10-K-003A/B CDU heater tube rupture and fire in furnace Fuel oil failure Vacuum loss in VDU column Dec-23 Emergency due to fire in running VR pump 10-P-025A LPG leak from 011-C-002 (SR-LPG Caustic wash column) Emergency due to fire in running RCO pump 10-P-007A Total failure of both running VR pumps 10-P-0025A/B/C trip Jan-24 Total power failure Jan-24
Total failure of both running flash crude pump 10-P-003A/B/C trip
Total failure of all running crude pumps 201-P-001A/B/C/D/E) VDU heater tube rupture and fire in furnace Feb-24 Cooling water failure MP steam failure at battery limit Total failure of both running flash crude pump 10-P-003A/B/C trip Total failure of both running VR pumps 10-P-0025A/B/C trip Mar-24 Water shot in desalters Vacuum loss in VDU column