SCOPE OF WORK
Description QTY Price/Month Total /hour
Sr.o (SR.) (SR.)

SCOPE OF WORK
1. Dismantle the piping connection of the old
radiator
2. Removal of existing radiator using Craine
01 3. Displace the old radiator to scrap yard using 1 Lot( 2
crane pumps ) 67,000 67,000
4. Installation of New base /Skid using Tubes
and checker plate as per the dimension of
then existing radiator
5. Install the new Radiator above the new skid f
6. Re connect the piping
7. Fabricate and install the new safety mesh for
the radiator

Amount in words: Sixty six thousand Saudi riyals only 67,000


TERMS and CONDITIONS.
1. VAT : 15% extra, as applicable
2. Quotation validity : 15 days
3. Delivery time : 1 month
4. Craine : will be under the scope of the Client

We hope the above is in order and awaiting your valuable order on us,