Laporan Pagar Jaksa
Laporan Pagar Jaksa
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Pengguna Anggaran (PA)
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DINAS PEKERJAAN UMUM DAN PERUMA
KOTA SABANG
Pengawas Direksi
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT CV. BATOR ACEH CONSULTA
KOTA SABANG
RIZQY KURNIAWAN
NIP. 19831208 200801 1 001
terb#REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
Terjemahan kedalam kalimat
terb#REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
terb#REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
UMUM DAN PERUMAHAN RAKYAT
GAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NST/CK-PSU/2023
ONSULTANT
Menyetujui :
Pengguna Anggaran (PA)
S PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
KOTA SABANG
LUQMANULHAKIM, S.T., M. T
Pembina Utama Muda
NIP. 19691024 199903 1 012
BER 2023
60 Hari Kalender
1 BULAN
2 BULAN
#REF! @
#REF! @
@
***
#REF! #REF!
#REF!
1 <=== Bahasa <1> Indonesia, <2> Inggris
#REF! @
#REF! @
@
***
#REF! #REF!
#REF!
#REF! @
#REF! @
@
***
#REF! #REF!
#REF!
SERTIFIKAT BULANAN
NILAI
NILAI
NOMOR PEKERJAAN PROSENTASE FISIK s/d
URAIAN PEKERJAAN KONTRAK AWAL
DEVISI s/d SAAT INI SAAT INI (%)
(Rp.)
(Rp.)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN 1,200,000.00 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH 1,749,891.03 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI 2,634,400.00 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI 11,184,965.00 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG 30,912,925.60 7,213,194.53 4.62
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM 74,573,583.07 -
4.4.1. PEKERJAAN DINDING PASANGAN 6,953,686.08 -
4.4.2. PEKERJAAN PLASTERAN 8,468,003.20
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING 5,359,950.70
4.7.1. PEKERJAAN PENGECATAN 12,241,933.50
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT 1,000,000.00
SUB TOTAL TANPA SP3D 10 % 156,279,338.18 23,982,450.56
SP3D 10 % 15,627,933.82 2,398,245.06
15.35
TOTAL KESELURUHAN 171,907,272.00 26,380,695.62
POTONGAN - POTONGAN :
1. NILAI SERTIFIKAT BERSIH S/D BULAN LALU
2. UANG RETENSI / JAMINAN PEMELIHARAAN S/D BULAN INI (5%) 1,319,034.78
3.PENGEMBALIAN UANG MUKA S/D BULAN INI (30%x S) 7,914,208.68
TOTAL NILAI POTONGAN (1+2+3) 9,233,243.47
NILAI BERSIH 17,147,452.15
TERBILANG : Tujuh Belas Juta Seratus Empat Puluh Tujuh Ribu Empat Ratus Lima Puluh Dua Rupiah Lima Belas Sen
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 BULAN KE : 1
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 7-Aug-23 s/d 7-Sep-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES BULAN LALU : - %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES BULAN INI : 15.35 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D BULAN INI : 15.35 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN BOBOT BULAN S/D BULAN BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA BULAN INI
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 - - - -
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 - - - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 - - - -
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 - - - -
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 - - - -
Jumlah 30,912,925.60 19.78 7,213,194.53 4.62
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 - - - -
Jumlah 6,953,686.08 4.45 - -
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 - - - -
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 - - - -
Jumlah 8,468,003.20 5.42 - -
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 - - - -
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 - - - -
Jumlah 5,359,950.70 3.43 - -
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 1
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 7-Aug-23 s/d 14-Aug-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : - %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 2.45 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 2.45 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 - - - -
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 - - - -
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 - - - -
Jumlah 1,749,891.03 1.12 - -
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 - - - -
Jumlah 11,184,965.00 7.16 - -
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 - - - -
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 - - - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 - - - -
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 - - - -
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 - - - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 - - - -
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 - - - -
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 - - - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 - - - -
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 - - - -
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 - - - -
Jumlah 30,912,925.60 19.78 - -
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 - - - -
Jumlah 6,953,686.08 4.45 - -
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 - - - -
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 - - - -
Jumlah 8,468,003.20 5.42 - -
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 - - - -
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 - - - -
Jumlah 5,359,950.70 3.43 - -
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 2
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 15-Aug-23 s/d 22-Aug-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 2.45 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 1.12 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 3.57 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 - - - -
Jumlah 11,184,965.00 7.16 - -
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 - - - -
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 - - - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 - - - -
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 - - - -
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 - - - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 - - - -
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 - - - -
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 - - - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 - - - -
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 - - - -
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 - - - -
Jumlah 30,912,925.60 19.78 - -
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 - - - -
Jumlah 6,953,686.08 4.45 - -
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 - - - -
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 - - - -
Jumlah 8,468,003.20 5.42 - -
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 - - - -
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 - - - -
Jumlah 5,359,950.70 3.43 - -
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 3
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 23-Aug-23 s/d 30-Aug-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 3.57 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 7.16 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 10.73 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 - - - -
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 - - - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 - - - -
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 - - - -
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 - - - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 - - - -
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 - - - -
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 - - - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 - - - -
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 - - - -
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 - - - -
Jumlah 30,912,925.60 19.78 - -
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 - - - -
Jumlah 6,953,686.08 4.45 - -
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 - - - -
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 - - - -
Jumlah 8,468,003.20 5.42 - -
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 - - - -
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 - - - -
Jumlah 5,359,950.70 3.43 - -
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 4
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 31-Aug-23 s/d 7-Sep-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 10.73 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 4.62 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 15.35 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 - - - -
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 - - - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 - - - -
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 - - - -
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 - - - -
Jumlah 30,912,925.60 19.78 7,213,194.53 4.62
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 - - - -
Jumlah 6,953,686.08 4.45 - -
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 - - - -
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 - - - -
Jumlah 8,468,003.20 5.42 - -
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 - - - -
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 - - - -
Jumlah 5,359,950.70 3.43 - -
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NILAI NILAI
NOMOR PROSENTASE FISIK s/d
URAIAN PEKERJAAN KONTRAK AWAL PEKERJAAN s/d
DEVISI SAAT INI (%)
(Rp.) SAAT INI (Rp.)
POTONGAN - POTONGAN :
1. NILAI SERTIFIKAT BERSIH S/D BULAN LALU 17,147,452.15
2. UANG RETENSI / JAMINAN PEMELIHARAAN S/D BULAN INI (5%) 8,595,363.60
3.PENGEMBALIAN UANG MUKA S/D BULAN INI (30%x S) 51,572,181.60
TOTAL NILAI POTONGAN (1+2+3) 77,314,997.35
NILAI BERSIH 94,592,274.65
TERBILANG : Sembilan Puluh Empat Juta Lima Ratus Sembilan Puluh Dua Ribu Dua Ratus Tujuh Puluh Empat Rupiah Enam Puluh Lima Se
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 BULAN KE : 2
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 8-Sep-23 s/d 9-Oct-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES BULAN LALU : 15.35 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES BULAN INI : 84.65 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D BULAN INI : 100.00 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN BOBOT BULAN S/D BULAN BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA BULAN INI
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 4.42 4.42 100.00 9,139,008.58 5.85
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 0.84 0.84 100.00 1,736,825.16 1.11
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 80.20 80.20 100.00 1,702,726.20 1.09
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 29.72 29.72 100.00 630,985.32 0.40
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 13.40 13.40 100.00 4,302,485.40 2.75
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 0.23 0.23 100.00 475,559.27 0.30
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 13.06 13.06 100.00 277,276.86 0.18
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 3.48 3.48 100.00 1,141,025.88 0.73
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 0.26 0.26 100.00 537,588.74 0.34
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 14.44 14.44 100.00 306,575.64 0.20
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 4.02 4.02 100.00 1,318,081.62 0.84
Jumlah 30,912,925.60 19.78 30,912,925.60 19.78
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 3.66 3.66 100.00 9,154,175.11 5.86
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 3.98 3.98 100.00 9,954,540.15 6.37
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 26.15 26.15 100.00 55,464,867.82 35.49
Jumlah 74,573,583.07 47.72 74,573,583.07 47.72
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 38.72 38.72 100.00 6,953,686.08 4.45
Jumlah 6,953,686.08 4.45 6,953,686.08 4.45
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 77.44 77.44 100.00 6,788,003.20 4.34
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 1.12 1.12 100.00 1,680,000.00 1.07
Jumlah 8,468,003.20 5.42 8,468,003.20 5.42
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 5.70 5.70 100.00 1,959,950.70 1.25
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 40.00 40.00 100.00 3,400,000.00 2.18
Jumlah 5,359,950.70 3.43 5,359,950.70 3.43
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 145.50 145.50 100.00 12,241,933.50 7.83
Jumlah 12,241,933.50 7.83 12,241,933.50 7.83
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 1.00 1.00 100.00 1,000,000.00 0.64
Jumlah 1,000,000.00 0.64 1,000,000.00 0.64
LAPORAN MINGGUAN
PERIODE
07 Agustus 2023 s/d 14 Agustus 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
15 Agustus 2023 s/d 22 Agustus 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
23 Agustus 2023 s/d 30 Agustus 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
31 Agustus 2023 s/d 07 September 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
08 September 2023 s/d 15 September 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
16 September 2023 s/d 23 September 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
24 September 2023 s/d 01 Oktober 2023
Penyedia Jasa :
LAPORAN MINGGUAN
PERIODE
02 Oktober 2023 s/d 09 Oktober 2023
Penyedia Jasa :
LAPORAN LAPORAN
PERIODE
07 Agustus 2023 s/d 07 September 2023
Penyedia Jasa :
LAPORAN LAPORAN
PERIODE
08 September 2023 s/d 09 Oktober 2023
Penyedia Jasa :
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 5
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 8-Sep-23 s/d 15-Sep-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 15.35 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 11.70 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 27.05 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 0.84 0.84 100.00 1,736,825.16 1.11
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 80.20 80.20 100.00 1,702,726.20 1.09
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 29.72 29.72 100.00 630,985.32 0.40
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 13.40 13.40 100.00 4,302,485.40 2.75
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 0.23 0.23 100.00 475,559.27 0.30
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 13.06 13.06 100.00 277,276.86 0.18
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 3.48 3.48 100.00 1,141,025.88 0.73
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 - - - -
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 - - - -
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 - - - -
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 - - - -
Jumlah 30,912,925.60 19.78 18,545,874.82 11.87
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 38.72 38.72 100.00 6,953,686.08 4.45
Jumlah 6,953,686.08 4.45 6,953,686.08 4.45
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 - - - -
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 - - - -
Jumlah 8,468,003.20 5.42 - -
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 - - - -
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 - - - -
Jumlah 5,359,950.70 3.43 - -
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 6
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 16-Sep-23 s/d 23-Sep-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 27.05 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 10.91 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 37.96 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 0.84 0.84 100.00 1,736,825.16 1.11
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 80.20 80.20 100.00 1,702,726.20 1.09
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 29.72 29.72 100.00 630,985.32 0.40
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 13.40 13.40 100.00 4,302,485.40 2.75
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 0.23 0.23 100.00 475,559.27 0.30
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 13.06 13.06 100.00 277,276.86 0.18
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 3.48 3.48 100.00 1,141,025.88 0.73
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 0.26 0.26 100.00 537,588.74 0.34
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 14.44 14.44 100.00 306,575.64 0.20
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 4.02 4.02 100.00 1,318,081.62 0.84
Jumlah 30,912,925.60 19.78 21,773,917.02 13.93
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 38.72 38.72 100.00 6,953,686.08 4.45
Jumlah 6,953,686.08 4.45 6,953,686.08 4.45
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 77.44 77.44 100.00 6,788,003.20 4.34
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 1.12 1.12 100.00 1,680,000.00 1.07
Jumlah 8,468,003.20 5.42 8,468,003.20 5.42
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 5.70 5.70 100.00 1,959,950.70 1.25
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 40.00 40.00 100.00 3,400,000.00 2.18
Jumlah 5,359,950.70 3.43 5,359,950.70 3.43
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 - - - -
Jumlah 12,241,933.50 7.83 - -
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 7
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 24-Sep-23 s/d 1-Oct-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 37.96 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 7.83 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 45.79 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 - - - -
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 0.84 0.84 100.00 1,736,825.16 1.11
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 80.20 80.20 100.00 1,702,726.20 1.09
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 29.72 29.72 100.00 630,985.32 0.40
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 13.40 13.40 100.00 4,302,485.40 2.75
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 0.23 0.23 100.00 475,559.27 0.30
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 13.06 13.06 100.00 277,276.86 0.18
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 3.48 3.48 100.00 1,141,025.88 0.73
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 0.26 0.26 100.00 537,588.74 0.34
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 14.44 14.44 100.00 306,575.64 0.20
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 4.02 4.02 100.00 1,318,081.62 0.84
Jumlah 30,912,925.60 19.78 21,773,917.02 13.93
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 - - - -
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 - - - -
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 - - - -
Jumlah 74,573,583.07 47.72 - -
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 38.72 38.72 100.00 6,953,686.08 4.45
Jumlah 6,953,686.08 4.45 6,953,686.08 4.45
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 77.44 77.44 100.00 6,788,003.20 4.34
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 1.12 1.12 100.00 1,680,000.00 1.07
Jumlah 8,468,003.20 5.42 8,468,003.20 5.42
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 5.70 5.70 100.00 1,959,950.70 1.25
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 40.00 40.00 100.00 3,400,000.00 2.18
Jumlah 5,359,950.70 3.43 5,359,950.70 3.43
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 145.50 145.50 100.00 12,241,933.50 7.83
Jumlah 12,241,933.50 7.83 12,241,933.50 7.83
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 - - - -
Jumlah 1,000,000.00 0.64 - -
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023 MINGGU KE : 8
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 2-Oct-23 s/d 9-Oct-23
NILAI KONTRAK : Rp 171,907,272.00 PROGRES MINGGU LALU : 45.79 %
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA PROGRES MINGGU INI : 54.21 %
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D MINGGU INI : 100.00 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN S/D
BOBOT MINGGU MINGGU BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA MINGGU
(%) LALU INI PEKERJAAN (Rp) PEKERJAAN
INI
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 4.42 4.42 100.00 9,139,008.58 5.85
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 0.84 0.84 100.00 1,736,825.16 1.11
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 80.20 80.20 100.00 1,702,726.20 1.09
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 29.72 29.72 100.00 630,985.32 0.40
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 13.40 13.40 100.00 4,302,485.40 2.75
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 0.23 0.23 100.00 475,559.27 0.30
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 13.06 13.06 100.00 277,276.86 0.18
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 3.48 3.48 100.00 1,141,025.88 0.73
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 0.26 0.26 100.00 537,588.74 0.34
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 14.44 14.44 100.00 306,575.64 0.20
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 4.02 4.02 100.00 1,318,081.62 0.84
Jumlah 30,912,925.60 19.78 30,912,925.60 19.78
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 3.66 3.66 100.00 9,154,175.11 5.86
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 3.98 3.98 100.00 9,954,540.15 6.37
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 26.15 26.15 100.00 55,464,867.82 35.49
Jumlah 74,573,583.07 47.72 74,573,583.07 47.72
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 38.72 38.72 100.00 6,953,686.08 4.45
Jumlah 6,953,686.08 4.45 6,953,686.08 4.45
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 77.44 77.44 100.00 6,788,003.20 4.34
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 1.12 1.12 100.00 1,680,000.00 1.07
Jumlah 8,468,003.20 5.42 8,468,003.20 5.42
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 5.70 5.70 100.00 1,959,950.70 1.25
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 40.00 40.00 100.00 3,400,000.00 2.18
Jumlah 5,359,950.70 3.43 5,359,950.70 3.43
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 145.50 145.50 100.00 12,241,933.50 7.83
Jumlah 12,241,933.50 7.83 12,241,933.50 7.83
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 1.00 1.00 100.00 1,000,000.00 0.64
Jumlah 1,000,000.00 0.64 1,000,000.00 0.64
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK : 02/SPK/PL.09/KONST/CK-PSU/2023
TANGGAL KONTRAK : 07 AGUSTUS 2023 PERIODE : 7-Aug-23 s/d 9-Oct-23
NILAI KONTRAK : Rp 171,907,272.00
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT PROGRESS S/D SAAT INI : 100.00 %
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
KONTRAK AWAL VOLUME PEKERJAAN REALISASI PEKERJAAN
HARGA JUMLAH TERHADAP TERHADAP
NO URAIAN PEKERJAAN BOBOT S/D SAAT BBAGIAN JUMLAH HARGA TOTAL
VOL. SAT. ANALISA SATUAN HARGA SAAT LALU SAAT INI
(%) INI PEKERJAAN (Rp) PEKERJAAN
(Rp) (Rp) (%) (%)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
DIVISI I : PERSIAPAN LAPANGAN/ SITEWORK
1.1.1. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 450,000.00 450,000.00 0.29 1.00 1.00 100.00 450,000.00 0.29
3 Papan Nama Proyek 1.00 Bh Taksir 300,000.00 300,000.00 0.19 1.00 1.00 100.00 300,000.00 0.19
Jumlah 1,200,000.00 0.77 1,200,000.00 0.77
1.5.1. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 11.12 M3 1.7.1.a.(c) 112,646.00 1,252,623.52 0.80 11.12 11.12 100.00 1,252,623.52 0.80
2 Urugan Kembali Bekas Galian Tanah 3.71 M3 1.7.2.a.(c) 79,499.00 294,941.29 0.19 3.71 3.71 100.00 294,941.29 0.19
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 1.01 M3 1.7.2.d.(c) 200,322.99 202,326.22 0.13 1.01 1.01 100.00 202,326.22 0.13
Jumlah 1,749,891.03 1.12 1,749,891.03 1.12
DIVISI 2 : PENERAPAN SMKK
2.1.1. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 2,634,400.00 2,634,400.00 1.69 1.00 1.00 100.00 2,634,400.00 1.69
Jumlah 2,634,400.00 1.69 2,634,400.00 1.69
DIVISI 3 : PEKERJAAN STRUKTURAL
3.1 PEKERJAAN STRUKTUR BAWAH
3.1.1. PEKERJAAN PONDASI
1 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 11.000 M3 2.1.1.b.(a) 1,016,815.00 11,184,965.00 7.16 11.00 11.00 100.00 11,184,965.00 7.16
Jumlah 11,184,965.00 7.16 11,184,965.00 7.16
3.2 PEKERJAAN STRUKTUR ATAS
3.2.1. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) Untuk Berem jalan Sisi Pagar 4.42 M3 2.2.2.1.i.(a) 2,067,649.00 9,139,008.58 5.85 4.42 4.42 100.00 9,139,008.58 5.85
2 Pekerjaan Beton Sloof (SL1) Uk. 13/15 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.28 M3 2.2.2.1.i.(a) 2,067,649.00 578,941.72 0.37 0.28 0.28 100.00 578,941.72 0.37
- Pembesian Dengan Besi Polos Ø 12 mm 52.15 Kg 2.2.6.1.b.(c) 21,231.00 1,107,196.65 0.71 52.15 52.15 100.00 1,107,196.65 0.71
- Sengkang Besi Polos Ø 8 mm 15.75 Kg 2.2.6.1.b.(c) 21,231.00 334,388.25 0.21 15.75 15.75 100.00 334,388.25 0.21
- Pemasangan 1 m2 Bekisting Untuk Sloof 4.35 M2 A.4.1.1.19. 218,514.00 950,535.90 0.61 4.35 4.35 100.00 950,535.90 0.61
3 Pekerjaan Beton Sloof (SL2) Uk. 15/20 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.43 M3 2.2.2.1.i.(a) 2,067,649.00 889,089.07 0.57 0.43 0.43 100.00 889,089.07 0.57
- Pembesian Dengan Besi Polos Ø 12 mm 78.22 Kg 2.2.6.1.b.(c) 21,231.00 1,660,688.82 1.06 78.22 78.22 100.00 1,660,688.82 1.06
- Sengkang Besi Polos Ø 8 mm 20.84 Kg 2.2.6.1.b.(c) 21,231.00 442,454.04 0.28 20.84 20.84 100.00 442,454.04 0.28
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.72 M2 A.4.1.1.19. 218,514.00 1,249,900.08 0.80 5.72 5.72 100.00 1,249,900.08 0.80
4 Pekerjaan Beton Kolom Uk. 25/25 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.84 M3 2.2.2.1.i.(a) 2,067,649.00 1,736,825.16 1.11 0.84 0.84 100.00 1,736,825.16 1.11
- Pembesian Dengan Besi Polos Ø 12 mm 80.20 Kg 2.2.6.1.b.(c) 21,231.00 1,702,726.20 1.09 80.20 80.20 100.00 1,702,726.20 1.09
- Sengkang Besi Polos Ø 8 mm 29.72 Kg 2.2.6.1.b.(c) 21,231.00 630,985.32 0.40 29.72 29.72 100.00 630,985.32 0.40
- Pemasangan 1 m2 Bekisting Untuk Kolom 13.40 M2 A.4.1.1.20. 321,081.00 4,302,485.40 2.75 13.40 13.40 100.00 4,302,485.40 2.75
5 Pekerjaan Beton Ringbalk (RB1) Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.23 M3 2.2.2.1.i.(a) 2,067,649.00 475,559.27 0.30 0.23 0.23 100.00 475,559.27 0.30
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 13.06 Kg 2.2.6.1.b.(c) 21,231.00 277,276.86 0.18 13.06 13.06 100.00 277,276.86 0.18
- Pemasangan 1 m2 Bekisting Untuk Balok 3.48 M2 A.4.1.1.21. 327,881.00 1,141,025.88 0.73 3.48 3.48 100.00 1,141,025.88 0.73
6 Pekerjaan Beton Ringbalk (RB2) Uk. 15/13 cm
- Membuat 1 m3 Beton Mutu f'c = 16,9 MPa (K-200) 0.26 M3 2.2.2.1.i.(a) 2,067,649.00 537,588.74 0.34 0.26 0.26 100.00 537,588.74 0.34
- Pembesian Dengan Besi Polos Ø 12 mm 50.20 Kg 2.2.6.1.b.(c) 21,231.00 1,065,796.20 0.68 50.20 50.20 100.00 1,065,796.20 0.68
- Sengkang Besi Polos Ø 8 mm 14.44 Kg 2.2.6.1.b.(c) 21,231.00 306,575.64 0.20 14.44 14.44 100.00 306,575.64 0.20
- Pemasangan 1 m2 Bekisting Untuk Balok 4.02 M2 A.4.1.1.21. 327,881.00 1,318,081.62 0.84 4.02 4.02 100.00 1,318,081.62 0.84
Jumlah 30,912,925.60 19.78 30,912,925.60 19.78
DIVISI 4 : PEKERJAAN ARSITEKTUR
4.2.1. PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan Pintu (P1) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.66 M Taksir 2,501,140.74 9,154,175.11 5.86 3.66 3.66 100.00 9,154,175.11 5.86
2 Pemasangan Pintu (P2) Hollow Steinless Steel + Accessories Lengkap Dipasang 3.98 M Taksir 2,501,140.74 9,954,540.15 6.37 3.98 3.98 100.00 9,954,540.15 6.37
3 Pemasangan Railling Pagar Hollow Steinless Steel + Accessories Lengkap Dipasang 26.15 M Taksir 2,121,027.45 55,464,867.82 35.49 26.15 26.15 100.00 55,464,867.82 35.49
Jumlah 74,573,583.07 47.72 74,573,583.07 47.72
4.4.1. PEKERJAAN DINDING PASANGAN
1 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 38.72 M2 A.4.4.1.9. 179,589.00 6,953,686.08 4.45 38.72 38.72 100.00 6,953,686.08 4.45
Jumlah 6,953,686.08 4.45 6,953,686.08 4.45
4.4.2. PEKERJAAN PLASTERAN
1 Plasteran Dinding Campuran 1 PC : 4 PP tebal 15 mm 77.44 M2 3.2.2.(c). 87,655.00 6,788,003.20 4.34 77.44 77.44 100.00 6,788,003.20 4.34
2 Relief Kepala Kolom Pagar 1.12 M2 Taksir 1,500,000.00 1,680,000.00 1.07 1.12 1.12 100.00 1,680,000.00 1.07
Jumlah 8,468,003.20 5.42 8,468,003.20 5.42
4.4.3. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Batu Alam 5.70 M2 A.4.4.3.57. 343,851.00 1,959,950.70 1.25 5.70 5.70 100.00 1,959,950.70 1.25
2 Pemasangan Lobang Angin Pagar Uk. 35 x 15 cm 40.00 Unit Taksir 85,000.00 3,400,000.00 2.18 40.00 40.00 100.00 3,400,000.00 2.18
Jumlah 5,359,950.70 3.43 5,359,950.70 3.43
4.7.1. PEKERJAAN PENGECATAN
1 Pengecatan Tembok Pagar Dulux Weathershield 145.50 M2 3.3.10.(c).a 84,137.00 12,241,933.50 7.83 145.50 145.50 100.00 12,241,933.50 7.83
Jumlah 12,241,933.50 7.83 12,241,933.50 7.83
DIVISI 10 : PEKERJAAN LAIN - LAIN/ MISCELLANEOUS WORK
10.3.1 CONVEYING EQUIPMENT
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 1,000,000.00 1,000,000.00 0.64 1.00 1.00 100.00 1,000,000.00 0.64
Jumlah 1,000,000.00 0.64 1,000,000.00 0.64
LUQMANULHAKIM, S.T., M. T SAWIDAR, S. T., M. T RIZQY KURNIAWAN ABDUL MAJID JUNAIDI USMIN
Pembina Utama Muda NIP. 19800919 200504 1 001 NIP. 19831208 200801 1 001 Inspector Direktur
NIP. 19691024 199903 1 012
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI
SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK ADD.I : 02/SPK/PL.09/KONST/CK-PSU/2023
TANGGAL KONTRAK ADD.I : 07 AGUSTUS 2023
NILAI KONTRAK : Rp 171,907,272.00
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
Kondisi Lapangan
Sebelum Pekerjaan Dimulai
Kondisi Lapangan
Sebelum Pekerjaan Dimulai
Kondisi Lapangan
Sebelum Pekerjaan Dimulai
Kondisi Lapangan
Sebelum Pekerjaan Dimulai
NAMA PEKERJAAN : PEMBANGUNAN PAGAR TPA/POS YANDU KEJAKSAAN NEGERI
SABANG JR. KERAMAT GP. IE MEULEE
NO. KONTRAK ADD.I : 02/SPK/PL.09/KONST/CK-PSU/2023
TANGGAL KONTRAK ADD.I : 07 AGUSTUS 2023
NILAI KONTRAK : Rp 171,907,272.00
KONTRAKTOR PELAKSANA : CV. GLOBAL INDAH JAYA
KONSULTAN PENGAWAS : CV. BATOR ACEH CONSULTANT
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023
Mengetahui : Menyetujui :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Pengguna Anggaran (PA)
DINAS PEKERJAAN UMUM DAN KEPALA DINAS PEKERJAAN UMUM DAN
PERUMAHAN RAKYAT PERUMAHAN RAKYAT
KOTA SABANG KOTA SABANG
HARGA JUMLAH
SATUA UPAH BAHAN
NO. URAIAN PEKERJAAN DAN ANALISA SATUAN ALAT (Rp.) HARGA
N (Rp.) (Rp.)
(Rp.) (Rp.)
1.00 M2 Plafond PVC Type Drain Gloss White (PL. 06.061) #REF! #REF! #REF!
8mm x 20 cm
1.00 M2 Jasa Pasang termasuk rangka metal furing dan asesoris 35,500.00 34,000.00 69,500.00
JUMLAH #REF!
OVERHEAT DAN PROFIT (10%) #REF!
JUMLAH TOTAL #REF!
1.00 M' List Plafond PVC Type Minimalis White (LS. 302) 35,000.00 35,000.00 35,000.00
Lebar 3 cm
1.00 M' Jasa Pasang termasuk asesoris (30% harga bahan) 10,500.00 10,500.00 10,500.00
JUMLAH 45,500.00
OVERHEAT DAN PROFIT (12,5%) 5,687.50
JUMLAH TOTAL 51,187.50
GRAND TOTAL #REF!
DIBULATKAN #REF!