Report No.

WOOD-CPDP24-PI-FA01-005-004
:

Date: 07 February 2024


DAILY PAINTING INSPECTION REPORT :

Page: 01

Project Name : OFFSHORE FACILITIES REJUVINATION PROJECT WOOD Document No: 1000-373-0000-PLN-044 Rev 1

Client : BSP Contract No: 14021029


CLIMATIC CONDITION TO WORK AREA CONDITION OF STEEL PRIOR TO BLASTING SURFACE PREPARATION

Time ( to write reading at the beginning of work and every 3 hours ) SURFACE PROFILE (PRESS "O" FILM ) Required Actual

06 Feb 2024 07 Feb 2024 07 Feb 2024


ISO St 3 ISO St 3
Time 13:42:40 hrs 09:49:51 hrs 16:18:51 hrs
1st Coat Final Coat Final Coat
SURFACE PROFILE
Dry Bulb 34.2 28.8 32.3 N/A Required Actual
Wet Bulb 28.4 25.5 28.6 N/A
Rel.Humidity 65 75 75 SALT CONTAMINATION TEST
Steel temp 31.9 29 33 Required Actual
Dew Point 26.3 23.9 27.2 Type of Abrasive : Power tool/Sanding/Sand Paper Batch NO : N/A N/A

Weather Clear Clear Clear Grade of Steel : Carbon Steel Size : Fine Grit 180 Dust Level: ISO 8502-3 Rating 1
PAINTING
Batch No WFT DFT ( Micron)
No. Of Coat Brand Name Type Paint Color Thinning Application Method
Part A Part B ( Micron) Min Max Avg
1st Coat Jotun Barrier 2796718-1 2774815-1 Grey No.17 Brush / Roller 141 88 96 92
2nd Coat Jotun Jotacote Universal 3090171-1 2904385-1 Buff No.17 Brush / Roller 173 225 263 244
Final Coat Jotun Hardtop CA 3090166-1 3090167-1 White No.17 Brush / Roller 125 309 321 315
ITEM of PAINTED MATERIAL

ITEM No. Work Pack No. Drawing No. Item Line No/Equiment No

CPDP24-WI-0001 SHT 1 OF 1
1 1029-180-FA01-WPK-005_C1 Painting on Resurfaced Flange area affected by PWHT and Barred Tee 250-WI-6143B-0001
CP.24.D.31.013/001

1. Painting of Resurfaced Flange area affected by PWHT and Barred Tee has been done after cleaning & abrade by Sanding/Sand Paper (Fine Grit-180)
2. Painter's ID: AFW-BP046
REMARKS:

Prepared By: Reviewed By:

Name: Name:

Date: Date: