1. A well is producing at a rate of 700 STB/D from a reservoir which has the following
rock and fluid characteristics:
k = 150 md = 5 cp
h = 30 ft co = 8x10-6 psi-1
= 0.5 % B = 1.2 bbl/STB
rw = 3 in cf = 2x10-6 psi-1
a) After what value of the flowing time is the approximation Ei(-x) ln (1.78 X) valid
for this reservoir? What does this suggest ?
b) What is the pressure drop at the well after flowing for 3 hours?
c) Calculate the pressure gradient at a point 150 ft away from the well after 3 hours of
production.
2. The following data correspond to a reservoir which has only two producer wells. The
distance between the two wells is 1000 ft.
An interference test was run in this system. At the beginning both wells were closed
and stabilized. A pressure recorder with a precision of 0.001 psi was run in well B.
Then well A was opened to produce 100 BOPD. What is the required time for the
perturbation generated in well A to be reach well B?
3. It is desired to estimate the current pressure of a point N located 500 ft north from
another well lying 500 ft east of a north-south flow barrier. The well has produced
230000 STB during one year at a constant rate. Reservoir an fluid properties are:
4. An oil well is producing at a constant flow rate of 450 STB/D from a very large
reservoir. An observation shut-in well is located 500 ft away. Rock and fluid properties
are listed below. Estimate the sandface pressure at both the producing well and the
observation well at the end of two days of production. The initial reservoir pressure is
3600 psia. Other relevant data are:
Observation well
500 ft
Well 1 Well 2
400 ft
5. Two oil wells are producing at constant flow rates of q1 = 300 BPD and q2 = 500 BPD,
respectively, from a very large reservoir. Well 2 is located at 400 ft East away from well
1, as shown in figure 1. An observation shut-in well is located 500 ft North away from
well 1. Rock and fluid properties are listed below.
Estimate the sandface pressure at the producing wells and the pressure drop at the
observation well (shut-in well) at the end of two days of production.
6. If the wells depicted by Figure 2 are placed on production at the same time, compute
the flowing pressure for the three wells after 72 hours of production.
Well 3
r 23
r 13 Well 2
r12
Well 1
Figure 2. Well position for problem 11
7. Two wells A and B located 1000 ft apart in 27 md formation are put into production at
the same time at constant rates of 550 and 1100 BPD, respectively. Additional data:
h = 57 ft = 22 % = 4.5 cp
Pi = 3263 psia ct = 5.15x10-6 psi-1 B = 1.101 br/STB
Well A Well B
N
8. A well is producing at a rate of 400 STB/D from a reservoir which has the following
rock and fluid characteristics:
k = 50 md = 3 cp
h = 30 ft co = 8x10-6 psi-1
= 0.30 B = 1.25 bbl/STB
rw = 6 in cf = 2x10-6 psi-1
a) After what value of the flowing time is the approximation Ei(-x) ln (1.78 X) valid
for this reservoir? What does this suggest ?
b) What is the pressure drop at the well after flowing for 3 hours?
c) Calculate the pressure gradient at a point 150 ft away from the well after 3 hours of
production.
=90°
r 2
r 1 = 500 ft
Fault
Well 2