Post Mortem On ASM NEW E Frame Structure
Most of the thread hole not in a good condition, it will impact during masking process.
28/01/2022 CH Tan get production to rework on this issue.
Rework Process
ASM e-frame Issue at Painting Line Hanging Issue
31/01/2022 Complete all the process and pass to QA block B to verify
04/02/2022 QA send back to Painting and reject based on below photo (All can be rework)
Poor material
condition
Missing Masking Not Tapping bit broke inside the
mention in drawing. Acid and tapping hole Request help
Drawing Issue There are several use zinga spray from production to rework
issue when receive
ASM E-FRAME on 27
Hanging
Issue Feb . This several
issue have been Underpaint Touch up using Need buffing copper plate
As this is new part, the hanging method is can spray Buffing and clean the area
describe details on challenging due to size of the part. There are no
Dimension
Issue below page. jig to hang this part. Due to urgency, our engineer
buy a bolt based on size needed to support the
Rework weight of the part.
process
Pin Hole Buff and touch up Oil Mark Clean and touch up
Receive on 27/01/2022 using can spray using can spray
15/03/2022
Rework Process (cont) Rework Process (cont) ASM Issue at Painting Line
08/02/2022 Part Start Spray and touch up
04/02/2022 Masking 100x100 was not mentioned in the masking
process drawing during masking process stage and not notified until the Putty :
touch up process was already done. Jig only provided during rework Poor material
condition
process.
Masking :
Drawing Issue
Unmasking
Process
First Drawing
Receive on 27/01/2022
Rework Process (cont) Rework Process (cont) Putty : Poor Material Condition
07/02/2022 CH Tan reject the part due 15/02/2022 Putty receive the part
to actual part got different colour from at 6pm. Most of the part got dented
golden sample. and scratches mark.
Unmasking Process
Pinhole
Bubble Dirt
Uneven
Surface
Scratches Bubble