King Faisal Air Academy
alas sh
DAR ALRIVADH
Site Observation Notice (SON) onteocnnerie
ssz245
BSS Joint Venture
46100 / 16130
/2110512023
in reference to the above-mentioned subject and attached Photos,
it has been observed at site that sub-contractor for MERAS is using fabricated extension box as
hown on attached photo therefore contractor is instructed for replace all fabricated extension box
ith approved factory-made material.
[The contractor must conduct a root cause analysis, provide valid justification, and propose corrective
faction to avoid receiving NCR. y
Tawfig Mustafa Signature: (ae Date: 21/05/2023
Consultant Representative
Signature: Date:
THA iliac aea ina
Consultant Representative:
‘Subject to the limitations of the authority vested in the Engineer's Representative (Sit), please comply with the
content ofthis Site Instruction which shall not constitute a Variation fo the Contract sum or Contyaet ton
Sa Sb a he BBM 3 gah 8h a LY AN ya gl hgh hy IN yn 3 ahs ie Saal uO Dt
DAR-KFAA-QMS-QA-FRM-04-R00
HOVAIW TY uv,
SI e0
O,
&,Subject to the limitations of the authority a ease comply with the
‘content ofthis tution which shi n:
Gd Sibi he Si
DAR-KFAA-OMS: