Professional Documents
Culture Documents
BBP Ducab PP 1v1
BBP Ducab PP 1v1
PROJECT IDENTIFICATION
Project Type
Project Name CPI/Project Number
Document History
REVISION HISTORY
Date Document Version Document Author
Revision
Description
02/01/2012 Ducab_Business Draft for Sanjay Mehta
Blueprint_PP_0V1 customer review
08/01/2012 Ducab_Business Draft for Sanjay Mehta
Blueprint_PP_0V2 customer review
10/01/2012 Ducab_Business Draft 1 for SAP Sanjay Mehta
Blueprint_PP_0V3 review.
15/01/2012 Ducab_Business Final Document Sanjay Mehta
Blueprint_PP_1V0 for SAP Review
09/02/2012 Ducab_Business Final Document Sanjay Mehta
Blueprint_PP_1V1 post SAP review
REVIEWED BY
Name Title Date Signature
APPROVED BY
Name Title Date Signature
Document History.......................................................................................................................................1
1.0 Introduction.....................................................................................................................................10
2.0 Management / Executive Summary..............................................................................................10
3.0 Project Charter................................................................................................................................12
4.0 Value Determination.......................................................................................................................12
4.1 Business Objectives and Expected Benefits................................................................................................... 12
4.2 Major Business Pain Points (to achieve business objective)...........................................................................15
4.3 Key Performance Indicators (KPIs)................................................................................................................. 17
5.0 SAP ORGANISATIONAL STRUCTURE.........................................................................................18
5.1 Finance Enterprise Structure........................................................................................................................... 18
5.1.1 Operating Concern.................................................................................................................................. 18
5.1.2 Controlling Area....................................................................................................................................... 18
5.1.3 Company................................................................................................................................................. 18
5.1.4 Company Code....................................................................................................................................... 18
5.1.5 Segment.................................................................................................................................................. 19
5.2 Logistics Enterprise Structure......................................................................................................................... 19
5.2.1 Plant........................................................................................................................................................ 19
5.2.2 Storage Location..................................................................................................................................... 20
5.2.3 Purchasing Organization......................................................................................................................... 21
5.2.4 Sales Organization.................................................................................................................................. 22
5.2.5 Distribution Channel................................................................................................................................ 22
5.2.6 Division.................................................................................................................................................... 23
6.0 Master Data Concept PP................................................................................................................25
6.1 PP-Specific Data In Material Master Record................................................................................................... 25
6.1.1 Purpose................................................................................................................................................... 25
6.1.2 Integration............................................................................................................................................... 25
6.1.3 Features.................................................................................................................................................. 25
6.1.4 Information stored at different levels....................................................................................................... 26
6.1.5 Material types and PP Views to be created per material master type (Not yet approved by business)
26
6.2 Bills of Material (BoM)..................................................................................................................................... 42
6.2.1 Purpose:.................................................................................................................................................. 42
6.2.2 Integration......................................................................................................................................................... 42
6.2.3 Features............................................................................................................................................................ 43
6.2.4 BoM types used................................................................................................................................................ 43
6.3 Work Center.................................................................................................................................................... 45
6.3.1 Integration............................................................................................................................................... 45
6.3.2 Features.................................................................................................................................................. 46
6.4 Routings.......................................................................................................................................................... 47
6.4.1 Purpose................................................................................................................................................... 47
6.4.2 Integration............................................................................................................................................... 47
6.5 Production Versions........................................................................................................................................ 48
6.5.1 Purpose................................................................................................................................................... 48
6.5.2 Integration............................................................................................................................................... 48
6.5.3 Features.................................................................................................................................................. 48
6.6 Documents...................................................................................................................................................... 49
6.6.1 Purpose................................................................................................................................................... 49
6.6.2 Integration............................................................................................................................................... 49
6.6.3 Features.................................................................................................................................................. 49
6.7 Characteristics................................................................................................................................................ 50
6.7.1 Purpose................................................................................................................................................... 50
The content of this document forms the basis and the guidelines for the subsequent Realization phase.
This document aims to describe the future business solution based on SAP software. Both, IT subjects and
organizational issues that are required to understand the situation, are described in it.
Any additional explanations that are only relevant when the project is in progress are given in the various project
management plan documents, which the project management team will provide on request.
In addition to the power cable plants, Ducab has a Copper Rod Mill and a PVC manufacturing unit. A new Extra
High Voltage (EHV) / High Voltage plant (a joint venture in which Ducab holds 50% stake) is ready to start
production
Ducab’s corporate headquarters are in Jebel Ali, where all the central functions like QM, Commercial, Purchase,
HR, Sales and Information Technology is based.
Ducab has 4 manufacturing plants within UAE, with total production of approximately 120,000 copper tonnes per
year.
Information Technology plays a strategic role in Ducab’s overall Business strategy. The IT systems need to play
important role in making operational support system very efficient and effective. With this vision, the company is
implementing state-of-the-art ERP package, SAPECC 6.0 with IS-Mill, APO and BW. The modules needs to be
implemented are: SD, MM, QM, FI, CO, PP with APO, HR – Organization structure, ABAP, Workflow, DMS &
integration with Advaris Cable Design Software and Trinity Hedging Software will be done via development of
interface
BBP for PP module covers in details, Ducab business, which is currently involved in manufacturing and distribution
of cables& accessories, PVC and copper rods. Manufacturing facilities at Jebel Ali, Mussaffah Unit 1 & Unit 2, and
Ducab HV unit in Jebel Ali are to be part of the scope.
Standard SAP PPmodule would be used in the all the above mentioned locations for Ducab business.
This document summarizes the findings of the Fujitsu consulting team and Ducab Core Team, with respect to SAP
PP module to be implemented in Ducab.
Reference Documents
The following describes the foundations of the project work that affected the initial designs and concepts of the
project. The information here is a selection of the most important information. The complete information is available
on the shared project file server at \\dxbfp01\Shared_dubaifp01\Al Taawun\Project Al Taawun
Ducab Project
Charter V1.1.docx
To match physical - Currently the WIP is Junaid Siddiqi Tangible/Intangible - Clubbing the
stock in WIP with a black box and Abdullah E. production of
system stock production Doukhei semi finished
goods against
information is not Samih Zamzam
orders will help
available at individual improve visibility
length level, it is of WIP and
available at order reduce manual
level intervention
- Standalone system - quicker
used for tracking of response in case
semi-finished goods any discrepancy
found in WIP
up to insulation stage
- Production
and the system is not information will
interfaced with BaaN be available at
batch level
Manufacturing
1 Production results not accurate in some High Junaid Siddiqi
cases and definitely they don’t reflect Abdullah E.
any live data capture. Doukhei
Samih Zamzam
2 WIP stock count procedure and accuracy High Junaid Siddiqi
(Long time to get results). Abdullah E.
Doukhei
Samih Zamzam
3 Scrap accounting per machine/ per High Junaid Siddiqi
order/ per customer. Abdullah E.
Doukhei
Samih Zamzam
4 Capturing machine time sheet manually. High Junaid Siddiqi
Abdullah E.
Doukhei
Samih Zamzam
5 Manual calculation of wire drawing High Junaid Siddiqi
program Abdullah E.
Doukhei
Samih Zamzam
6 Not possible to associate any special High Junaid Siddiqi
material to special orders Abdullah E.
Doukhei
Samih Zamzam
7 No real time inventory link between High Junaid Siddiqi
actual raw material movement and BAAN Abdullah E.
System. Doukhei
Samih Zamzam
8 Fault Cards system (FC) isn’t linked at all High Junaid Siddiqi
with our Baan system. Abdullah E.
Doukhei
Samih Zamzam
9 Any details can be seen after Short High Junaid Siddiqi
Length BTS only, since the remarks are Abdullah E.
manually entered after extracting them Doukhei
from the quality system. Samih Zamzam
The operating concern is an organizational unit in accounting which structures enterprise from the Profitability Analysis point of
view.
Operating Description
Concern Code
1000 Ducab Operating Concern
A controlling area in SAP is the organizational unit within an institution, used to represent a closed system for cost accounting
purposes. A controlling area may include one or more company codes which must use the same operative chart of accounts as
the controlling area.
Proposal: DUCAB (all Company Codes) will use single Controlling Area.
5.1.3 Company
A company is an organizational unit in Accounting which represents a business organization according to the requirements of
commercial law in a particular country. A company can consist of one or more company codes.
Company Description
1000 Ducab Cable
2000 HV Cable
3000 JVIC
Company code is the highest organizational unit for which a complete self-contained set of accounts can be drawn up for
purposes of external reporting.
The process of external reporting involves recording all relevant transactions and generating all supporting documents required
for financial statements (balance sheets, profit and loss statements and so on.)
Outwardly, a business organization can take the form of a single legal entity (a company) or as a group of several legal entities
(corporate group).
Proposal: Company code & company is having one to one relation. Following company codes are
proposed for Dubai Cable.
5.1.5 Segment
Segment is division of a company for which you can create financial statements for external reporting.
The accounting principles US GAAP and IFRS require companies to perform segment reporting.
Segment Description
Code
CABLE Cable
METAL Metal
SERVI Services
We can track Inventory Movement & Valuation at each Plant level separately.
Naming Convention: The Coding logic is all the Plant Code falling under a Company Code will start with
the initials digit of the Co. Code & followed by the Increments of hundred. (1 st digit = 1st digit of Company
Code and Next 3 digit = Increment of 100).
Storage locations are sub units under a Plant. A storage location is the place where stock is physically kept
within a plant. A storage location has multiple attributes; There may be one or more storage locations within
a plant. A storage location has a description and at least one address. It is possible to store material data
specific to a storage location. Stocks are managed only on a quantity basis and not on a value basis at
storage location level. Physical inventories are carried out at storage location level. Storage locations are
always created for a plant.
Naming
Convention: Storage locations falling under a Plant will start with the initial two digits of the Plant & followed
by the serial number. (1st two digit = 1st two digit of Plant & Next 2 digit = serial number, Increment of 1).
A purchasing organization in SAP procures materials and services, negotiates conditions of purchase with
vendors, and bears responsibility for such transactions.
The form of procurement is specified through the assignment of purchasing organizations to company codes
and plants.
Naming Convention: The Purchasing Organization which served for all plants under a company code will
follow the Company Code logic.
The sales organization represents the selling unit in the legal sense. It is responsible for example - for product
liability and other rights of recourse; customer deliveries; business partner contacts; and direct mailing
campaigns. It also helps you to offset business operations internally.
Naming Convention: The Sales Organization which serve for a Company Code, start with the initials of the
Co Code & followed by the Increment of 100 (1 st digit = 1st digit of Company Code and Next 3 digit = Increment
of 100)
The distribution channel determines how materials or services are sold and how they are distributed to
customers, for example, retail, wholesale, self-collection.
Naming Convention: The Distribution channel codes follow the serial number.
5.2.6 Division
You can use divisions to organize materials or services, for example to form product groups or lines. The
division establishes responsibility for profits from materials and services.
Each business transaction in Sales and Distribution is linked to a particular division. It is derived from either:
1. Material Master in PP
2. Bills Of Material (BoM)
3. Work-Centers/ Group of Work Centers.
4. Routings
5. Production Versions
6. Characteristics and values
7. Classes and class types
8. Object dependencies, Configuration profiles
9. Documents
6.1.1 Purpose
Production Planning views (Basic Data views, MRP views and Work Scheduling view) in Material Master contains
the general information on material such as drawing number, as well as business critical information for material
requirement planning and shop floor scheduling. Basic data views are maintained at company level, MRP and
work scheduling views are maintained at plant level.
6.1.2 Integration
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migration to understand integration
overview with APO system.
6.1.3 Features
The information in the material master controls the production planning processes throughout the logistics supply
chain. You use the MRP data in the material master to control the machine loading, shop floor scheduling and to
plan procurement process and to define whether a material is to be issued from a specific storage location.
Planning run exception messages can be viewed by a single primary key, such as MRP controller, and plant load
can be viewed by production schedulers.
To control production planning function activities, you can, for example, define the following:
Level View
General Basic data 1, 2
Classification (001, 023, 300)
Cable data ,Reel Data
Additional data: Proportion/Prod. Unit
Sales Org./Distribution Sales: Sales org 1, 2
channel Sales: Sales and Distribution text
Plant Sales: General/Plant
Foreign trade Export
Purchasing
Foreign trade Import
Purchase Order text
MRP 1,2,3,4
Work Scheduling
Quality Management
Accounting 1, 2
Cost estimate 1, 2
Storage location Plant data / Storage 1, 2
Warehouse Warehouse Management 1, 2
6.1.5 Material types and PP Views to be created per material master type (Not yet approved by
business)
MRM1 Mill Reel for Shipping This is for Mill reel material.
Reel (suppled from reel
Materials which have value added and are transformed within the group
plant, purchasing from
(DUCAB). They can be produced internally, subcontracted or purchased
vendor)
through an inter-company flow. It does not include the materials that are
not produced within the sector. Semi-Finished goods and Finished goods
are differentiated by the valuation class
MRM3 Mill Reel for WIP in- This is for Mill reel material.
house production Steel reel and Mild steel reel for in-house production
Materials which have value added and are transformed within the group
FERT Finished products
(DUCAB). They can be produced internally, subcontracted or purchased
through an inter-company flow. It does not include the materials that are
not produced within the sector. Semi-Finished goods and Finished goods
are differentiated by the valuation class.
Trading goods are always procured externally and then sold. A material
HAWA Trading goods
master record of this material type can contain purchasing data and sales
data.
Materials which have value added and are transformed within the group
HALB Semi-finished products
(DUCAB). They can be produced internally, subcontracted or purchased
through an inter-company flow. It does not include the materials that are
not produced within the sector. Semi-Finished goods and Finished goods
are differentiated by the valuation class.
Purchased materials to which no value has been added within the group. It
ROH Raw materials
represents basic elements used and transformed in the manufacturing
process, including then raw materials and bough–out parts. They can be
included in BOMs.
Trading goods are also created with this material type (even if they are not
transformed). These materials are valuated and stored.
DUCAB and Customer owned material (managed in stock but not in value)
LEIH Returnalble packaging
that can be returnable or reusable in multiple logistic cycles and shipped to
the customer or within the sector (DUCAB). They are used in packaging
instructions. Managed in quantity and not valuated.
Services can be performed internally or procured externally (outsourced).
DIEN Services
They cannot be stored or transported.
Operating supplies, replacement parts for production resources and
ERSA Spare parts
consumables for production resources. These materials are managed in
quantity (stored) and are valuated at moving average price. They
INITIAL SCREEN
ORGANIZATION LEVEL
BASIC DATA 1
Controls whether:
Single-unit batches are allowed for a material
The system proposes new batches as single-unit
batches
Goods Receipt Y Y Allowed
to Posted
Allows receipt postings to single-unit batches to
Single-Unit
which materials have already been posted.
Batch Allowed
A single-unit batch has been posted when a goods
receipt has already taken place for this batch. You
can see this from the date of the last goods receipt
in the material master.
The indicator does not allow you to post materials
to single-unit batches that do not already have
stock.
Characteristic Y Y 0.001 lm
Plan value
The planned proportion of the total amount of the
material. This proportion refers to the base unit of
measure or stock-keeping unit.
The planned conversion of a product unit into the
base unit of measure.
MRP1
Base Unit Of
Y Y Refer to the view basic data 1
Measure
MRP Group Y N Group code which drives several planning parameters such as :
. strategy group,
. consumption mode and period of adjustment (backward and
forward)
. horizons (rescheduling, planning, planning time fence)
Lot size Y Y Lot size code determining the quantity of resources created by
planning processes :
EX: lot for lot – a planned order is created for each requirement.
WB : Weekly lot size – a planned order is created using weekly lot
size quantity field,
Minimum Y N Minimum Procurementquantity
Lot Size
Maximum Y N Maximum Procurementquantity
Lot Size
Fixed Lot N N Required, if lot size is "FX"
Size
MRP 2
Prod. stor. Y Y Storage location from where material is issued (by default
location should be set to PPRD).
If the material is a component, it is the issuing storage
location to which a backflush is posted.
If the material is produced, it is the receiving storage location
to which the receipt of the material is posted.
Quota arr. Usage N N
Default supply N N
area
Backflush Y N Not mandatory for all materials. Must be set to "1" for
materials that are managed in BOM as component, and to be
backflushed
Storage loc. for N N Storage location proposal at receipt of external procurement
externalProcurem
ent
JIT delivery N N
schedule
Stock N N
determination
group
Co-Product Y N Check (In case of ‘MCFE, MCHF’)
Indicator you can use to specify that the material can also be
used as a co-product
No Y Y Use “1”
Description Y Y Material Code of product
Apportionment Y Y Name or key uniquely identifying a structure
Structure
S1 DUCAB CO Product structure
Assignment Y Y Key identifying an assignment
MAT Material cost
OPA Operating cost
Co-product Y Y Material number that identifies the co product
Valid-to date Y Y End of validity period of an object (such as material, BOM, or
routing) in the SAP System
Equivalence Y Y The activity types created on the cost center can be weighted
Numbers by assigning equivalence numbers to them. The costs not
dependent on the activity types are then allocated to the
activity types in the cost center based on this weighting.
1 Material cost
2 Operating cost
MRP 3
Strategy group Y N The strategy group groups all the planning strategies
that can be used for a particular material. The planning
strategy represents the procedure used for planning a
material and is (technically speaking) controlled by the
MRP types
"10" – make to stock production (no consumption).
“20” – make to order production.
Consomption mode N N Indicates the way customer requirements will consume
independent requirements (backward, forward or
both).
Consumption modes available are:
1-Backward consumption only;
2-Backward/forward consumption;
3-Forward consumption only;
4-Forward/backward
Backward N N
consumption period
Forward N N
consumption period
Mixed MRP N N
Planning material N N
Planning plant N N
Planning N N
conversion factor
Selection Y N Must be set to 2 only for the materials that will have a production
method version = the manufactured goods. The materials to be planned
in APO must have a production version
Blank for the others.
Component N N
Scrap (%)
Individuel / Y Y Availability
Description
Collective check
"" Individual and collective requirements for MCFE
1 Individual requirements only
2 Collective requirements only for MCHF
Requirements Y N If applicable,
group
MRP Y N
dependent
requirement
Discontinuatio N N
n indicator
Effective-out Y N Date from which follow-up material could be used
date
Follow-up Y N Material that will replace existing part. If effective-out date is over
material and there is no stock anymore on material, follow-up material will
be used instead (effective for planning and production)
Bill of material
Alternative BOM Y Y Key that identifies the valid BOM unambiguously
(standard value “1”).
BOM usage Y Y “1” - Production
Apportionment N N This determines how the costs are distributed to co-
structure products.
Repetitive manufacturing
REM allowed N N
Production line N N
Planning ID N N
Other data
Other header mat. N N
Distribution key N N
WORK SCHEDULING
N N Materials planning
The valid-from date of the material status is considered
only if it precedes or is the same as the planning date; that
is, if the valid-from date is later than the planning date, it is
not considered, even if it is within the planning horizon.
Example
I<-------------Planning horizon------------->I
Valid from -----I--------------------I-----------------------I-->
Planning date Valid-from date Time
In this case, the valid-from date is not considered in
materials planning since it is later than the planning date.
Purchasing
The valid-from date of the material status is checked
against the current date.
6.2.1 Purpose:
A bill of material (BoM) is a structured list of all the components and quantities thereof, required to produce
the material for which a BoM is created. It collects all the data, necessary to define the structure of a
manufactured material for production planning, costing and production execution activities. The data
stored in the bill of material master record will be used by default for many functional transactions and by
many functions such as materials management and costing functions. Though BoM can be created and
managed at a group level, plant specific BoM gives flexibility to users.
Order BOM: A bill of material, which is generated from a material BOM and is modified for a specific sales order.
The material BOM, however, does not change. An order BOM is generated when a material BOM is changed for a
specific order.
An order BOM has the same structure as the material BOM from which it is generated.
A BOM that is created with reference to a specific sales order is described as an order BOM. A sales order
number, a sales order item and a material number uniquely identify an order BOM.
Both material BOMs and order BOMs can be contained in the multi-level BOM for the material that you entered in
a sales order item.
Create an order BOM if work in make-to-order production (MTO) Process and want to respond to special customer
wishes, or if manufacturing a product, which have never before produced in that form. to change one or more
assemblies specific to a particular order, without having to change the material BOM.
Variant BOM: A variant BOM describes different object with high degree of common parts. The variant describes a
specific variant with all the components and there quantities. The variant BOM is used in the case of Variant
configuration which is created at the time of the sales order creation. In make to order with variant configuration
scenario will use the Variant configuration
Depending on usage, different BoMs can be created by different functions.(i.e production BoM, Costing BoM etc)
Usually a production BoM is used for costing the material/product.
A production BoM also can be a basis for calculating material quantity calculations, while providing material to
vendor, in a subcontracting scenario.
In order controlled environment, its a production BoM which gets copied to order document, quantities can be
withdrawn from stores for production order consumption
Following BOM usages which are standard may be used for various Ducab business applications
BOM USAGE:
1) Production:This BOM contains items that are relevant to production. These items are
copied to the planned order. Dependent requirements are generated for them, and
they are copied to the production order.
2) Engineering/Design: This BOM contains items as created by Design without scrap
percentages etc.
3) Universal – N/A to Ducab. Contains items which are generally used by production also
can be used by all other functions.
4) Plant Maintenance - N/A to Ducab
5) Costing- N/A to Ducab
6) Sales & Distribution – This BOM may contain component quantites which are higher /
different than production requirements. Normally used by SD function for customer
purposes.
For Ducab Applications: The BOM which will be created outside the SAP system using advaris or excel can be
migrated to SAP with BOM usage 2, Engineering /design. It may then be copied/modified manually to generate
BOM with usage 1, for production.
Sales& Distribution function of Ducab may choose to copy a design BOM and modify/create a SD specific BOM
with usage 6, which may be used for serving SD purposes.
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migrationto understand integration
overview with APO system.
6.2.3 Features
A BoM of a typical cable product/material differs from a simple BoM used by other generic products. Being a
product handled in lengths, it’s BoM has components managed in length as well. To suit and accomodate the
requirements of cable manufacturing plants, and products thereof, Length calculation data is maintained in BoMs
of length managed materials, which allows easy maintenance of different fixed scraps per product/material (Each
Length, First Length, Last Length), based on legth calculation method to be used (Pass on Length, Full Reel and
Summarized Length). Maximum Prod. Length also can be maintained per material in a BoM. This information then,
is used for calculating requirement quantities by ECC system or APO system.
A Simple BoM/alternate BoM is proposed to be used, for production function’s usage. BoM levels will be
determined for different group of materials, at a later time during realization phase. BoM usages (1 for production,
2 for Engg/Design, 3 for Universal usage, 4 for Plant Maintenance, 5 for SD, 6 for 6 costing application) may be
used by Ducab’s different functions as suitable for their use.
Following table shows the levels of BoM to be created for Ducab products. All the products in the particular product
group will have same BoM levels, as shown in the table below.
C P
Product No. of Wi Cond Conductor Lay-up Jack Armo Jack Rewi
or ai
Group Levels re uctor Assembly Assembly eting uring eting nding
e r
LV 4 1 2 3 4
MV 4 1 2 3 4
HV 5 1 2 3 4 5
SCU 5 1 2 3 4 5
Wiring/
2/3 1 2 3
flex/cord
Bare
wire/Condu 1/2 1 2
ctor
UL spec 2 1 2
6.3.1 Purpose
An organizational unit that defines where and when an operation must be performed.
The work center has an available capacity. The activities performed at or by the work center are valuated by
charge rates, which are determined by cost centers and activity types. Work centers can be:
Machines
People
Production lines
6.3.1Integration
Each work center will be assigned a cost center, for collecting and reporting the costs.
The product costing will be done using the standard values from the routing and formulae in the work center and
the activity prices from the cost center accounting. Using the formulae in the work center the amount of the each
activity is calculated which in turn will be multiplied by the activity prices. Activity and activity types used at Ducab,
will be decided during realization phase
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migration to understand integration
overview with APO system.
Following table shows the activities associated with every work center at Ducab. As SAP system can
accommodate only six activities against a work center, work center 1104 proves to be a problem, as it has
7 activities. Option of creating a dummy work center for accommodating the 7th activity for work center
1104, OR somehow merging 7activities into 6, will be evaluated during realization phase.
6.3.2Features
The work centers are used in other master data, such as routings. Work centers also can be used in work center
hierarchies, to represent group of similar work centers cumulative capacity, for example.
6.4.1 Purpose
Routing is a master data, which contains operations to be carried out to manufacture a material. This information is
used in transactions in production planning, capacity evaluation and leveling and also for product costing. Either
material specific routings are created, or materials are assigned to routings. Routings contain information on
production operation steps, work center where the operation takes place alongwith information on activities which
are consumed on a work center.
As for Ducab - The existing routing data in Baan is not accurate or up to date. Fresh data needs to be entered.
As for Machine times – the data shall be collected and entered into SAP system via (Advaris dump and/or Manual
data collection in Excel sheet).
6.4.2 Integration
Routing data is used for costing the products, for assessing the work center load, to provide component
assignment information to plant personnel and also for maintaining the operations done in outside plant
(subcontracting).
Linked with QM,CO modules tightly so that quality operations and product costing is performed using the
information in routing.
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migrationto understand integration
overview with APO system.
6.5.1 Purpose
A production Version is combination of a single BoM and a Routing. Production Versions are used to create
different combinations of BoM and Routings for the same material to be produced.
6.5.2 Integration
PP Master data is sent to planning system APO, using a production version. A production planner may use
different production versions, to differentiate/distinguish alternate production routes, or alternate BoMs or both, for
a material.
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migrationto understand integration
overview with APO system.
6.5.3 Features
Only one BoM and one routing can be used for defining one production version. Prod. Versions can have validity
period. Several production versions can be maintained for a material. A production version is method available, to
maintain route specific details and route specific consumption of components.
Documents, which are required to manufacture a component, also form the part of master data for the
component. For Ex, a drawing can form a part of material master record. (documents can be
managed, using SAP DMS (document management system))
6.6.2 Integration
Documents are firstly created and stored in Document Management Syatem. They are linked to and referred by
the respective master data in SAP system with the reference numbers
6.6.3 Features
Documents may be used, for example, to describe the specifications of a product, or to store inspection
requirements.
6.7.1 Purpose
Characteristics are a set of traits/attributes that are used to describe an object. Value of a Characteristic, specify
these properties such as length, color and voltage for example
Characteristics form part of a class. In other words, group of characteristics become a class.
6.7.2 Integration
6.7.3 Features
Format: Numeric format is for figures, and character format is for alphanumeric characters, for example.
Units of measure for numeric values
Templates for entering values
Required entries for a characteristic (required characteristics)
Whether intervals are allowed as values
Language-dependent descriptions and texts for characteristics and characteristic values
Display options for characteristics on the value assignment screen
Allowed values
The following characteristics, which are provided and recommended for IS-MILL use by SAP, will be used, along
with Ducab specific characteristics
SAP_MILLCA_FACTOR Factor O O O √
SAP_MILLCA_MATNR Material O O √
No
SAP_MILLCA_NO_CUTTING Cutting of O O √ √
Pieces
Additiona O √
SAP_MILLCA_PACK_MAT O
l Packing
Packagin
g
SAP_MILLCA_PACKAGING Materials O O O √ √
, Drum
Material
SAP_MILLCA_PACKAGING_ Drum O O O √ √
CAT type
Packagin
SAP_MILLCA_PACKAGING_ g O √ √
O O
NO Material
Number
SAP_MILLCA_QUANTITY Quantity O O √
Underdeli
very O O √
SAP_MILLCA_TOL_MINUS O
Toleranc
e
O O √
SAP_MILLCA_TOL_PLUS Overdeliv O
ery
SAP_MILLCA_WERKS Plant O √
Please refer to attached document, for additional Ducab specific characteristics and values thereof. Some
or all of Ducab specific characteristics will be used in class type 300. Identification of characteristics to be
added, will be done in early days of realization phase. It is likely that Ducab specific charecteristics and
SAP standard characteristics are similar.A comparision needs to be made and final call needs to be taken
on which charecteristics to be used. It is suggested that SAP charecteristics are copied and then used in
applications so that standard SAP characteristics remain untouched.
Though the Ducab specific classification information, along with variant configuration information is
available on Al Taawun project repository, as suggested by SAP audit team, the same has been brought
into the BBP document. Below sheet shows the definitions for Ducab products. Additions to these values,
if any, which may happen during realization phase, will be maintained in the repository document, for
saving the BBP document from creating versions for every such change..
CS_SET_LENGTH_AP
SAP_MILLCA_LENGTH SAP_MILLCA_LENGTH O
CS_SD_SET_QUANTI
SAP_MILLCA_QUANTITY SAP_MILLCA_PACKAGING TY
SAP_MILLCA_PACKAGING_N CS_MM_SET_QUAN
SAP_MILLCA_TOL_PLUS O TITY
SAP_MILLCA_TOL_MINUS SAP_MILLCA_C_LAGGING CS_REEL_CALC
SAP_MILLCA_VBAP_KWME
NG DC_ENDCAP DC_VARKOND
SAP_MILLCA_APPL_ID DC_PROCESSDRUM_NO
SAP_MILLCA_PACKAGING
SAP_MILLCA_C_LAGGING
SAP_MILLCA_C_PACKAGING
SAP_MILLCA_MATNR
SAP_MILLCA_WERKS
DC_ENDCAP
DC_VARKOND
SAP_MILLCA_LENGTH_MIN
SAP_MILLCA_LENGTH_MAX
BUNDLE_NO NA NA NA
SUPPLIER
PALLET_NUMBER NA NA NA
GRADE
OXYGEN_CONTENT
Legacy System
Legacy System Migration Legacy System Migration Legacy System Migration Migration Work
Work bench Upload Work bench Upload Work bench Upload bench Upload
method. method. method. method.
6.8.1 Purpose
One or more characteristics used to group similar objects together form a class. Classes, characteristics and other
master data, like configuration profiles and object dependencies, together form classification system.
The class type is a central concept in the classification system. The class type determines how classes are
processed, and how objects can be classified and retrieved in these classes. Class types 001, 300, and 200 are
defined for materials. All materials can be classified with class type 001. Class type 300 is for variant configuration.
Class type 200 is for classes that are used as class items in bills of material.
More information on Batch Managemnt and Variant Configuration is available in documents (LO-BM and LO-VC)
provided in appendix. It is suggested to read this documents, for detailed understanding of these solution areas.
Dependencies are used in classification, as an aid to entry for classifying objects. For example, Voltage_11kV can
only be selected for Medium Voltage Cables.
A configuration profile is the place where the material is assigned to the variant class so that the material becomes
configurable.
6.7.5 Features
Using the classification system, SAP users find out the required objects Before classification system can be used,
it is important that classification system is set up as required. There are below three steps necessary, before
classification system can be put to use, for
Defining the properties of an object, using characteristics and classes.
Creating classes for classifying the objects.
Assigning the objects to the classes.
Above completes the classification system and users will be able to use the classification system to find the
objects, using the classification system.
At Ducab, cable design software Advaris is in use for designing new products. Exisiting master data BoMs,
Routings are available in Advaris, which need to be used in SAP, to create SAP master data. A suitable interface
will be built to transfer Advaris data to SAP. Exact mapping of Advaris and SAP fields, complimenting Advaris data
with additional information as required by SAP system, possibility of using defaults values, by adopting logics, are
the activities which will be addressed during realization.
Fact checking of Advaris data is required before they are fed into SAP. Recommend that all the data is reviewed
and cleansed before pushing it into SAP. Also need to know clear steps on editing/append the data once pushed
into SAP.
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migrationto understand integration
overview with APO system.
6.9.1Systems List
Advaris cable design software (version S2)
APO 7.0
SAP DMS
Master Data will be provided by PP System champions/Key users, in the form of excel sheets in the templates
provided by consulting team.
Following upload tools will be used, to upload the data into SAP system -
LSMW and Batch Data Communication (BDC). Depending on the data volume, manual creation of master data will
also be considered.
Material Masters – LSMW
BoM Headers – LSMW
BoM Components - LSMW
Routings complete with inspection characteristics – BDC
Characteristics – LSMW
Characteristics Values – LSMW
Classes – LSMW
Object dependencies – Manual creation
Configuration profiles – Manual creation
Cable design software Advaris, or a customized Excel sheet is used at Ducab, for designing cable products.
Material master firstly be created in SAP system, and then enhanced with master data information from
Advaris/excel.
BoM levels as arrived at this point of time in project, are available in this BBP document, which will be created by
following approach.
A design BoM is created in SAP, using Advaris. This BoM will have no allowances for scrap etc, and will have only
design quantities of components.
Other function like Costing and SD may use either of Design BoM OR Production BoM, or they may choose to
create the BoM suitable for their usage.
Routing information in Advaris is not accurate. This information needs to be cleansed from operations time
perspective only, and then may be used in SAP system to create SAP routing.
Ceartion of production version remains a manual activity, wherein LSMW conversion programs may be used to
create PV in SAP system.
It is strongly recommended that a Master Data Management team be formed at the early stage of realization
phase, which will oversee creation of PP master data in SAP system, transfer of master data to planning system
APO, enhancing of APO master data in APO, and administer changes to any of the master data. The MDM can be
made single point of contact and authority for all activities related to PP master data in ECC and APO systems.
Recommendations from SAP auditors are as follows, towards master data in Ducab,
Define a responsible owner (process expert). Every project team member should know & understand the cable
data models usage and importance.
Class changes after go live are nearly impossible. Only adding characteristics is allowed.
Finalize and freeze the classes and characteristics for SD, PP, MM In order to avoid cross module issues
(Mandatory activity). Reasons: Cross process/ solution usage. Only minor changes of variant configuration and
batch management setup should be done in realization phase. Reasons: a) Later technical changes can be
difficult. b) Project team must start in realization phase with a finalized product group (LV, MV,…) setup.
Characteristic SAP Millca_Factor should not be used in 023 class. (as mentioned in file Ducab_Business Blueprint
SD_Cables & HV_0v3.docx).
Copy the “SAP_*” characteristics to Ducab own version. In SAP name space you cannot do changes.
Define the Ducab specific logic for fix scrap/ allowances. Decide which LPP length calculation master data and
logic will be used.
Following master data will be created manually in SAP phase 1 by fujitsu consultants:
Object Dependencies
ConfigurableMaterial Masters
Configuration Profiles
Please Refer to Business Blue Print APO PPDS/GATP 7.0 High Level Migration to understand integration
overview with APO system.
Below table shows the details of High Level Migration approach, towards Ducab specific objects,
Object
Configurabl Class Class Class Characteristics in Characteristics in Configuration Dependenci
e Material 300 023 001 Class Type 300 Class Type 300 Profile es
CATH
NA NA ODES BUNDLE_NO NA NA NA
SUPPLIER
CR8M
NA NA M PALLET_NUMBER NA NA NA
GRADE
OXYGEN_CONTE
NT
Lega
cy
Legac Legac Syste
y y m
Syste Syste Migr
m m ation
Migra Migra Wor
Legacy tion tion k
System Work Work benc Legacy
Migration bench bench h System
Work Uploa Uploa Uplo Legacy System Legacy System Legacy System Migration
bench d d ad Migration Work Migration Work Migration Work Work bench
Upload meth meth meth bench Upload bench Upload bench Upload Upload
method. od. od. od. method. method. method. method.
Above information on High Level data migration approach at Ducab, is also available on Al Tawun project
repository. The same information has been brought into BBP document, as per SAP auditor’s recommendations.
Transaction data need to be migrated in to SAP from the legacy system using BDC. Following transaction data
would be migrated:
Production Orders
Confirmations Batches with qty and Characteristics values, at GR stage
It is advised to roll back/roll forward the actual manufacturing WIP to the nearest GR stage. It helps to keep the
transaction data to be uploaded to the minimum, resulting in better visibility/clarity to shop floor personnel for
confirming cut-off transactions, post go-live
Following is the advice from SAP auditors, towards transaction data migration. (Post SAP audit)
1. High Level mapping of current master data to LPP Length calculation logic (BAAN
may not have all the related data. In that case, further effort is needed)
2. Data Migration “Open PP orders”, Try to finalize thr open PP orders in the BAAN
system. For LPP materials, start with SD order entering, MRP run, Planned order
transfer to PP orders.
3. 3. Data upload of PP order to ERP does not link the orders in APO to SD orders (in
case of APO LPP setup)
The following table lists the Business Objects that will manually migrated.
MIGRATION OBJECT
ID SAP Business Object Source Application Source Table / File Data Volume
1 NA
2
3
4
5
6
7
8
9
10
PROJECT ROLES
ID Project Role Description
1 Legacy Data Owner Business owner of legacy data. This role could be involved in the data
mapping, creation of manual procedures, performing data entry and
reconciliation.
4 Subject Matter Expert Consulting resource knowledgeable about the specific business object
and application module. This role could be involved in the data mapping
and creation of manual procedures.
5 Migration Analyst Migration team member responsible for supporting the development of
the data migration plan and management of the manual data migration
effort.
PROJECT ROLES
ID Project Role Description
1 Legacy Data Owner Business owner of legacy data. This role could be involved in the data
mapping, creation of manual procedures, performing data entry and
reconciliation.
2 Legacy Analysts Data analysts responsible for the legacy data. This role could be involved
in the data mapping, creation of manual procedures, cleansing of legacy
data, performing data entry and reconciliation.
3 Data Entry Clerk Resource tasked with the entry of manual data.
4 Subject Matter Expert Consulting resource knowledgeable about the specific business object
and application module. This role could be involved in the data mapping
and creation of manual procedures.
5 Migration Analyst Migration team member responsible for supporting the development of
the data migration plan and management of the manual data migration
effort.
The table below contains a mapping of the project roles and the individuals assigned to these roles for each of the business
objects.
PROJECT RESPONSIBILITIES
ID Business Object Project Role Responsible Resource
1 PP Specific Data in Material Master Legacy Data Owner To be decided by business
Legacy Analysts To be decided by business
In an integrated process, sales orders are firstly created in ECC system. Subsequently, GATP check is performed
in APO system. Depending upon the stocks and requirements situation, a planned order will be created for item.
These planned orders will be converted to production order in APO.
While planned orders are converted, availability checks and capacity checks may be performed, details of which
will be available in APO documentation. For ECC system, APO production will become an input for execution to
start. Production orders, are transferred from APO system to ECC system using CIF (Core Interface)
Planner views the production orders for plants and selects the orders to be released to shop floor. There are many
keys available by which selection of orders can be restricted. (Plant, MRP Controller, Production scheduler, Basic
dates, for example)
Planner chooses the orders to be released to floor, and releases the production orders. Releasing the order
creates the load on work centers to be used by production order. Goods (components and raw materials) can be
issued to the released order; batches are created for order header material, if the header material is managed in
batches.
Released production order provides all the necessary information to shop personnel, for them to start execution
and complete the same.
Material/product to be produced and the quantities thereof,(along with product classification including
information maintained at sales order classification)
Components and raw materials to used and quantities thereof,
Operations to be performed along with long text with key operational information i.e. lay lengths, diameter,
number of wires.
Work centers at which the order operations are expected to be carried out,
The basic dates and order schedule dates
Above information which is available on a released order becomes input to shop floor personnel. This information
can be suitably printed. At Ducab core cards, drum cards are the documents which carry above information. Going
forward, SAP released production orders will provide the necessary information for execution. Exact information to
be printed, and format will be decided during realization phase.
Released Production Orders become an input to the shop floor/plant personnel, for them to execute and complete
the tasks as required by production order. The feedback to the system about completion of the production order /
operations is provided through entering the confirmations into the system. Though the confirmations can be either
entered for an entire order or for the operations, it is suggested to enter the confirmations for operations, for
obtaining the details.
PROCESS CHARACTERISTICS
Process Trigger APO created production Order is available in ECC system for execution.
Process Input Production order number and completed operation number for which
confirmation is to be entered, with details of batch/reel on which operation
was performed
Process Output Confirmation with partial/full completion for a production order operation
Process Owner PP
Process Volumes Moderate
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
Process : Material receipts MM Material Munirathnam/
MM_IM_01 and Issues Documents and Mohammed
accounting/
Controlling
documents
Process Planned Order to APO Production Order Milind /
APO Production Order Nouman/Junaid/S
PPDS/GATP 6 conversion in amih/Abdullah
and 7 APO,
Synchronization in
two systems,
Transfer of
transaction data
Process QM_02 For In-process QM QM lots, QM Vivek/Manoj
Inspection process operation
completion
Process 1.7.1.1 FI Document FI FI Document Arvind/Riaz
FI
FB03
Operation Confirmation
Use
In the shop floor confirmation transactions, plant personnel enter the confirmation for operations of production
order. SAP IS-Mill cable solution provides environment, where users can enter all the operation relevant data,
along with Goods Issue batch on which production processes are carried out, on a single screen.
All the components/raw materials consumed during this operation also are entered simultaneously on the same
screen. Operation relevant data, like dates and time, work center where the operation was executed etc are also
entered at the same instance, making it a user friendly transaction.
Following write-up is added to explain the functionality of WIP batches, which may help Ducab in having
traceability of inprocess batches.
(To be used by cable plants for traceability of cable drums during production process. It can also be used by
PVC plant and CRP plant, for maintaining important process parameters, during production process)
A write-up about WIP batch functionality - > to be added to production execution process
WIP Batch:
Ducab will use WIP batch functionality to confirm operations carried out on a particular drum number. This helps
users track the drum information processed at a particular operation.
The work in process Batch is a partial quantity of production order confirmed per operation. WIP batch represent
an intermediate status of a product which is in production. WIP batches may be created for material which is being
produced as a header material of a production order, OR a reference material also can be used(A reference
material can be termed as, early OR preliminary stage of manufacturing of a finished cable). Usage of WIP batch
functionality provides help in terms of confirming batches. A WIP batch is a special type of a batch, which exists
only inside a production order.
It is possible to “Merge” WIP batches or “Split” WIP batches. Reference of a WIP batch with a predecessor batch
(Goods Issue batch) can be created at first operation. WIP batches created during intermediate operations can be
split/merged, and the reference is maintained within WIP batches. A reference of a WIP batch can be created with
a GR batch during confirmation of last operation.
At Ducab, where SAP batches lose their identity during operation confirmation, WIP batch functionality may be
particularly helpful. Lay-up operation, where individual cores are issued to a production order, and assembled to
It should be noted that creation of WIP batches, in accordance with Ducab cable usage, will be a manual activity.
WIP batches will be created manually and if required merged OR split, as required, manually.
1. Batch Management Cockpit: Enter the material and plant, and execute the selection.
2. System shows the material and its batches available in the selected plant
6. System shows the Goods Issue batches as well, from which the WIP batches were generated/created.
A confirmation for production order operation with Reel/Batch details is entered, with relevant material movements
posted through a single screen entry.
All the Ducab cable manufacturing facilities (including HV) will use Time ticket confirmations transaction to enter
confirmation for operations completed. PVC and Copper Rod manufacturing plants as well will use the same
confirmation transactions. While cable manufacturing facilities will use drums/reel/batch/pallet data to confirm reels
processed, Copper Rod Plant will use the GI information screen to provide cathode and scrap batches gone into
processing.
A different confirmation screen can be used by assigning it to the user’s profile, if need arises.
Material master MRP Views, Work Scheduling view, Accounting and Costing views
BoM data
Routing data
Work Center data
PRT Data
Batch information
Refer to KDS sheet for this. Ducab is not planning to integrate MES/SFS with SAP system, during 1st OR 2nd
phases of Al-Taawun SAP implementation project.
Linkage of PP orders in MTS scenario – A Sales Order number OR a higher level production order number can be
entered in lower level production orders, as a characteristics value, for a selected characteristic.
REPORTING
WWRICE Description Report Type Data Relevant Owner
F-ID (ABAP, BI, BOBJ) Element KPI
s
XX-xx- Order information report ABAP Order JS/AED/SZ
R001 enhanced with operation and No, to provide
events details along with Operatio details
reported process parameters n No,
Process
paramet
ers and
Event
details
etc
XX-xx- Report of production orders
R002 committed to be delivered in
current and subsequent week.
Over Due Orders with delay
reasons
XX-xx- Production orders detailed list
R003 – (Due date, customer - etc)
XX-xx- Production Data Analysis
R004
XX-xx- Detailed Job report to execute
R005 the production orders (For all
SFG levels. i.e. Wire Drawing,
core, cable).
XX-xx- Enhancement to pass on ABAP, as
R006 sales order information to suggested by
production orders of all Stefan Haag
levels, in ECC system and Samir
only, in MTS scenario. Damag
9.1.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
EF-ID Method Volumes
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx- NA
C001
XX-xx-
C002
9.1.14 Enhancements
ENHANCEMENTS
WRIC Description Data Object Functional Alternative SAP Reason Owner
EF-ID (Sales Order) Gap Standard
XX-xx- NA
E001
XX-xx-
E002
XX-xx-
E003
OUTPUT / FORMS
WRIC Descrip Data Output Type Frequ Vol Owner
EF-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
XX-xx- NA
O001
XX-xx-
O002
XX-xx-
O003
9.1.16 Workflow
WORKFLOW
WRICE Description Data Object (Sales Engaged Owner
F-ID Order) Parties
XX-xx- NA
W001
XX-xx-
W002
XX-xx-
W003
9.1.17 Authorization
AUTHORIZATIONS
ID Authorization Role Data Objects Reason # of
(Sales Order em
/ TA code) plo
yee
s
A0 To View order Production Production To view and find -
01 operator/su Order/CO03/ the relevant
pervisor MD04/ order
COOIS
A0 To enter Production Confirmation To Enter -
02 confirmation operator/su number / confirmation for
for operation pervisor Order the order
number/ operation
CO11N
A0 Goods Production MIGO/ To perform -
03 Issue/Goods operator/su CO11N/ goods
Receipt pervisor MB1A/MB1C movements
A0 Stock Production MMBE To view the
04 Overview operator/su stocks
pervisor
WIP stock count Standard (Real time WIP report in APO, with
procedure and operation wise details)
accuracy (Long time to
get results
Capturing machine Development, to suit the exact business
time sheet/events requirement
manually
Fault cards (FC) Standard (Quality operations confirmation and
system isn’t linked at subsequent management of LOT UD)
all with our BAAN
system
Sub assembly items Standard (Status on UD of every copper
with FC aren’t easily coil/drum,/batch/reel/pallet available in SAP
traceable in the BAAN system)
system, hence
planners don’t get a
clear understanding of
the status of the
production ID
Linkage of PP orders in MTS scenario – A Sales Order number OR a higher level production order number can be
entered in lower level production orders, as a characteristics value, for a selected characteristic.
Broadly, there are three kinds of products which are manufactured at Ducab manufacturing facilities at
Jebel Ali and Musaffah Abu Dhabi locations, from SAP goods movement perspective. These include,
PVC products
Copper Rod product
Cable Product
Each of the above product line has a different manufacturing process, and so is the goods issue process.
Copper Rods manufacturing processes and PVC processes are relatively straight forward processes from
Goods issue perspective, wherein produced material has a simple Bill of Material, which gets consumed
in a single manufacturing step and an output material is generated. Issued quantities are determined by
knowing final output/produced material quantities.
Though the back flush way of goods issue can be used at Copper rod manufacturing plants, for issuing
raw materials to Copper Rod production orders as well, keeping in mind the high value of raw materials
issued (Copper Cathode/copper scrap) it is recommended to use “ Planned Goods Issue (PGI)” for
Copper Rods production orders.
Traceability is another requirement which makes copper cathodes to be handled in batches, wherein each
bundle, which has a unique number provided by manufacturer, will be treated as a batch and batches will
be issued to Copper Rod Production Orders, using PGI method, using transaction MB1A. Each copper
cathode bundle is recommended to be weighed, before changing to the furnace. Copper Scrap received
from cable manufacturing plants OR scrap procured from other sources will also will handled in batches
and will be issued to copper rod production orders, in PGI way, same as the copper cathode batches.
This will provide exact quantities charged to furnace, for a production order. It is critical that copper
cathodes are handled in batches, each bundle of cathode to be treated as a batch, and each bundle to be
weighed, so that bundle weight/batch quantity is validated before charging to the furnace. Process water,
Alcohol, lubrication materials and other consumed materials can be issued using “back flush” method of
goods issue.
Cable products are manufactured at Jebel Ali, Musaffah1 and Musaffah2 manufacturing locations. Each
location has its requirements, for handling manufacturing BoM levels for a same material to be produced.
In other words, a material might have 3 different BoM levels, depending on the location. Raw materials,
depending on the level of BoM, are issued to individual operation.
Due to the nature of items being consumed, is not possible to issue exact quantities of raw materials to
the production order. Production orders consuming similar materials are clubbed together for processing
and total raw material consumption can be known, by quantifying raw material stock available post
production. Quantity of the raw material issued for the particular production order can at the most be
calculated, only after the clubbed production run is over and total consumption for many production orders
in known. Expectation is, once the balance raw material quantity post production run is known, consumed
quantity should be compared with standard consumption, and overconsumption/underconsumption
proportionately be distributed over many production orders, which were part of the clubbed production
run. WIP STORAGE LOCATION WILL ISSUE MATERIAL TO PRODUCTION ORDER
Automatic Goods Issue to production order, based on standard consumption quantities, also known
as Back flush
Planned Goods Issue, to production order
PROCESS CHARACTERISTICS
Process Trigger Automatic/Manual
Process Input production order
Process Output Consumption quantities posted through material documents
Process Owner PP/Manufacturing function
Process Volumes Moderate
Process Frequencies Daily / As and when required
9.2.2Business Requirement
Stock Transfer
Back flush
Production store/s : Production Order
could be specific for
a group of work
centers. i.e Can be issued to Cost
bedding/sheathing. center, Production
Unplanned consumption Orders
----------------------------------------------------------------------------------------------
Flowcharts for GI/GR to production order.
9.2.5Integration Points
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
MM Process : Material PP, MM, FI Material doc, Munirathnam/
MM_IM_01 Documents and accounting doc Mohmmed
accounting
documents
generated while GI
and GR is posted
MM Process : Material PP, MM, FI Material doc, Munirathnam/
MM_PUR_02 Documents and accounting doc Mohmmed
accounting
documents
generated while
GI/GR for STO is
posted
MM Process : Material PP, MM, FI Material doc, Munirathnam/
MM_PUR_03 Documents and accounting doc Mohmmed
accounting
documents
generated while
9.2.6 Functional Solution for Process “Goods issue and goods receipt for production
order”
Goods Issue: Using this component, a material withdrawal or a material issue can be posted. A goods issue leads
to a reduction in warehouse stock.
Return: Reversal of a material movement that was entered with reference to a reservation. (Or if the quantity
withdrawn is returned, for example because it is not needed until later),
Ducab users will adopt stock transfer procedure for moving raw material stocks from RM stores to Production WIP
stores and Transfer Posting procedures for moving SFG/FG goods from quality inspection stocks to unrestricted
stocks, whenever applicable. Goods issue and return procedures then will be used to issue raw materials to shop
floor/production orders and return the unused materials back to production wip stores/RM stores.
Goods Issue: There are different types of Goods Issues; here we shall refer to goods issues for
Material withdrawals for production orders
Other types of internal staging of material
Scrapping/sampling
Goods issue can be entered in the system, with or without reference to a document.
Following documents can be a reference,
Reservations
Production Orders
Bills of Materials
If a reference documents exists (reservation/order), it is important to enter goods issue, with reference to this
document. This is done with following reasons,
The goods issuing department (RM stores for ex.) can check whether what was requested, is actually issued.
During entry of goods issue, the system can suggest data from the reference document (for example, account
assignment, requested material, quantity, etc.). This simplifies both data entry and checking (over deliveries and
under deliveries) when entering a goods issue.
After a withdrawal, the quantity withdrawn is updated in the reference document and the reserved quantity is
reduced accordingly. Thus, Inventory Management can monitor the withdrawal process and Materials Planning can
update the stock/requirements list.
Note: Transfer of material from RM Store to Production WIP Store can be done, by transferring bulk quantities of
raw materials, either with a reference to many production orders, by using PICK LISTS, or by manually calculating
quantities.
Sr. No Material Consumption for Data to be entered, against which GI will be done
1 Cost center Cost center
2 Project WBS element/networks
3 Sales Cost center
4 Network Network or operation
Following is the exemplary list of materials, which may be issued to cost centers/Project/Sales for Ex,
Goods Issue For Sampling: Drawing a samples is a goods movement that has usually to do with quality
inspection. Often, only a small subset of the total quantity in quality inspection stock is actually inspected. The
result of this inspection is then used as a basis for the usage decision that determines further processing of the
entire amount.
If you want to ensure that the quantity inspected is removed from stock, you can draw a sample. This type of
sampling can be destructive, that is, you can no longer use the material after the inspection. In this case, then,
sampling is the same as scrapping the material.
If the material is actually still usable after the inspection, you can post it back into stock (using a reversal posting).
You can draw a sample from the following types of stock:
Unrestricted-use stock
Quality inspection stock
Blocked stock
The value used is the value from the material master record at the time Goods Issue for Scrapping
You might scrap a material if you cannot use it any more, for example because:
The quality has been reduced due to long storage time
It is out of date
Goods Returns
Goods Receipt
The goods receipt for finished material will add to the stock of the material. GR will done, in the pre-created GR
batches for the production order material, as well as items which are termed as co-products or by-products.
A material document (Goods Receipt document) is created. This document serves as proof of the Goods Receipt
An accounting document is created. This document contains the account postings that are necessary for the
Goods Receipt
The following stocks are increased due to the reversal:
Total valuated stock
Quality Inspection Stock
Finished goods, Co-products as well as by-products will be created as material masters, along with
materials to be scrapped.
REPORTING
WWRICEF- Description Report Type Data Elements Relevant KPI Owner
ID (ABAP, BI,
BOBJ)
XX-xx-R001 Calculation of ABAP
scrapped
components,
based on
scrap qty
reported for
the operation
and
component
quantities
XX-xx-R002 Copper
tonnage
(output report)
– storage
location wise.
Cu Rod
(Daily/weekly/
monthly)
output report
with
transactional
details.
WIP inventory
report
XX-xx-R003
9.2.12 Interfaces
INTERFACES
WRICEF-ID Description Interface Applications Data Elements Frequency / Owner
Method Volumes
XX-xx-I001 NA
XX-xx-I002
XX-xx-I003
CONVERSIONS
WWRICEF-ID Conversion Source Conversion Conversion # of Objects Owner
Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx-C001 NA
XX-xx-C002
XX-xx-C003
9.2.14 Enhancements
ENHANCEMENTS
WRIC Description Data Object Functional Alternative SAP Reason Owner
OUTPUT / FORMS
WRIC Description Data Output Frequen Volu Ow
EF-ID Object Type cy mes ner
(Sales (Form,
Order) EDI, etc.)
XX-xx- NA
O001
XX-xx-
O002
XX-xx-
O003
9.2.16 Workflow
WORKFLOW
WRIC Description Data Object (Sales Engaged Owner
EF-ID Order) Parties
XX-xx- NA
W001
XX-xx-
W002
XX-xx-
W003
9.2.17 Authorization
AUTHORIZATIONS
ID Authori Role Data Reason # of
zation Objects employees
(Sales
Order /
TA
code)
XX-xx- For Produc MB1A, To provide
A001 Goods tion CO11N, necessary
Issues Operat MIGO, authorizations to
and or/Prod CO13, shop floor
revers uction CO14 associates,
als Superv executing the
isor transactions (org
Roles, Production
responsibiliti Operator/Pro
es and duction
Cable production starts with manufacturing of drawn wires. Product goes through several production stages and is
reported as SFG at the completion of specific operation for those stages.
When SFG are being produced certain amounts of same product is also reported, as unusable or scraps length or
weight. As the scrap length/weight contains many raw materials, including high value metal copper, lead,
aluminum etc. It is essential that while such scrap length is booked to the stock; all the components which have
gone in the manufacturing of that length should be known from quantity and value perspective and properly
accounted for in the system.
- Direct raw material scrap will only be weighed either when the box is full or at month end, whichever
comes first. This is the time when direct raw material scrap appears in the system and it is without any
reference of production order.
- Operation input/output scrap will be recorded at the time of operation confirmation i.e. this information will
be available at production order level. Alternatively, these can be handled in the same way as direct raw
materials by generating scrap either when the box is full or at month end, whichever comes first.
- All scrap quantities need to be measure in weight. Measurements are restricted to weighing since the
generic scrap codes (bedded cable, laid-up cable, etc.) does not contain any information of the cable build-
up and is devised to facilitate mass reconciliation.
- Batches of direct raw material to be sold, will be handled through MM scrap disposal/selling process.
- Recycling/Copper recovery of batches with operation input/output scrap can be handled in two ways:
1- Through stripping order with generic code scrap as input and various components (copper,
pvc, armour wire) as outputs.
2- Generic code scrap can be removed from the system using movement type ?? and the
recovered components can be recorded in new batches (boxes).
PROCESS CHARACTERISTICS
Process Trigger Manual – 1. Reporting of a scrap length/weight during operation OR 2.
reporting of a unusable length, which is termed as scrap length 3.Scrap
weigh
Process Input 1. Input the scrap length while carrying out confirmation process. 2.
Include unusable length in GR, as a separate line item
Process Output 1. Scrapped components included in goods movement, by calculating
quantities, depending upon the operation at which scrap is
reported2.Report unusable length/weight of FG/SFG. 3.System
accountability, valuation and adjustment
Process Owner PP
Process Volumes Moderate
Process Frequencies Frequent
9.3.5Integration Points
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
Process Material MM/FI Material Munirathnam/
MM_PUR_01 Document, Document, Mohammed
accounting accounting
document posted, document
while posting the
co-products GR,
STO for co-
products
MM_PUR_02 STO for materials MM PO Documents for Munirathnam/
information only Mohammed
Process FI Document FI FI Document Arvind/Riaz
1.7.1.1 FI
FB03
Confirmation
Use
Procedure
Result
REPORTING
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
9.3.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
EF-ID Method Volumes
XX-xx- NA
I001
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx- NA
C001
9.3.14 Enhancements
ENHANCEMENTS
WRIC Description Data Object Functional Alternative SAP Reason Owner
EF-ID (Sales Order) Gap Standard
XX-xx- NA
E001
OUTPUT / FORMS
WRICE Descrip Data Output Type Frequ Vol Owner
F-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
XX-xx- NA
O001
WORKFLOW
WRICE Description Data Object (Sales Engaged Owner
F-ID Order) Parties
XX-xx- NA
W001
9.3.17 Authorization
AUTHORIZATIONS
ID Authori Role Data Reason # of
zation Objects employees
(Sales
Order /
TA
code)
To Produc Co11N/ To Report
A001 Create tion MIGO/ creation of co-
GR for Operat MB1C products/scrap
CO- or/Prod etc
Produc uction
ts Superv
isor
A002 Transf Produc MB1B Transfer posting
er tion
stocks Operat
from or/Prod
WIP uction
storag Superv
e/scrap isor
storag
e
locatio
n to
other
locatio
n
Copper Rod manufacturing process generates many kinds of scraps, and byproducts which have metal
contents in it, and so has commercial value. Manufacturing process, if disrupted for some reason like a
breakdown, or a planned start-up/shut down, also generates metals in undesired physical forms, which
can go back into furnace. It is critical that the above two types of materials are identified and segregated
so that mass balancing of metal can be achieved successfully and scrap level can be controlled.
PROCESS CHARACTERISTICS
Process Trigger Production order - operation Confirmation -
Process Input Production order no, operation number for which confirmation is to be
carried out
Process Output GR for co-products/by-products is done, scrap components are included
in goods movements
Process Owner PP
Process Volumes Moderate
Process Frequencies Daily / As and when required
9.4.6 Functional Solution for Process “Scrap management at all stages for Copper Rod
Production”
Confirmation
Use
Procedure
Result
Confirmation will be saved with scrapped components and co-products generated during operation, with
proposed quantities.
Refer to Plants and Storage locations described in SAP organisational structure mentioned in the beginning of this
document.
REPORTING
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
Mass Metal ABAP Copper Cathode
Balancing input quantity,
Report finished material
quantity, scrap and
co-product
quantities, order
nosetc
9.4.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
EF-ID Method Volumes
XX-xx- NA
I001
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx- NA
C001
9.4.14 Enhancements
ENHANCEMENTS
WRIC Description Data Object Functional Alternative SAP Reason Owner
EF-ID (Sales Order) Gap Standard
XX-xx- NA
E001
OUTPUT / FORMS
WRICEF Descrip Data Output Type Frequ Vol Owner
-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
XX-xx- NA
O001
9.4.16 Workflow
WORKFLOW
WRICEF Description Data Object (Sales Engaged Owner
-ID Order) Parties
XX-xx- NA
W001
9.4.17 Authorization
AUTHORIZATIONS
ID Authori Role Data Reason # of
zation Objects employees
(Sales
This process is about rework in manufacturing. Objective is to monitor rework being done on products,
quantify the rework, find out areas frequently doing rework, analyze the root cause and minimize the
rework.
Out of Ducab product range manufactured in house, cable products are the ones, where rework takes
place most frequently. Though Copper rod manufacturing process also generates rework, the CRP plant
rework necessarily means re-melting the product in question. PVC products cannot be reprocessed.
It is necessary that products being reworked upon must be reported, along with rework quantities,
component quantities consumed in excess of planned consumption due to rework, with reasons of
rework. Impact on manufacturing costs should be known, to the stake owners.
PROCESS CHARACTERISTICS
Process Trigger Manual
Process Input Rework operation quantity
Process Output Rework Production Order or operation is complete
Process Owner PP
Process Volumes Moderate
Process Frequencies Daily / As and when required
9.5.2Business Requirement
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
Process Creation of a APO Production Milind/
PPDS 06/07 rework order Order Nouman
QM 02 Quality QM QM operation Vivek/Manoj
Inspection confirmation
operation
Process Material MM Material Munirathnam/
MM_IM_01 document document Mohammed
Process FI Document for FI FI Document Arvind/Riaz
1.7.1.1 FI GI/GR
FB03
Procedure
SAP ECC Menu Logistic > Production > Shop floor control > Order > Change >
Wherever there is a rework situation, a new rework operation is inserted into production order
A rework order is always created with a suitable settlement rule, without any header material so as to complete the
rework operation and the costs should be accumulated to the original production order which generated rework.
Procedure
SAP ECC Menu Logistic > Production > Shop floor control > Order > Create>
A rework order relieves user of inserting operations into existing order. It is also administratively easy to
monitor rework costs, which are captured through rework production order.
Result
A rework production order is created
Use
Create a rework production, with suitable operations and issue goods/components, required for execution of the
order.
Plant specific rework routings may be created, which will help users with ease of copying the same.
Not applicable
REPORTING
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx- List of ABAP Production orders,
R001 production rework orders, cost,
orders, having components used,
rework order work centers
associated involved
with it
9.5.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
EF-ID Method Volumes
XX-xx- NA
I001
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx- NA
C001
9.5.14 Enhancements
ENHANCEMENTS
WRICEF-ID Description Data Object Functional Alternative SAP Reason Owner
(Sales Order) Gap Standard
XX-xx-E001 NA
OUTPUT / FORMS
WRICE Descrip Data Output Type Frequ Vol Owner
F-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
9.5.16 Workflow
WORKFLOW
WRICEF Description Data Object (Sales Engaged Owner
-ID Order) Parties
XX-xx- Inform rework Rework order, Production PP
W001 order / fault card Inspection lot Planner/Quali
creation to ty Manager
planner/Identifie
d roles
9.5.17 Authorization
AUTHORIZATIONS
ID Authorizatio Role Data Reason # of
n Objects em
(Sales plo
Order / yee
TA code) s
XX-xx- Create Production CO01 To create
A001 rework Planner CO07 a rework
order (fine order
tuning with
APO
required)
XX-xx- Issue goods Production MB1A, To issue
A002 to an order Planner MIGO necessary
componen
ts to the
order
XX-xx- Rework Production CO11N, To confirm
A003 confirmatio Operator/Producti COST, the
n on Supervisor CO15 operations
or orders.
Ducab’s state-of-the-art copper casting plant,uses Copper Cathodes and converts them into 8mm diameter
Electrolytic Touch Pitch (ETP)Copper Rods as per BS EN 1977:1998 and ASTM-B49-08astandards. These Rods
are highly recommended for use in Power Cables, Automobile Wire Harnesses, Communication Cables, House
Wiring, Overhead Copper Conductors (SDBC) and Transformer Windings.
Ducab Rod Mill uses"CONTIROD®" Technology, a process that involves - Melting, Casting and Rolling. It uses
novel gas control systems to ensure that each of the 15 burners perform independently. The final result is a copper
rod that is more efficient to produce and has the best metallurgical structure. The plant is fully computerized and
has the capacity of producing 110,000 tonnes per year.
To summarize, following forms are generated due to process issues or mechanical breakdowns, which need
rework in copper rod plant.
Cut Bars
Molten metal poured in metal containers, also called ingots in many industries
Wire Rod 8 mm cable
Edge scalping scrap.
Rolling mill chips and copper spillage & dust which are generated during normal production run. These
materials should be treated as byproducts that can be sold externally.
PROCESS CHARACTERISTICS
Process Trigger Manual
Process Input Quantified rework in different physical form, to be issued to a regular
production order
Process Output Issue to a production order
Process Owner PP
Process Volumes Moderate
Process Frequencies Daily / As and when required
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
Use
In the shop floor confirmation transactions, plant personnel enter the confirmation for operations of production
order. SAP IS-Mill cable solution provides environment, where users can enter all the operation relevant data,
along with Goods Issue batch on which production processes are carried out, on a single screen.
All the components/raw materials consumed during this operation also are entered simultaneously on the same
screen. Operation relevant data, like dates and time, work center where the operation was executed etc are also
entered at the same instance, making it a user friendly transaction.
Result
A confirmation for production order operation with co-products details is entered, with relevant material movements
posted through a single screen entry. Co-products and scrap are generated, waiting to be charged back to furnace
With this type of withdrawal the system automatically creates a reservation for the components planned in the
order. When you enter the goods issue, you can reference the order or the reservation. The system determines all
components to be withdrawn.
Procedure
SAP ECC Menu Logistics > Production > Shop floor > Order > Confirmation > For operation >
Time ticket > Enter
Transaction code CO11N/MB1A
Business Role Production Supervisor/Technician
Procedure
SAP ECC Menu Logistics > Production > Shop floor > Order > Confirmation > For operation >
Time ticket > Enter
Transaction code CO11N/MB1A
Business Role Production Supervisor/Technician
Result
Unplanned Goods Issue to production order is done
REPORTING
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx- Production
R001 report,
quantifying
9.6.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
EF-ID Method Volumes
XX-xx- NA
I001
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx-
C001
9.6.14 Enhancements
ENHANCEMENTS
WRICEF- Description Data Object Functional Alternative SAP Reason Owner
ID (Sales Order) Gap Standard
XX-xx- NA
E001
OUTPUT / FORMS
WRIC Descrip Data Output Type Frequ Vol Owner
EF-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
XX-xx- NA
O001
9.6.16 Workflow
WORKFLOW
WRIC Description Data Object (Sales Engaged Owner
EF-ID Order) Parties
9.6.17 Authorization
AUTHORIZATIONS
ID Authori Role Data Reason # of
zation Objects employees
(Sales
Order /
TA
code)
XX-xx- To Produc CO11N To report
A001 enter tion completion of
confirm Operat operation and
ation or/Sup GI/GR
and ervisor simultaneously
perfor
m GI
and
GR
Daily/Weekly production
reports at present are not
Standard - Refer to standard SAP
possible from BaaN as
production reports (COOIS for example).
attached in Appendix 2.
Discrepancy in accounting of
scrap generation Standard – User discipline required
Hours accounting is a process of providing a detailed break up of events, which have taken place during time
period. Hours accounting is currently done by shop floor personnel, for a particular work center, for a shift. All non-
productive activities, which kept the work center idle/non-productive, are accounted for, in a soft/hard form.
PROCESS CHARACTERISTICS
Process Trigger Manual
Process Input Events/breakdowns during a shift
Process Output Accounting of Events/breakdowns is complete
Process Owner PP
Process Volumes High
Process Frequencies Every Shift
INTEGRATION POINTS
SAP ECC Menu Logistics > Production > Shop floor control
Transaction code TBD
Business Role Production Technician
Every shift, production operator enters into the system, the breakup of shift time (8 hrs)
It is expected to provide the breakup in detail for various elements.
The available data may be analyzed later for SFC improvement purposes
Though the standard confirmation screen provides the place to enter the “Reason for Variance”, it is
associated with a production order and does not provide options to capture events in detail, as required by
Ducab business. A development to the standard solution is proposed, wherein detailed events can be
captured, stored suitably, to be analyzed at any point.
Result
Refer to KDS sheet for this. Detailed event codes as required by the business will be created
REPORTING
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx- Hours ABAP Dates, time with
R001 accounting event details
report
Production
Data
Analysis
Machine
utilization
report
Detailed
report of
events and
process
parameters
from
Logbook
data.
9.7.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
EF-ID Method Volumes
XX-xx- NA
I001
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx- NA
C001
9.7.14 Enhancements
ENHANCEMENTS
OUTPUT / FORMS
WRIC Descrip Data Output Type Frequ Vol Owner
EF-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
XX-xx- NA
O001
9.7.16 Workflow
WORKFLOW
WRIC Description Data Object (Sales Engaged Owner
EF-ID Order) Parties
XX-xx- NA
W001
9.7.17 Authorization
AUTHORIZATIONS
ID Authori Role Data Reason # of
zation Objects employees
(Sales
Order /
TA
code)
XX-xx- To Produc TBD To enter details of
A001 enter tion HRS accounting
details operat and events
of HRS or
accoun
ting
and
events
As part of augmenting processing capabilities of all the cable manufacturing plants, or to adhere to the
delivery schedules despite equipment breakdowns, operations are off-loaded from one manufacturing
plant to other. This process of off-loading or subcontracting is explained below.
PROCESS CHARACTERISTICS
Process Trigger Manual
Process Input Production order operation to be offloaded/subcontracted
Process Output Offloaded operation
Process Owner PP
Process Volumes Moderate
Process Frequencies As and when required
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
Material document MM Material document
Refer to MM MM Munirathnam/
process “ Mohammed
MM_PUR_02” for
interplant material
movements
involved
Refer to MM PR MM PR Munirathnam/
process “ Mohammed
MM_PUR_03”
and
MM_PUR_16for
subcontracting
MM with outside
vendors,
including Ducab
HV company
Use
This Activityis carried out to change the operation, so that work center details of the new executing plant can
be entered into the production Order
Procedure
SAP ECC Menu Logistics Production>Shop floor control
>Order>Change
Transaction code CO02
Business Role Production Planner
Operation details, like work center and plant are changed, as required, to the new executing plant, along
with operation details like activities. Planner may choose to change the operation control key, suitably.
Changing the control key suitable to subcontracting option will enable creation of a purchase requisition.
Refer to MM process “ MM_PUR_02” for interplant material movements involved
Note: In view to have visibility of components, it is necessary to create a material master (item code) at all the
Intermediate operations, from where unfinished component goes to processing to subcontractor. Without a
Material master (item code), it will be possible to generate a requisition for purchase of service (painting for
Ex) wherein component going to subcontractor and coming back will not reflect in the requisition. Only
Components provided to subcontractor (paint for ex) will be visible in a requisition.
Above illustration shows the operation which is being subcontracted and document flow .
Result
Production order is changed, to execute the operation in a changed plant
Use
This Activity is carried out to find out the off-loaded operations and the work center at which this operation is
to be executed.
Procedure
SAP ECC Menu Logistics >Production>Shop floor control > Order Information system
Production order operation details are known in the new executing plant.
Result
Production order is changed to suit the operation taking place in other plant
Use
This activity is carried out for carrying out confirmation for operation which was off loaded.
Procedure
SAP ECC Menu Logistic >Production > Shop floor control > Confirmation > Enter > For
operation
REPORTING
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx-
R001
9.8.12 Interfaces
INTERFACES
WRIC Description Interface Applications Data Elements Frequency / Owner
CONVERSIONS
WWRICE Conversion Source Conversion Conversion # of Objects Owner
F-ID Object Activities Method (manual to be
(e.g. / automated) converted
cleansing)
XX-xx- NA
C001
9.8.14 Enhancements
ENHANCEMENTS
WRIC Description Data Object Functional Alternative SAP Reason Owner
EF-ID (Sales Order) Gap Standard
XX-xx- NA
E001
OUTPUT / FORMS
WRICE Descrip Data Output Type Frequ Vol Owner
F-ID tion Object (Form, EDI, ency um
(Sales etc.) es
Order)
XX-xx- NA
O001
9.8.16 Workflow
WORKFLOW
WRIC Description Data Object (Sales Engaged Owner
EF-ID Order) Parties
XX-xx- Event “Change Production Order Planners PP
W001 Operation and identified in
work center in involved
production plants
order” to trigger
a mail
notification to
Planners in both
plants
AUTHORIZATIONS
ID Authori Role Data Reason #of
zation Objects emplo
(Sales yees
Order / TA
code)
XX-xx- CO02 Planner Prod order Change/insert
A001 operation in a
production
order. Change
Control Key for
the operation
Shop floor papers play a critical role at Ducab, to communicate to shop personnel, all the information
essential for them to produce the product required by the customer, with all the specifications.
Product/material codes to be produced, length required on individual drums with unique ID, operations
instructions to shop personnel, specifications etc is communicated to the floor personnel using shop floor
papers, called drum cards and core cards.
Lay-up operation onwards processes use drum cards, whereas operations from conductor formation till
insulation use core card.
Process Characteristics
Integration Points
Use
Drum card carries all the necessary information for cable plants to produce the products, with all the product
specifications, customer spefic requirements, special operation instructions, reel ID (the batch number for which
the information is provided) etc.
Procedure
SAP ECC Menu Logistics > Production > Shop floor Control > TBD
Transaction code TBD
Business Role Planner/Supervisor
No special considerations
Not applicable
Reporting
9.9.12 Interfaces
Interfaces
Conversions
enhancements
Output / Forms
9.9.16 Workflow
Workflow
9.9.17 Authorization
Authorizations
Simple cutting explains the process of cutting the products into smaller lengths, as required by the customer. Also
when the products are available ex stock, then customers can be serviced by providing the products from stocks,
by simply doing the required change to the available product, cutting into smaller lengths for example
Process Characteristics
INTEGRATION POINTS
ID Integration Point SAP Component Data Element Contacts
Process Material MM Material Document Munirathnam/
MM_IM_01 Documents Mohammed
generated during
GR of FG, co-
products and
scrap materials
Process 1.7.1.1 FI Document for FI FI Document Arvind/Riaz
FI GI/GR
FB03
Use
This activity is carried out for cutting the longer length stocks into multiple shorter length stocks
Procedure
SAP ECC Menu Logistics > Materials management > Inventory management > Goods
movement > MILL_CUT
Transaction code MILL_CUT
Business Role Planner
Call the transaction and enter all the details, as described in solution steps. In view to achieve cutting from stocks,
without creating production orders and other transaction data, cutting stock transfer comes handy. A product with
longer lengths can easily be cut into smaller lengths, as required. Co-products and scrap also can be taken care
of, depending on the business situation.
Result
Product with longer length batch is cut to customer required length. Simultaneously, co-products and scrap also
are reported.
Reporting
Interfaces
Conversions
9.10.14 Enhancements
enhancements
Output / Forms
9.10.16 Workflow
Workflow
9.10.17 Authorization
Authorizations
Change Impact Old Way New Way Positive Impacts Negative Impacts
Summary To Company To Company
To individual roles To individual
roles
Process Strategy Central planning Stock Stock no
e.g., looks into stocks information information is
Principles
How
available. Yard available in SAP available
High-level data supervisor is system, with centrally, to be
flows informed to length for all the used by
provide the batches for a authorized
stocks product. length personnel. Easy
information. maintenance will and instant
be done locally. access to stock
Where the information
relevant
processes are
carried out.
(Improvement –
only the
authorized
personell at plant
level will be able
to maintain the
length)
Process & Outside BAAN Within SAP Transparency
Metrics (focus on system, without and traceability
key changes to
specific steps and
production of stocks
transactions) transactions like available with
order, BoM and cutting options.
routings It will be done
through
MILL_CUT
order.
Roles, Central Planning Central Planning
responsibilities
and organization
Who’s
accountable?
Who’s
responsible?
Who’s consulted?
Who’s informed
Roles,
responsibilities
In the event of faults in product, within lengths produced, or due to issues in production, sometimes product finish
lengths or part finish lengths are cut into two individual lengths.
In such cases, the product with new lengths becomes unusable, as per the sales order specifications. Central
planning in this case approaches the end customer, to expedite the possibility of delivering him the new lengths
produced. At times, customer opts to accept the new length. Products with new lengths are then sent to the
customer. In the event the customer refuses to accept the product with short lengths, it becomes necessary to
produce the same product with required length again.
A decision must be taken on short lengths manufactured. Rules to be decided by business based on cable types.
Process Characteristics
Integration Points
Transfer Posting
Use
This activity is carried out for breaking the pegging between the stocks and the sales order for which the stocks
were produced.
Procedure
SAP ECC Menu Logistics >Materials Management > Inventory Management > Goods
Movement > MIGO
Transaction code MIGO
Business Role Production Planer/Supervisor
Result
Pegging between product’s stock batch and sales order is broken. Stock starts appearing as plant’s free stock,
ready to be delivered against any sales order.
Once APO MRP is done, it then will provide a new planned order, on which planners can act and provide a
released production order for fulfillment of original sales order item.
No special considerations
Not applicable
Reporting
Interfaces
Conversions
9.11.14 Enhancements
enhancements
Output / Forms
Workflow
9.11.17 Authorization
Authorizations
Change Impact Old Way New Way Positive Impacts Negative Impacts
Summary To Company To Company
To individual roles To individual
roles
Process Strategy 1. Short length 1.Reported short
e.g., product GR is length is visible
Principles
How
done. to stake holders
High-level data 2.Stocks appear 2. Once stocks
flows in plant stock and S.O. pegging
Fault Cards system (FC) isn’t Inspection lots are generated, once batch is created, and
linked at all with our Baan system. result recording, Usage decision is available to stake
holders once lot is inspected
Cable manufacturing plants use Process Drums for handling cable products during manufacturing process.
Baskets and bobbins are used for drawn wires, for same purpose. To maintain traceability/linkage of input and
output materials, take-up drums and pay-off drums used for every material length produced; need to be tracked,
with one –to-one relation. This helps plant manufacturing and Quality personnel to trace the product’s input
materials used, in case there is a quality issue or customer complaint. This system of tracking is useful in absence
of an ERP system which provides traceability even without tracking physical drum IDs.
Process Characteristics
Not applicable
Integration Points
Necessary Characteristics will be created to represent process drums, baskets and bobbins ID. These
characteristics will be assigned to classes applicable. This will help users to maintain ID information for every batch
of the product which is produced. Users will also information on issue batch drum ID/bobbin ID/Basket ID which is
being consumed in the production.
It is required to be noted here, the limitations of this approach. Though the characteristics are created with option
“Entry required”, so that every time a product batch is generated, system makes it mandatory to enter the
characteristics value before batch classification is saved, navigation/diverting to batch classification itself is a
manual activity. User discipline is a must in this case, as there are limitations on account of features available in
SAP system for process drum ID tracking and usage of standard functionality of classification. Also there is no
validation possible for characteristics values entered in batch classification.
System users responsible for reporting and changing product batch characteristics will either maintain all the batch
information, including one representing drum/bobbin/basket ID, OR change the batch characteristics of the existing
batch.
Procedure
SAP ECC Menu Logistics > Central Functions > Batch Management > Batch > Change
Transaction code MSC2N
Business Role Production operator/Person entering Book to stock
Shop floor operator/supervisor/data entry person responsible for maintain the product batch classification,
will enter the values for all the necessary characteristics including ID, and save the batch.
Result
Product batch is saved with all the necessary characteristics values, including Process Drum ID, Bobbin ID OR
Basket ID.
Classes
Characteristics and values
Batches
Reporting
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx- Report for ABAP SO,Prod ORD, Process
R001 SO,PROD drum ID for takeup and
ORDER, payoff at wire,
Process drum conductor, core and
for all levels of cable levels.
manufacturing
XX-xx-
R002
XX-xx-
R003
9.12.12 Interfaces
Interfaces
Conversions
9.12.14 Enhancements
Output / Forms
9.12.16 Workflow
Workflow
9.12.17 Authorization
Authorizations
Change Impact Old Way New Way Positive Impacts Negative Impacts
Summary To Company To Company
To individual roles To individual
roles
Process Strategy Drum ID data Drum ID data single system for Increased data
e.g., maintained will be maintaining all entry work
Principles
How
outside BAAN, maintained in the business
High-level data in log books SAP system for critical
flows every relevent information
product batch
Process & Enetr the Enetr the Business critical No validation
Metrics (focus on information in information for information entry and checks for
key changes to
specific steps and
log boks batch in SAP possible incorrect entry
transactions) system
Fully delivered production orders, or those production orders which are not expected to deliver more, are closed in
SAP system.
Process Characteristics
Not applicable
Integration Points
Use
Technical completion means ending a production order from a logistical viewpoint. This function is usually used, if
production is complete or if the execution of an order has to be stopped prematurely or if the order could not be
executed in the required manner and open requirements for the order (reservations, capacities) should be deleted.
After technical completion you can still make postings for the order by revoking TECO. For instance, material
withdrawal or a confirmation can be posted if they were previously forgotten.
Procedure
SAP ECC Menu Logistics > Production > Shop floor Control > Order > Change
Transaction code CO02
Business Role Production Supervisor/Person entering Book to stock/
Each process order will be technically completed by process dept. after final confirmation will be done at the end
of the month. Once the Process order is technically complete, it will be settled by costing dept as a period end
activity. This activity called settlements of process orders.
You can execute this function in two ways:
When you are changing an order, choose Functions > Restrict processing >Technically complete.
You can reverse technical completion as follows:
When you are changing an order, choose Functions > Restrict processing > Revoke technical completion.
Pls. refer to KDS document for production order types and related configuration values
Reporting
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx- Customized ABAP customer order no& PP
R001 report for quantites, delivered
customer order quantities for prod
quantites, order, open quantities,
delivered short close quantities,
quantities, open rejection, scrap
quantities,
short close
quantities,
rejection, scrap
etc.
XX-xx-
R002
XX-xx-
R003
9.13.12 Interfaces
Interfaces
Conversions
9.13.14 Enhancements
enhancements
Output / Forms
Workflow
9.13.17 Authorization
Authorizations
Change Impact Old Way New Way Positive Impacts Negative Impacts
Summary To Company To Company
To individual roles To individual
roles
Process Strategy Single level Multilevel Realistic creation Large amount
e.g., production production of production of production
Principles
How
orders created in orders in SAP, orders, instead of orders
High-level data BAAN execution, phantom
flows delivery and
closure at actuals
in SAP
Process & Creation of prod Step by step nil
Metrics (focus on orders in APO advancing of
key changes to
specific steps and
planning system, orders from
Explanation:
1. The generation of scrap materials/ co-products in SAP will be done through production orders execution,
and GR for co-products will generate these scraps in respective storage locations. Further to generation,
the movements of materials is expected to be explained by MM module, via BBP MM_IM_02 Physical
Inventory process, MM_IM_03 scrap process, MM_PUR_02 Intra company stock transfer process,
MM_PUR_03 Inter company purchase and sell process
Explanation:
1. The inter-site movements of materials is material movement within two plants in SAP system, and is
expected to be explained by MM module, via BBP MM_PUR_02 Intra company stock transfer process,
MM_PUR_03 Inter company purchase and sell process
Explanation:
1. The subcontracting process is expected to be explained by MM module, via BBP MM_PUR_16Cathode
tolling process
Explanation:
1. Material movement from Central Warehouse to Production WIP Stores, is material movement within a
plant in SAP system, called transfer posting and is expected to be explained by MM module, via BBP
MM_PUR_02 Intra company stock transfer process, MM_PUR_03 Inter company purchase and sell
process
Write-up also available in PP process Goods Issue and Goods Receipts for production order, wherein
Transfer posting has been explained.
Explanation:
1. Rework of customer sent materials, is explained in SD BBP SD_TL_01, wherein customer owned materials
are received into a plant storage location as non-valuated materials, and subsequently can be processed
using a manually created production order with necessary operations.
At Ducab, most of the length based cable products will be planned using Adavnced Planner and Optimizer (APO)
There are critical products though, for which it has been agreed to carry out planning in ECC system for keeping
away the complexities in APO planning. Business requirement is to keep the planning process simple and flexible.
The said decision was taken on 14th January 2012, to keep the APO complexities to a minimum. It was also
agreed to split the available capacity of work centers shared between APO and ECC systems. Intermediate wire
drawing is one such work center, which produces drawn wires for building wire prorducts planned in ECC and
Cable products planned in APO. This planning situation is only arising in M1 Plant.
These critical products include Copper Rod 8 MM which goes into cable manufacturing apart from selling to
outside Ducab customers, PVC products which mainly are consumed within cable manufacturing plants and some
of the products in product range known as „Building Wires“, which does not call for length based APO planning,
and the same is planned as discrete products.
For above and such products, it proposed to use ECC demand management component alongwith ECC MRP
process and SFC process, wherein SFC process will also have production orders coming in from APO planning.
Demand Management – MRP – Production Order cycle for above products is explained below in brief. Though
SAP ECC offers many planning features and functionalities, to keep the solution simple and flexible it is proposed
to use only select functions. It should be noted that Ducab’s main business area, and also the planning pain area is
cable products manufacturing which will be handled in APO planning, and not products which are planned in ECC
system.
The function of Demand Management is to determine requirement quantities and delivery dates for finished
products. Customer requirements are created in sales order management. To create a demand program, Demand
Management uses planned independent requirements and customer requirements. As per Ducab PP team, the
planned independent requirements and customer requirements quantities, can be given and readily available after
formal meeting between the Sales & Central Planning persons every month end for the next month, at every month
end.
To create Demand Program, planning strategies are to be defined for the materials or at a higher level like “MRP
group”. Planning strategies represent the methods of production for planning and manufacturing or procuring a
product.
For all the Building Wire products (products up-to 10 MM wire size, which are to be planned within ECC system),
either Sales order or planned independent requirements can trigger the planned order. For the PVC products and
Copper Rod products – for those that can be stocked, planned independent requirements to be given by a
combined team of Sales & Production. Examples of such products are PVC products manufactured at Jebel Ali
plant and 8 MM Copper Rod, manufactured in CRP manufacturing facility at Musaffah M1 in Abu Dhabi.
Plan for all these products may be reviewed by the PP team/Central Planning team/Sales team and can be
finalized in the month beginning. Sales orders received from customers for such products, and Planned
Independent Requirements are to be punched then and there in SAP system, so that MRP run is done for products
and Planned orders created for scheduling purposes.
The use of PIR (Planned Independent Requirement) and Customer Requirement will not alone suffice the
Demand management. The Demand Management uses the Planning strategies to represent the business
procedures for the planning of production quantities and dates. A range of planning strategies is available in ECC
6.0, where we will be using the following strategies, though the list is not complete,
Depending on the strategies, it is possible to use/not to use Sales orders, move the stocking level down to the
assembly level and carry out Demand Management specifically for the assembly. Detailed work of segregating
products into manageable groups shall be done at a later phase. Also finalization of strategies to be used at Ducab
will be done at a later phase.
(MRP Run for a Material for which PIR is created) – This process shall be executed by Central Planning for PVC
products, Building Wires and Metals Department will do MRP for Copper rod products (8 MM Copper Rod till
Copper Cathodes etc)
The main function of material requirements planning is to guarantee material availability, that is, it is used to
procure or produce the requirement quantities on time both for internal purposes and for sales and distribution.
This process involves the monitoring of stocks and, in particular, the automatic creation of procurement proposals
for purchasing and production. In doing so, MRP tries to strike the best balance possible between,
· Optimizing the service level and
· Minimizing costs and capital lockup
The MRP controller is responsible for all activities related to specifying the type, quantity, and time of the
requirements (components); in addition to calculating when and for what quantity an order proposal has to be
created to cover these requirements. The MRP controller needs all the information on stocks, stock reservations,
and stocks on order to calculate quantities, and also needs information on lead times and procurement times to
calculate dates.
PIRs and customer orders become an input to MRP process and Planned Orders, Purchase requisitions and
schedule lines typically are the MRP outputs.
Planned Orders are then converted to Production Orders, which form the basis for shop floor execution.
Production Orders
The work processes within a company are executed using orders. It is proposed to use order controlled production
at all the Ducab manufacturing facilities, including cable manufacturing, PVC manufacturing and Copper Rod
manufacturing.
A production order defines which material is to be processed, at which location, at what time and how much work
is required. It also defines which work centers are to be used and how the order costs are to be settled.
Production order is required to know the schedule and have control over the execution of the planned values for
the order.
Entry for production order at the shop floor level should be user friendly for confirmation of operations or having
confirmation for whole order. Consumption of materials and Goods receipts for orders should also propose the
values that are planned in the order.
A production order specifies which material is to be produced, where it is to be produced, which operations are
required to do this and on which date production is to take place. It also defines how the order costs are to be
settled.
Planned orders generated in the MRP run can be converted individually into production orders from the current
stock/requirements list. They can also be grouped together by the MRP run and converted into production orders
together. These production orders can be released together.
1. Operation scheduling
Every operation in planned and production orders is divided into operation segments:
· Queue time
· Setup time
· Processing time
· Teardown time
· Wait time
The sum of the setup time, the processing time and the teardown time forms the execution time (see following
graphic).
In planned and production orders the move time represents the duration of the relationships.
The system takes the floats before and after production into account for planned orders and production orders. The
float before production is between the order start date and the first operation, the float after production between the
finish date of the last operation and the order finish date.
2. Order Scheduling
Following are the scheduling types available for a production scheduler to use.
Forward scheduling
With this scheduling type the system schedules forwards starting from the basic start date or the scheduled start
date of the order.
Backward scheduling
With this scheduling type the system schedules backwards starting from the basic finish date or scheduled finish of
the order. This scheduling type is recommended for PVC and Copper Rod production plants at Ducab’s production
plants.
Today scheduling
With this scheduling type the system uses today’s date as the basic start date and schedules forwards.
Following graphics illustrates how a production order is scheduled
Not applicable
1 Create Planned External Sales planning is MRP MD61 PIR for a material
Independent and complete Controller created
Requirements for Internal
a material Demand
for a
material is
known
2 Change Planned External or Sales planning is MRP MD62 PIR for a material is
Independent Internal undergoing change Controller changed
Requirements for Demand
a material for a
material is
changes
for a
period
4 MRP Multi level, Periodic Material MRP MD02 MRP is carried out
single item for a requirement Controller for a material, for
material planning is to be all levels of BoM
carried out
5 MRP single item, Periodic Material MRP MD03 MRP is carried out
single level requirement Controller for a material, for a
planning is to be single level
carried out
6 Multi level Sales order MRP is MRP MD50 MRP is carried out
planning for a to be carried out Controller for a sales order
sales order Item item
Integration Points
MRP Controller/Person Responsible, will enter requirement quantities for products, to create demand in system.
This activity is carried out quarterly or yearly, though monthwise PIRs also can be created
Result
PIR for a material and a period are created
MRP RUN
Use
The main function of material requirements planning is to guarantee material availability, that is, it is used to
procure or produce the requirement quantities on time both for internal purposes and for sales and distribution.
This process involves the monitoring of stocks and, in particular, the automatic creation of procurement proposals
for purchasing and production
PIRs and customer orders become an input to MRP process and Planned Orders, Purchase requisitions and
schedule lines typically are the MRP outputs.
Planned Orders are then converted to Production Orders, which form the basis for shop floor execution.
Result
MRP run for a material is carried out and planned orders/Purchase requisitions are generated.
Material availability check may be performed during conversion of planned orders to production orders
Capacity check also may be performed during conversion process
Result
Planned orders are converted to production orders.
Pls. refer to KDS document for production order types and related configuration values
Reporting
WWRICE Description Report Type Data Elements Relevant KPI Owner
F-ID (ABAP, BI,
BOBJ)
XX-xx- NA
R001
XX-xx-
R002
XX-xx-
R003
9.19.12 Interfaces
Interfaces
Conversions
9.19.14 Enhancements
enhancements
Output / Forms
9.19.16 Workflow
Workflow
9.19.17 Authorization
Authorizations
Change Impact Old Way New Way Positive Impacts Negative Impacts
Summary To Company To Company
To individual roles To individual
roles
Process Strategy Requirements are Requirements - Automation of
e.g., generated will be generated planned
Principles
How
manually with through MRP run orders/productio
High-level data the use of Excel based on PIR or n orders
flows files re-order point generation
method - Optimum FG
stocks
Process &
Metrics (focus on
key changes to
specific steps and
transactions)
Roles,
responsibilities
and organization
Who’s
accountable?
Who’s
responsible?
Who’s consulted?
Who’s informed
Roles,
responsibilities
and organization
Who’s
accountable?
Who’s
responsible?
Who’s consulted?
Who’s informe
Related/Referenced Documents
Attachments
Document Name Version Brief Description
KDS document Key data structure document explaining configuration
values for Ducab SAP PP configuration