Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.

com

ACTIONS ON BRIDGE
STRUCTURES
AASHTO LRFD

1
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

1. Dead load of structural component


p

Materials Unit Weight


(kg/m3)
g surfaces
Bituminous wearing 2250

Cast iron 7200


Cinder filling 960
Compact sand, silt, or clay 1925
Concrete,, lightweight
g g ((includes reinforcement)) 1775
Concrete, sand-lightweight (includes 1925
reinforcement)
Concrete, normall (includes
(i l d reinforcement)
i f ) 2400
Loose sand, silt or gravel 1600

2
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

1. Dead load of structural component


p

Material Unit Weight (kg/m3)


Soft clay 1600
R ll d gravel,
Rolled l macadam,
d or bballast
ll t 2450
Steel 7850
Stone masonry 2725
Hardwood 960
Softwood 800
Transit rails, ties and fastening per 0.3 ×109
track

3
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

2 V
2. Vehicular
hi l Li Live lload
d (S3.6.1.1)
(S3 6 1 1)
2.1 Vehicular design loads

rrW
• Design truck Design tandem
• Design lane load
L d model
Load d l tageday HL-93
HL 93.

RtUUvsMKal;fa vamintMNageGayrfynþþ RbePTNa mYYyenaHeT.

4
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

1. Design truck (S3.6.1.2.2)

5
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

2. Design tandem (S3.6.1.2.3)

Design tandem pSMBIbnÞúk 110kN mYyKU XøatKñacMgay 1,2m.


KMlattamTisTTwg rbs;kg; nimYy² esμI 1,8m.

6
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

3. Design
g lane load ((S3.6.1.2.4))

CabnkrayesI
Þú μ mantMél 9,3kN/m
, raytambeNaysan.
þ <
tamTisTTwg eKsnμtfa lane load rayesμIelIRbEvg 3m (esμInwg 3,1kN/m2).

7
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

* Dynamic Load Allowance


edaysarépÞpøÚvfñl;minrabesμIsuTsaF dUecñHrfynþGacrlak;tic²
eFIeGayektman
eFV GayekItman klagTgÁ
kMlaMgTgic bEnß
bEnmelI
melklagsþ
kMlaMgsaTiaTc.
c.

8
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

Component IM (%)
D k jjoints-all
Deck i t ll li
limit
it states
t t 75
All other components
Fatigue and fracture limit states 15
All other limit states 33

All other component rYmman girder, beams, bearings


nig column.
co u .

eKmineRbIemKNenH
eKmneRbemKu NenH srab
sMrab; pedestrian load ng
nig lane load eT.

9
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

The requirement for 75% impact on deck joints is based on oral


reports of tests in Europe in which parts of expansion joints were
strain-gaged
g g and were found to be subject j to about 75% dynamic
y
load increase, as well as the observed tendency for there to be an
even settlement immediately preceding bridges, as well as
di l d d broken
dislodged, b k concrete in i the
h immediate
i di vicinity
i i i off expansion
i
dams, all of which served to increase the impact.

The reduced dynamic allowance for the fatigue limit state is based
on the premise that average, rather than extreme values, are more
appropriate
pp p when consideringg cumulative damageg from fatigue.
g

10
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

Article S3.6.2 ppermits the traditional elimination of


dynamic load allowance for retaining walls and components
of structures which are below ground, given below, and
provides
id for
f a variable
i bl increase
i i dynamic
in d i load
l d allowance
ll
for culverts and other buried structures, depending on the
depth of earth fill.
fill

Where:
DE = the minimum depth of earth cover
above the structure (mm)

11
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

2.2. Number of design lane (S3.6.1.1.1)

W = clear roadwayy width

CaTUeTA

ebII
ebI Traffic lane < 3600mm; N=cnY
eb cMnn Traffic lanes.
lanes

12
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

2.3. Multiple Presence of Live Load

eKdwgRbU)ab‘ÍlIetedIm,IeGayrfynþF¶n; (heavy load) elIsBI2


ebIIkTnÞwmKña(elII laneCab;Kña) elIIs<anEtmY
E y mantMMéltUcNas;.
dUdecH
ecñH edIedm,KtbBa©
m,IKitbBallkNHenHenAkgkarKNna
ÚllkçNHenHenAkñúgkarKNna ASSHTO
A3.6.1.1.2 eGayGñkKNna eRbI emKuNmYy sMrab;bnßyGMeBI rbs;bnÞúk.

cMnYn loaded lanes Multiple Presence Factor

1 1,20
2 1,00
3 0 85
0,85
>3 0,65

13
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

Design
Truck Load

14
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

Design
Tandem Load

15
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

Design
Lane Load

16
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

2.4. KNnam:Um:g;GviC¢manFMbMputelITMr
eyIgKNnaedayyk 90%én design truck 2 XøatKñacMgay15m rvag
kg;mux nig kg;eRkay rbs; design truckTaMg2 bUknwg design lane
load 90%.
eKykKMlatrvag bnÞúk 145kN rbs; truck nimYy²esμInwg 4,3m.

17
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

2.5. Tire contact area (S3.6.1.2.5)


( )

18
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

3. Fatigue
g Load
Fatigue load Ca truck load xusBI truck load elIkmun Rtg;eyIgyk
cMgayrvagbnÞúk 145kN esμI 9m. eyIgpÞúk truck cMnYnmYy elIEtmYy lane.
Frequency rbs;bnÞúkenH ykesμI ADTTSL ehIyEdl :

Edl
p: KNnaedayeRbItaragxageRkam
KNnaedayeRbtaragxageRkam

19
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

ADTT = average daily truck traffic rab;enAkñúg mYyTisrbs;cracrN_.


ADT = Average daily traffic

((ASSHTO,
SS O,
Table C3.6.1.4.2-1)

20
Dr. KEO Sam Ang Tel: 089 555 710 E-mail: keo_samang@yahoo.com

4 Pedestrian Load
4.

- bnÞ
bnkrbs;
úkrbsGñGkefI
kefμreCIeCgg = 3,6
3 6 kN/m2;

- manGMeBIelI sidewalk EdlenACab;CamYypøÚvLan kñúgkrNIs<anføl;;


- ebIsinCakrNI s<ansMrab;efμIreCIg eyIgeRbItMél = 4,1 kN/m2;

21

You might also like