DE-QC-IT-S01 (Inspection & Test Plan)
DE-QC-IT-S01 (Inspection & Test Plan)
Standards / Testing
Things To Be Checks Characteristics /
Process Responsibility Frequency Specification / Method / Remark
Checked Conditions
Reference Equipment
Incoming / Project Manager / 1. All Goods 1. Quantity & Type As Per Every 1. Drawings / 1. Visual; PO & DO
Outgoing Received; DO; Delivery. Specification / 2. Calculation;
Material Civil Engineer / 2. Storing/ 2. Quality - Approved As BQ. 3. Measuring
Site Supervisor Stacking. Accordance To Sample 2. PO / COA. Tape.
Or Specification, Clean,
Tidy & Rigidity;
3. Arrangement - Safe,
Traceable & Working
Distance.
Setting Out Project Manager / 1. Boundary Peg.; 1. Level; Every Block, 1. Licensed 1. Theodolite; Pile Point
2. Control Point / 2. Coordinate Point; Every Floor. Surveyor. 2. Dumpy Numbering
Civil Engineer / Profile Board. 3. Orientation. Level; Layout
Site Supervisor 3. Measuring
Tape;
4. Plumb Bub.
Piling Project Manager / 1. Pile Point; 1. Pile Position & Pitching; Every Pile 1. Drawings- 1. Visual & DE-QC-IT-
2. Machine; 2. Hammer & Verticality; Point Or As Foundation Counting; F01_Piling
Civil Engineer / 3. Join; 3. Welding Thickness / Per Layout & Pile 2. Spirit Level Inspection
Site Supervisor 4. Pile Set; Sizes Of Sleeve; Engineer’s Group Detail. Rule; Form
5. Load Testing. 4. Penetration per No. Of Instruction. 3. Pressure
Blows; Gauge,
5. Correct Load Test Ruler &
Equipment Testing; Dumpy
6. Correct Calibration Level;
Requirement As Per 4. Measuring
Proposal. Tape.
Excavation Project Manager / 1. Excavated / 1. To Require Reduce Every Unit. 1. Dumpy DE-QC-IT-
1. Drawings;
/ Back Back Filled Level; Level & F02_Earthwo
2. Specifications.
Filling Civil Engineer / Level; 2. Correct Material; Staff. rk Inspection
Site Supervisor 3. Shoring / Slopes / Form
Gradient;
DE-QC-IT-S01
INSPECTION AND TEST PLAN Rev.: 0
Page : 2 of 8
RC Project Manager / 1. Setting Out; 1. Control Point As Per Before / After 1. Measuring
1. Contract DE-QC-IT-
Structure 2. Formwork; Construction Drawings; Casting. Tape;
Specification; F03_RC
Civil Engineer / 3. Reinforcement; 2. Surface Of Formwork & 2. Water Spirit
2. Drawings. Work
Site Supervisor 4. M&E Services; Apply Mould Oil (For Ply Level;
Inspection
5. Concrete Wood); 3. Plum Bulb;
Form
Placing; 3. Dimensions, Level & 4. Visualizing
6. Dismantling Verticality; & Counting;
Formwork; 4. Joints Tight; 5. Slump;
Pre-Arrange
7. Cube Testing. 5. Stability, Rigidity & 6. Cube Mould;
With COW
Cleanliness; 7. Lab Testing.
For Joint
6. Grade, Size, Nos. Of
Inspection.
Bar, Spacing & Lapping;
7. Concrete Cover /
Spacer;
8. Clean;
9. Piping / Wiring Are
Installed Accordingly;
10. Services Opening Size;
11. Concrete Sources &
Suitability-Grade,
Slump, Time Limit (Btw.
Batching & Placing);
12. Vibration Poker (Enough
Vibration);
13. Proper Curing;
14. No Damage To
Concrete;
15. Achieve Required
Strength.
Common Project Manager / 1 Setting Out; 1. Correct Position & Every Unit. 1. Sprit Level / DE-QC-IT-
1. Specification;
Brickwork / 2 Quality Of Alignment; Plumb; F04_Brickwo
2. Drawings.
Block Work Civil Engineer / Material 2. Appropriate Cement 2. Measuring rk Inspection
Site Supervisor Preparation; Mortar Mixing Ratio As Tape. Form
3 Quality Of Per Contract;
Craftsmanship. 3. Type Of Bonding /
Jointing, Reinforcement
(Exmet @4 Course,
Dowel Bars, Stiffener &
Lintel) & dpc;.
4. Verticality.
DE-QC-IT-S01
INSPECTION AND TEST PLAN Rev.: 0
Page : 3 of 8
Steel Civil / Project Steel structure 1. Verticality & level Every unit 3. Pre drawing 1. Measuring DE-QC-IT-
Structure (if Engineer installation. 3. Welding joints tape. F05_Structur
any) 4. Tightness of bolts and 6. Level meter al Steel
nuts 7. Visual Inspection
5. Spacing per drawing Form
Roof Tile/ Civil / Project 1. Roofing 1. Alignment Every unit 1. Pre drawing Visual DE-QC-IT-
Vinyl Engineer installation 2. Joints and F06_Vinyl
3. Skirting specifications Sheet Tile
4. No broken roof or crack Inspection
vinyl tile sheet Form
Wall Project Manager / 1. Quality of 1. At Least 3 Days After 1. Before 1. Long Ruler. DE-QC-IT-
1. Specification;
Plastering Craftsmanship. Completion Of Wall; Commenci F07_Plasteri
2. Drawings.
Civil Engineer / 2. All Concealed Piping & ng Work; ng Inspection
Site Supervisor Wiring Are Installed; 2. Every Form
3. Cement Mortar Mixing Unit.
Ratio As Per Contract
Specification;
4. Applying First & Finishing
Coat Technique;
5. Thickness;
6. Surface Leveling & Towel
To Evenness;
7. Plastering Joint If Area
Too Substantial;
8. Groove Line.
Screeding / Project Manager / 1. Check 1. Cement Mortar Mixing Every Unit. 1. Ruler; DE-QC-IT-
1. Specification;
Rendering Screeding For Ratio; 2. Caliper F08_Screedi
2. Drawings.
Civil Engineer / Various Floor 2. Required Finish Floor Needle for ng Inspection
Site Supervisor Finishes; Level; Measuring. Form
2. Preparation; 3. Concrete Surface
3. Rendering To Cleanliness;
Finish. 4. Joints;
5. Finish To Fall Where
Minimum Thick Shall Not
Be Less Than 13mm At
Any Surface.
Floor Tiling Project Manager / 1. Preparation; 1. Position; Every Unit. 1. Long Ruler.
1. Specification; DE-QC-IT-
Work 2. Laying; 2. Check Bonding Surface 2. Level gauge
2. Drawings. F09_Floor
Civil Engineer / 3. Finishing. Cleanliness;
Tiling
Site Supervisor 3. Check Tiles Quality-Size,
DE-QC-IT-S01
INSPECTION AND TEST PLAN Rev.: 0
Page : 4 of 8
Wall Tiling Project Manager / 1. Preparation; 1. Level & Position; Every Unit. 1. Long Ruler.
1. Specification; DE-QC-IT-
Work 2. Laying; 2. Check Bonding Surface 2. Level gauge
2. Drawings. F10_Wall
Civil Engineer / 3. Finishing. Cleanliness;
Tiling
Site Supervisor 3. Check Tiles Quality-Size,
Inspection
Form
Color & Type As Per
Approved Sample;
4. Cement Mortar Mixing
Ratio;
5. Laying Tiles To Fall;
6. Size Of Joints Are
Consistent;
7. Evenness Of Tiles.
Painting Project Manager / 1. Preparation; 1. Color & Quality Of Paint Every Unit. Nil DE-QC-IT-
1. Specification;
2. Finishing. For Undercoat & F11_Painting
2. Drawings;
Civil Engineer / Finishing Coat As Per Inspection
3. Architect’s
Site Supervisor Architect’s Approval; Form
Material
2. Mixing With Appropriate
Approval List.
Admixture As Per
Contract Specification;
3. Preparing For Surface;
4. Color Appearance &
Evenness.
Sewerage Project Manager / 1. Material 1. Appropriate type of Every day 1. Visual DE-QC-IT-
1. Specification;
Pipe Work material F12_Sewera
2. Setting 2. Drawings / 2. Measuring
Civil Engineer / ge Pipe Work
Out 2. Proper setting & Shop tape
Site Supervisor Inspection
positioning Drawings;
3. Excavatio Form
n / Level 3. Level of excavation
4. Shoring / 4. Correct shoring / slopes
DE-QC-IT-S01
INSPECTION AND TEST PLAN Rev.: 0
Page : 5 of 8
Electrical Project Manager / 1. Cabling / 1. Cable Tray / Trunk-ing / Every Unit. 1. Specification; Provided By DE-QC-IT-
Works Wiring. Concealed Conduit 2. Drawings / Sub- F13_Electric
Civil Engineer / 2. Main / Sub- Distribution Route As Per Shop Contractor. al Work
Site Supervisor Switch Board / Shop Drawing; Drawings; (Internal)
TNB Meter; 2. Brackets, Hanger, 3. Approved Inspection
3. Lighting / Support; Sample. Form
Power Outlet; 3. Cable Type & Size;
DE-QC-IT-
4. Fitting; 4. Extra For Connection;
F14_Electric
5. Testing. 5. Appropriate Cable Joint;
al Work
6. Color Shall Be Referred
(External)
To Contract
Inspection
Specification;
Form
7. Making Good Of Opening
& Hacking;
8. Appropriate Final
Connection;
9. Approved Switchboard;
10.Location As Per Shop
Drawing, Flush-Fronted
(Refer To Specification),
Cable Entry, Etc.;
11.Final Position & No. Of
Outlet;
12.Control Switches;
13.Approved Fittings;
14.Appropriate Installation;
15.Switchboard-Polarity
Test;
16.Mega Test-Earth
Continuity Test.
DE-QC-IT-S01
INSPECTION AND TEST PLAN Rev.: 0
Page : 6 of 8
External Project Manager / 1. Parameter 1. Cement Mortar Mixing Every Unit. 1. Specification; Nil DE-QC-IT-
Work Drain & Apron. Ratio; 2. Shop Drawing; F15_Perimet
Civil Engineer / 2. Chain Link 2. Gradient / Lay To Fall; 3. Detail er Drain And
Site Supervisor Fencing. 3. Approved PC Drain; Drawing; Apron
4. Level; 4. Architect’s Inspection
5. Approved Fencing - Type, Approved Form
Size & Color; Sample.
6. Approved Gate;
7. Stanchion Size As Per
Drawing & Depth Below
The Earth;
8. Angle Bracing;
9. Welding.
DE-QC-IT-
Plumbing Project Manager / 1. Pipe Work; 1. Fabrication Shall Be In Every Unit. 1. Shop Provided By
F16_Plumbin
Works 2. Sanitary Accordance To Drawings; Sub-
g Work
Civil Engineer / Fittings; Specification & Approved 2. Specification; Contractor.
Inspection
Site Supervisor 3. Testing. Shop Drawings; 3. BQ;
Form
2. Appropriate Joints With 4. Approved
Suitable Connection & Sample.
Support;
3. Allow Opening & Making
Good Defect;
4. Approved Valves &
Location;
5. Approved Fittings As Per
Specification / Approved
Sample By Architect;
6. Location Orientation;
7. Support With Appropriate
Bracket / Hanger;
8. Appropriate Connection
To Incoming Pipe & Out
Going Soil / Waste Pipe;
9. Pressure Testing.
Ironmonger Project Manager / 1. Compliance to 1. Compliance to relevant Every Unit. 1. Visual DE-QC-IT-
1. Specifications
y Work relevant standard standard 2. Manual F17_Ironmon
Civil Engineer / 2. Wastage 2. No wastes of extra sets testing gery
Site Supervisor 3. Clearing of 3. Clearing of site after Inspection
Rubbish completion Form
DE-QC-IT-S01
INSPECTION AND TEST PLAN Rev.: 0
Page : 7 of 8
Nails.
Door And Project Manager / 1. Frame 7. Appropriate type of Every unit 3. PE-PR-W08 3. Plump DE-QC-IT-
Window fabrication material-timber, 4. Specification 4. Measureme F21_Door &
Frame Civil Engineer / 2. Frame aluminum or steel frame 5. Drawings or nt tape Window
Site Supervisor Installation 8. Dimension size shop drawings Frame
9. Protection tape/ bracing 6. Approved Inspection
support sample Form
10. Position, alignment &
level
11. Fasteners, i.e., straps
anchor bolts, brackets &
lugs