Inspection & Test Plan for Screed Works

Project Name : Bluewaters Residential Development

Client : Al Shafar General Contracting LLC

Sub-Contractor : In Out Concepts General Trading LLC

Location : JBR Dubai

This ITP Accompanies the Method statement:

RESPONSIBI
I/T NO SEQUENCE OF ACTIVITY DESCRIPTION METHOD SUBMITTAL NUMBER FREQUENCY SUB- MAIN
CONTRACTOR CONTRACT

1 Approved shop drawings use Shopdrawing Document Review Once R A

2 Check Method Statement Method Statement Visual Once - R

3 Material delivery and Approval Material Inspection Visual/Site Engr. Daily R A

4 Mock-up Acceptance and Approval Method Statement Visual Once - A

5 Surface Preparation Method Statement Visual/Site Engr. Daily - W

6 Application of Screed Inspection Request Visual/Engineers per IR - W

7 Curing of Screed Method Statement Visual/Engineers Daily - W

8 Verification and acceptance Method Statement Visual/Engineers Daily - A

9 Final Inspection & monitoring Inspection Request Visual/Engineers per IR - R

A - Hold Point - Work cannot proceed before it is signed off by a specified person from that group
Prepared by: In-Out Concepts General Trading LLC Date: May 10, 2016 W - Witness Point - The activity or test must be witnessed by the person or organiza
to which it applies
R - Review
O - Obeservation

SD - Shop Drawing
MS - Material Submital
ME - Method Statement
SA - Sub-contractor
Approval
RESPONSIBILITY
MAIN
CLIENT
CONTRACTOR

A R

R R

A R

A R

W R

W R

W R

A R

R R

cannot proceed before it is signed off by a specified person from that group
W - Witness Point - The activity or test must be witnessed by the person or organization

O - Obeservation