NORTH WESTERN RAILWAY

Divisional Office
Jaipur

No. NWR-JP-2023-WL-450 Date .08.2023

Sr. Manager,
Suncity Projects Pvt. Ltd.,
LGF-10, Vasant Square, Plot-A, Sector-B, Pocket-V,
Community Centre, Vasant Kunj, New Delhi - 110070

Sub.:- Permission for starting work of 33 kV underground Power Line Track Crossing (PLTC)
between RE – KWMB stations at IR KM/(TP/OHE) 80/19 – 80/22 in RE-DLI Section.
Ref.:- 1. Online RBCS Portal Case No. NWR-JP-2023-WL-450 of Railway Track Crossing
<<<>>>
In reference to above cited subject, permission for work starting is given and you are permitted
to start the work as per approved drawing. Before starting the work, you should meet to SSE/P/RE,
SSE/TRD/RE, SSE/Sig/RE, SSE/Tele/RE and SSE/P-Way/RE. Work should be done in presence of
SSE/P/RE, SSE/TRD/RE, SSE/Sig/RE, SSE/Tele/RE and SSE/P-Way/RE.

After completion of work, final Joint Inspection report with signatures of Railway SSEs, and
compliance Certificate should be sent to this office so that permission of energization can be given
accordingly.

Information of line block period should be endorsed in final Joint Inspection report. All
expenditure will be recovered from Sr. Manager, Suncity Projects Pvt. Ltd., New Delhi, if any
Railway property is damaged from your side. Power line should not be energized without written
permission of undersigned.

Line Block period required: 01:00 hrs. (One hour).

Sr. DEE/G/JP

Copy to –
Sr.DOM/JP - For information & necessary action please.
Sr.DSTE/JP - For information & necessary action please.
Sr.DEE/TRD/JP - For information & necessary action please.
DEN/E/JP - For information & necessary action please.
ADEN/AWR - For information & necessary action please.
SSE/P-Way/RE -For necessary action please.
SSE/Sig/ RE - For necessary action please.
SSE/Tele/ RE - For necessary action please.
SSE/TRD/ RE - For necessary action please.
SSE/P/RE - For co-ordination and ensure guidelines of D.O.no. EL/253/1/W6 Dated 29.11.17

Signature Not Verified Signature Not Verified


Digitally signed by Digitally signed by SHIV
SANTOSH KUMAR GUPTA RAM MEEMROTH
Date: 2023.08.17 17:11:42 Date: 2023.10.03 18:37:45