A Shift-12.02.2024 Report1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A-SHIFT REPORT (Date: 12/02/2024)

BLR-1 BLR-2 BLR-3 HRSG Total


Boiler Steam Load (Current) 147 145 142 58 492
Mills in Service ACD ABD ABC HRSG NG flow
Mill Standby B - D 556
Mill/RCF under maint. - C - - BLR-4 Load
RCF on AUTO with Com. Stm. Press - - - - 0
Igniter NG support - - - Venting
Burner NG support - - - 2
BHEL BLRS NG CONS. (A+B+C shift) 4376 - - 4376
Ash Truck Dispatched (A+B+C shift) 8 - - 8
BLR-1 BLR-2 BLR-3 HRSG pH / Cl2
CBD Silica 0.5 0.4 0.4 0.4 CPP
Main Steam Silica 0.01 0.01 0.01 0.01 7/0
EP Field Out (A - PASS) - - 4 -- CPSU
EP Field Out (B - PASS) 2 - 5 -- 6.9/2.5
TG-1 TG-2 GT Import Total
Current Power Generation 12.00 0.00 23.00 15.00 50.00
Power Import (A+B+C shift) 114.12 - - 114.12
Power Export (A+B+C shift) 0.00 0.00 0.00 0.00
Bunkering : (Indian + Imported + Rejection) 0 1224 10 1234
Boiler : 1 Steaming Normal.
EP A path inlet damper actuator elect side cable connection done & inst connection will be done.
LRSB 27 traverse motor not operate during trial.Elect side checking required.
RCF B hinge gate replaced.Plate valve will open.
Boiler : 2 Steaming Normal.
LRSB 27 & 28 operation sequence started at the same time.Same observed in field, Elect side checking U/P
RCF C axial movement observed.Same checking u/p.
Clinker grinder frequent overload.Mech side checking u/p.
Boiler : 3 Steaming Normal.
Mill D vibrator Motor bottom side flange missing bolts provided and also tightning done.
Ash : Normal.
GT : Running Normal.
Inlet air filter North side first header SOV 21Y23 detached. For that both sides filter removal required.
Oil Centrifuge bowl cleaning job u/p.
HRSG : Steaming Normal.
GFD diverter damper MOV trial taken in presence of Elect. but MOV not operated. Further checking
will be done by elect after availability of third party
SOx, NOx analyzer routine calibration u/p
TG-1 : Running normal
Turbine at 20 & 25 MWH trial taken. Vacuum is -0.83KG/CM2 at 25MWH load
CEP-1 high gland leakage. Gland external tightening done and again pump taken in service.
Oil Centrifuge bowl cleaning job u/p.
TG-2 : U/S/D.
BLR-4 : U/S/D.
CBD conductivity analyzer replacement job u/p.
NGCT : Normal.
CT fan 4 motor PM job u/p. CT cell 2 taken inline and CT fan stopped.
CL2 tonner is empty. Connection to be C/O.
CHP : Normal.

You might also like