HOLISTIC PROJECT SUMMARY OF BOQ 2016EC.

SUMMARY OF BILL OF QUANTITIES


FOR
G+1 RESIDENTIAL BUILDING

A-SUB STRUCTURE

1 Excavation and earth work Birr 504,531.54


2 Concrete work Birr 1,425,824.65
3 Reinforcement bar work Birr 332,436.26
4 Form work Birr 103,534.46
B. SUPER STRUCTURE

5 Concrete work Birr 1,322,216.98


6 Rianforcement work Birr 312,729.01
7 Form work Birr 162,324.48
8 HCB work Birr 95,465.30
9 Carpentry work Birr 878,186.38
10 Glessing work Birr 401,491.79
11 Finishing work Birr 711,234.53
12 Plastering work Birr 4,033,186.69
13 Painting work Birr 3,533,721.14
14 Electrical inistaletion Birr 37,446.14
15 Sunitary inistaletion Birr 21,348.37

GRAND TOTAL Birr 13,875,677.71


Vat(15%) Birr 2081351.656
Overhead Cost(10%) Birr 1387567.771
GRAND TOTAL WITH OVERHEAD
COST & VAT......... Birr 17,344,597.14