1.1 Lantai 1
a. Peralatan Utama Controller VRF/VRV
- PC Server requirements : 1,00 unit
- Windows 10 Profesional
- CPU : Intel Pentium core i3
- Memory : 4GB
- HDD : 500GB
- Monitor TV LED 40"
- Converter RS 485 3,00 unit
- Management system software 1,00 unit
- Communication Adaptor 3,00 unit
- Biaya Setting dan Pemasangan 1,00 ls
14
UP2B JAWA TIMUR
15
UP2B JAWA TIMUR
Sub Jumlah a
Sub Jumlah b
16
UP2B JAWA TIMUR
Sub Jumlah c
d. Instalasi Listrik
- Kabel Power Unit Indoor AC-VRF/VRV Ke Panel Listrik PP-AC.1 :
- Kabel NYM 3 x 2,5 mm² 980,00 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 362,96 bt
- Pipa Flexible PVC-HI dia.20 mm 147,00 m¹
- Klem Pipa PVC-HI dia.20 mm 241,98 bh
- Sambungan Pipa PVC-HI dia.20 mm 725,93 bh
- Kabel Power Unit Exhaust Fan :
- Kabel NYM 3 x 2,5 mm² 66,00 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 24,44 bt
- Pipa Flexible PVC-HI dia.20 mm 33,00 m¹
- Klem Pipa PVC-HI dia.20 mm 16,30 bh
- Sambungan Pipa PVC-HI dia.20 mm 48,89 bh
- Kabel Control Unit AC VRF/VRV :
- Kabel UTP AWG 18 shielded 1.000,00 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 370,37 bt
- Pipa Flexible PVC-HI dia.20 mm 13,50 m¹
- Klem Pipa PVC-HI dia.20 mm 246,91 bh
- Sambungan Pipa PVC-HI dia.20 mm 740,74 bh
Sub Jumlah d
1.2 Lantai 2
a. Indoor Unit Air Conditioning Sistem VRF/VRV, R-401A
- Ruang Manager
Kapasitas : 24.900 btu/h, type 4 Way Cassetted 1,00 unit
Air Flow (H/M/L) L/s : 367/283/233, (9,52 (3/8") x 15,88 (5/8"))
Rating Power : 0,06 kW, 230V, 50 Hz
Accessories : Wireless Remote Controller
- Ruang Sekretaris
Kapasitas : 7.500 btu/h, type Wall 1,00 unit
Air Flow (H/M/L) L/s : 150/125/108, (6,36 (1/4") x 12,7 (1/2"))
Rating Power : 0,03 kW, 230V, 50 Hz
Accessories : Wireless Remote Controller
- Ruang Tamu
Kapasitas : 7.500 btu/h, type Wall 1,00 unit
Air Flow (H/M/L) L/s : 150/125/108, (6,36 (1/4") x 12,7 (1/2"))
Rating Power : 0,03 kW, 230V, 50 Hz
Accessories : Wireless Remote Controller
- Ruang Tunggu & koridor
Kapasitas : 7.500 btu/h, type Wall 2,00 unit
Air Flow (H/M/L) L/s : 150/125/108, (6,36 (1/4") x 12,7 (1/2"))
Rating Power : 0,06 kW, 230V, 50 Hz
Accessories : Wireless Remote Controller
- Ruang Manager Opsis
Kapasitas : 15.000 btu/h, type Wall 1,00 unit
Air Flow (H/M/L) L/s : 200/175/142, (6,36 (1/4") x 12,7 (1/2"))
Rating Power : 0,047 kW, 230V, 50 Hz
Accessories : Wireless Remote Controller
- Ruang Printer
Kapasitas : 7.500 btu/h, type Wall 1,00 unit
Air Flow (H/M/L) L/s : 150/125/108, (6,36 (1/4") x 12,7 (1/2"))
17
UP2B JAWA TIMUR
18
UP2B JAWA TIMUR
Sub Jumlah a
Sub Jumlah b
19
UP2B JAWA TIMUR
Sub Jumlah c
d. Instalasi Listrik
- Kabel Power Unit Indoor AC-VRF/VRV Ke Panel Listrik PP-AC.2 :
- Kabel NYM 3 x 2,5 mm² 600,00 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 222,22 bt
- Pipa Flexible PVC-HI dia.20 mm 93,00 m¹
- Klem Pipa PVC-HI dia.20 mm 148,15 bh
- Sambungan Pipa PVC-HI dia.20 mm 444,44 bh
- Kabel Power Unit Exhaust Fan :
- Kabel NYM 3 x 2,5 mm² 42,00 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 15,56 bt
- Pipa Flexible PVC-HI dia.20 mm 21,00 m¹
- Klem Pipa PVC-HI dia.20 mm 10,37 bh
- Sambungan Pipa PVC-HI dia.20 mm 31,11 bh
- Kabel Control Unit AC VRF/VRV :
- Kabel UTP AWG 18 shielded 1.060,00 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 392,59 bt
- Pipa Flexible PVC-HI dia.20 mm 9,00 m¹
- Klem Pipa PVC-HI dia.20 mm 261,73 bh
- Sambungan Pipa PVC-HI dia.20 mm 785,19 bh
Sub Jumlah d
20
UP2B JAWA TIMUR
Sub Jumlah e
21
UP2B JAWA TIMUR
Sub Jumlah a
Sub Jumlah b
Sub Jumlah c
2 PEKERJAAN PEMADAM KEBAKARAN DAN FIRE SUPPRESSION SYSTEM (FM 200 & GENERATOR AEROSOL)
2.1 Lantai 1
a. Instalasi Pemadam Kebakaran
- Pipa BS Schedul 40 ;
- Pipa Ø100 mm (4") - untuk Riser FHB & Sprinkler 12,00 m¹
- Pipa Ø80 mm (3") - untuk FHB & Sprinkler 12,00 m¹
- Pipa Ø65 mm (2 1/2") - untuk FHB (Fire Hose Box) 12,00 m¹
- Pipa Ø25 mm (1") - untuk Sprinkler 528,00 m¹
- Pipa Ø15 mm (1/2") - untuk Sprinkler 26,40 m¹
- Pipa Ø50 mm (2") - untuk Riser Drain 6,00 m¹
- Pipa Ø40 mm (1 1/2") - untuk Test Sprinkler 2,00 m¹
- Untuk Drain, Ø1" 2,00 m¹
- Sprinkler, jenis Microfast Extended Coverage Pendent, Ø1/2" 88,00 bh
(26 GPM), t = 680C, 175 psi
- Branch Control Valve (BCV) Ø80mm (3"), terdiri dari ; 1,00 set
- Water Flow Switch Valve Ø3", UL/FM
- Test & Drain Valve Brass, UL/FM
- Sight glass Ø1", UL/FM
- Pressure Gauge & Gate Valve Ø1/2", UL/FM
- Gate Valve flenged ends Ø3", 16 Bar 1,00 bh
- Check Valve flenged ends Ø3",16 Bar 1,00 bh
- Gate Valve flenged ends Ø2 1/2", 16 Bar 2,00 bh
- Hydrant Box Dalam, lengkap ; 2,00 unit
a. Hydrant box (dengan kunci pada pintu)
b. Universal swing fire hose reel
c. Fire hose, ukuran 2 1/2" x 30 m', pulining - polyurethane
atau synthetic fiber woven outlet jeeket 555 psi
d. Straight Nozle dia. 65 mm (2 1/2") dgn variasi pancaran
e. Kopling inlet YVH dia. 65 mm (2 1/2")
22
UP2B JAWA TIMUR
Sub Jumlah a
2.2 Lantai 2
a. Instalasi Pemadam Kebakaran
- Pipa BS Schedul 40 ;
- Pipa Ø100 mm (4") - untuk Riser FHB & Sprinkler 8,00 m¹
- Pipa Ø80 mm (3") - untuk FHB & Sprinkler 12,00 m¹
- Pipa Ø65 mm (2 1/2") - untuk FHB (Fire Hose Box) 12,00 m¹
- Pipa Ø25 mm (1") - untuk Sprinkler 270,00 m¹
- Pipa Ø15 mm (1/2") - untuk Sprinkler 13,50 m¹
- Pipa Ø50 mm (2") - untuk Riser Drain 4,00 m¹
- Pipa Ø40 mm (1 1/2") - untuk Test Sprinkler 2,00 m¹
- Untuk Drain, Ø1" 2,00 m¹
- Sprinkler, jenis Microfast Extended Coverage Pendent, Ø1/2" 45,00 bh
(26 GPM), t = 680C, 175 psi
- Branch Control Valve (BCV) Ø80mm (3"), terdiri dari ; 1,00 set
- Water Flow Switch Valve Ø3", UL/FM
- Test & Drain Valve Brass, UL/FM
- Sight glass Ø1", UL/FM
- Pressure Gauge & Gate Valve Ø1/2", UL/FM
- Gate Valve flenged ends Ø3", 16 Bar 1,00 bh
- Check Valve flenged ends Ø3",16 Bar 1,00 bh
- Gate Valve flenged ends Ø2 1/2", 16 Bar 2,00 bh
- Hydrant Box Dalam, lengkap ; 2,00 unit
a. Hydrant box (dengan kunci pada pintu)
b. Universal swing fire hose reel
c. Fire hose, ukuran 2 1/2" x 30 m', pulining - polyurethane
atau synthetic fiber woven outlet jeeket 555 psi
d. Straight Nozle dia. 65 mm (2 1/2") dgn variasi pancaran
e. Kopling inlet YVH dia. 65 mm (2 1/2")
f. Landing (Angle) Valve dia. 65 mm (2 1/2 ") x 2 1/2".
- Air Release Valve flenged ends Ø1",16 Bar 2,00 bh
- Penyambung Pemipaan dan Fittings jenis BS Schedul 40 1,00 lot
lengkap dengan (tanpa) flange yang sesuai dengan standar
peralatan pemipaan pada tekanan kerja 16 bar dan SNI,
terdiri dari ;
- Elbow, Socket, Tee
- Flenges Buta, Flenges Biasa
- Gasket
- Mur baut
- Pengelasan pipa luar dalam utk. Flenges
- Pengelasan Pipa BS Schedul 40
- Penyanggah/penggantung pemipaan vertikal & horizontal 1,00 lot
Sub Jumlah a
23
UP2B JAWA TIMUR
Sub Jumlah b
3.2 Lantai 2
a. Instalasi air bersih
- Pemipaan Air Bersih (Jenis Polypropelene PN16)
Pipa Ø 40 mm (1 1/2") 4,00 m¹
Pipa Ø 32 mm (1 1/4") 4,00 m¹
Pipa Ø 25 mm (1") 24,00 m¹
Pipa Ø 20 mm (3/4") 24,00 m¹
Pipa Ø 15 mm (1/2") 112,00 m¹
- Peralatan Air Bersih (Pressure : 10 Kg/Cm2)
Ball Valve dia.1 1/2", screw, 10 Bar 2,00 bh
Ball Valve dia.1 1/4", screw, 10 Bar 2,00 bh
Ball Valve dia.1", screw, 10 Bar 7,00 bh
Ball Valve dia.3/4", screw, 10 Bar 2,00 bh
Ball Valve dia.1/2", screw, 10 Bar 2,00 bh
Check Valve dia.1 1/2", screw, 10 Bar 2,00 bh
Check Valve dia.1 1/4", screw, 10 Bar 2,00 bh
Kran Wastafel standar dia.15 mm 6,00 bh
Kran Urinoir standar dia.15 mm 3,00 bh
Kran WC duduk standar dia.15 mm 7,00 bh
Kran Jet whoser WC standar dia.15 mm 7,00 bh
Kran Kitchent Sink standar dia.15 mm 2,00 bh
Kran Dinding standar dia.15 mm 3,00 bh
- Material Bantu, terdiri dari ; 1,00 lot
Elbow, Tee, Fitting, Reduser, Penyanggah pipa & U-Bolt,
pelindung & sparing pipa, dan accessories liannya.
Sub Jumlah a
b. Instalasi Air Buangan (Air kotor, air bekas, air hujan & Vent)
- Pemipaan Air Buangan (PVC-AW, P : 10 Kg/Cm2)
Pipa Ø 100 mm (4") 148,00 m¹
Pipa Ø 80 mm (3") 14,00 m¹
Pipa Ø 50 mm (2") 46,00 m¹
- Pemipaan Vent (PVC-D, P : 8 Kg/Cm2)
Pipa Ø 50 mm (2") 28,00 m¹
Pipa Ø 25 mm (1") 44,00 m¹
Vent cup dia.50 mm (Bahan PVC) 7,00 bh
Vent cup dia.25 mm (Bahan PVC) 11,00 bh
- Material Bantu, terdiri dari ; 1,00 lot
Elbow, Tee, Reduser, lem, klem & penyanggah pipa,
pelindung & sparing pipa, dan accessories liannya
serta anti karat untuk penggantung pipa.
24
UP2B JAWA TIMUR
Sub Jumlah b
Sub Jumlah a
b. Instalasi Air Buangan (Air kotor, air bekas, air hujan & Vent)
- Pemipaan Air Buangan (PVC-AW, P : 10 Kg/Cm2)
Pipa Ø 100 mm (4") 60,00 m¹
- Pemipaan Vent (PVC-D, P : 8 Kg/Cm2)
Pipa Ø 50 mm (2") 28,00 m¹
Vent cup dia.50 mm (Bahan PVC) 3,00 bh
Sub Jumlah b
Jumlah Pekerjaan Plambing & Sanitasi (jumlah 3.1 s/d jumlah 3.3)
JUMLAH TOTAL I
25
UP2B JAWA TIMUR
1 PEKERJAAN KELISTRIKAN
1.1 Lantai 1
a. Panel - Panel Listrik
- PHB-Gedung - Prioritas (Back-up Genset) 1,00 unit
- LP-1 (Penerangan) - Non Prioritas 1,00 unit
- PP-1 (Stop Kontak) - Non Prioritas 1,00 unit
- PP-AC.1 - Non Prioritas 1,00 unit
- PP-1.1 (Penerangan) - Prioritas (Back-up Genset) 1,00 unit
- PP-1.2 (Stop Kontak) - Prioritas (Back-up Genset) 1,00 unit
- PP-1.3 (Indoor Unit AC) - Prioritas (Back-up Genset) 1,00 unit
- PP-1.4 (Penerangan) - Prioritas (Back-up Genset) 1,00 unit
- PP-1.5 (Stop Kontak) - Prioritas (Back-up Genset) 1,00 unit
- PP-1.6 (Indoor Unit AC) - Prioritas (Back-up Genset) 1,00 unit
- ACPP-1.1 (Penerangan&Stop Kontak) - Prioritas (Back-up Genset) 1,00 unit
- ACPP-1.1 (Indoor Unit AC) - Prioritas (Back-up UPS) 1,00 unit
- ACPP-1.3 (Server UI DTS) - Prioritas (Back-up UPS) 1,00 unit
- AC.DB-1 (Unit PAC.1), 2x41,31kW - Prioritas (Back-up Genset) 1,00 unit
- AC.DB-2 (Unit PAC.2), 2x41,31kW - Prioritas (Back-up Genset) 1,00 unit
Sub Jumlah a
b. Distribusi Kabel
- Kabel dari Panel PHB-Gedung ke :
- LP-1 (Penerangan) : NYY 4 x 10 mm² 9,00 m¹
- PP-1 (Stop Kontak) : NYY 4 x 16 mm² 9,00 m¹
- PP-AC.1 : NYY 4 x 10 mm² 9,00 m¹
- PP-1.1 (Penerangan) : NYY 4 x 10 mm² 35,00 m¹
- PP-1.2 (Stop Kontak) : NYY 4 x 16 mm² 35,00 m¹
- PP-1.3 (Indoor Unit AC) : NYY 4 x 10 mm² 35,00 m¹
- PP-1.4 (Penerangan) : NYY 4 x 10 mm² 35,00 m¹
- PP-1.5 (Stop Kontak) : NYY 4 x 16 mm² 35,00 m¹
- PP-1.6 (Indoor Unit AC) : NYY 4 x 10 mm² 35,00 m¹
- Kabel dari Panel ACDB-MS (Master Server) ke :
ACPP-1.1 (Penerangan&Stop Kontak) : NYY 4 x 10 mm² 28,00 m¹
ACPP-1.1 (Indoor Unit AC) : NYY 4 x 6 mm² 28,00 m¹
ACPP-1.3 (Server UI DTS) : NYY 4 x 10 mm² 28,00 m¹
- Kabel dari Panel ACDB-UPS (Power Plan) ke :
AC.DB-1 (Unit PAC.1) : NYY 4 x 120 mm² 60,00 m¹
AC.DB-1 (Unit PAC.2) : NYY 4 x 120 mm² 60,00 m¹
- Material Bantu, terdiri dari ; 1,00 lot
Sepatu kabel, Mur-Baut Tembaga, Isolasi kabel schoon,
isolasi pengikat kabel & Klem kabel.
Sub Jumlah b
c. Instalasi Kabel Pembumian
Pengadaan, pemasangan dan pengujian seluruh pekerjaan
Instalasi kabel pembumian lengkap dgn. Jenis&type kabel,
sepatu kabel, jenis & type sambungan kabel dgn Weld Copper,
Busbar Copper, Copper Rod, galian dan pelindung kabel,
Bak kontrol beton bertulang dan accessories lainnya sesuai
gambar rencana & spesifikasi teknis
26
UP2B JAWA TIMUR
Sub Jumlah c
d. Instalasi Kabel Rak
- Straigh Ladder (600 x 100 x 2 ) mm, 3 meter 8,00 bh
- Straigh Ladder (300 x 100 x 2 ) mm, 3 meter 11,00 bh
- Elbow ladder (600 x 100 x 2 ) mm 2,00 bh
- Elbow ladder (300 x 100 x 2 ) mm 2,00 bh
- Tee ladder (600 x 100 x 2 ) mm 1,00 bh
- Tee ladder (300 x 100 x 2 ) mm 1,00 bh
- Reduser ladder (600 x 300 x 2 ) mm 2,00 bh
- Inside riser Ladder (600 x 400 x 100) mm 1,00 bh
- Inside riser Ladder (300 x 400 x 100) mm 2,00 bh
- Outside riser ladder (300 x 400 x 100) mm 1,00 bh
Sub Jumlah d
e. Instalasi Penerangan Dan Stop Kontak
- Indirect Lamp I Line Series LED 18W/m 274,00 bh
- Down light LED 8 W Core Line 94,00 bh
- Down light LED 8 W Core Line c/w Battery nicad + Charger - bh
- Down light LED 11 W Core Line 121,00 bh
- Down light LED 11 W Core Line c/w Battery nicad + Charger - bh
- Down light LED 22 W Core Line 162,00 bh
- Down light LED 22 W Core Line c/w Battery nicad + Charger - bh
- RM LED 4x9 W, type TKI, M1 Core Line 48,00 bh
- RM LED 4x9 W, type TKI, M1 Core Line c/w Battery nicad+Charger - bh
- LED 1x18 W, Type Core Line Batten c/w Battery nicad + Charger 8,00 bh
- Exit LED 2x5W c/w Battery nicad + Charger 8,00 bh
- Saklar tunggal, 10A 31,00 bh
- Saklar Ganda, 10A 36,00 bh
- Saklar Tukar (Hotel), 10A 4,00 bh
- Grid Switch 8 gang, 10A 4,00 bh
- Stop kontak 1 phasa, 13A 81,00 bh
- 2 x Stop kontak 1 phasa, 13A, Type Lantai 48,00 bh
- Instalasi penerangan terdiri dari ;
- Kabel NYM 3 x 2,5 mm² 7.158 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 2.651 bt
- Pipa Flexible PVC-HI dia.20 mm 325 m¹
- Klem Pipa PVC-HI dia.20 mm 1.767 bh
- Sambungan Pipa PVC-HI dia.20 mm 5.302 bh
- Instalasi stop kontak terdiri dari ;
- Kabel NYM 3 x 2,5 mm² 2.064 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 764 bt
27
UP2B JAWA TIMUR
Sub Jumlah e
1.2 Lantai 2
a. Panel - Panel Listrik
- PHB-2 - Prioritas (Back-up Genset) 1,00 unit
- ACDB-MS - Prioritas (Back-up UPS) 1,00 unit
- ACDB-PAC - Prioritas (Back-up UPS) 1,00 unit
- LP-2 (Penerangan) - Non Prioritas 1,00 unit
- PP-2 (Stop Kontak) - Non Prioritas 1,00 unit
- PP-AC.2 - Non Prioritas 1,00 unit
- PP-2.1 (Penerangan) - Prioritas (Back-up Genset) 1,00 unit
- PP-2.2 (Stop Kontak) - Prioritas (Back-up Genset) 1,00 unit
- PP-2.3 (Indoor Unit AC) - Prioritas (Back-up Genset) 1,00 unit
- PP-2.4 (Penerangan) - Prioritas (Back-up Genset) 1,00 unit
- PP-2.5 (Stop Kontak) - Prioritas (Back-up Genset) 1,00 unit
- PP-2.6 (Indoor Unit AC) - Prioritas (Back-up Genset) 1,00 unit
- PP-2.7 (Penerangan) - Prioritas (Back-up Genset) 1,00 unit
- ACPP-2.1 (Stop Kontak) - Prioritas (Back-up UPS) 1,00 unit
- ACPP-2.2 (Indoor Unit AC) - Prioritas (Back-up UPS) 1,00 unit
- ACPP-2.3 (Monitor Dispathcer) - Prioritas (Back-up UPS) 1,00 unit
- DCDB-MS - Prioritas (Back-up UPS) 1,00 unit
Sub Jumlah a
b. Distribusi Kabel
- Kabel dari Panel PHB-2 ke :
- PHB-Gedung : NYY 4 x 240 mm² 9,00 m¹
- LP-2 (Penerangan) : NYY 4 x 16 mm² 9,00 m¹
- PP-2 (Stop Kontak) : NYY 4 x 25 mm² 9,00 m¹
- PP-AC.2 : NYY 4 x 16 mm² 9,00 m¹
- PP-2.1 (Penerangan) : NYY 4 x 10 mm² 12,00 m¹
- PP-2.2 (Stop Kontak) : NYY 4 x 16 mm² 18,00 m¹
- PP-2.3 (Indoor Unit AC) : NYY 4 x 10 mm² 18,00 m¹
- PP-2.4 (Penerangan) : NYY 4 x 6 mm² 23,00 m¹
- PP-2.5 (Stop Kontak) : NYY 4 x 10 mm² 23,00 m¹
- PP-2.6 (Indoor Unit AC) : NYY 4 x 6 mm² 23,00 m¹
- PP-2.7 (Penerangan) : NYY 4 x 25 mm² 23,00 m¹
- Kabel dari Panel ACDB-MS (Master Server) ke :
ACPP-2.1 (Stop Kontak) : NYY 4 x 10 mm² 23,00 m¹
ACPP-2.2 (Indoor Unit AC) : NYY 4 x 10 mm² 23,00 m¹
ACPP-2.3 (AC VRF/VRV Dispathcer) : NYY 4 x 25 mm² 23,00 m¹
Sub Jumlah b
c. Instalasi Kabel Pembumian
Pengadaan, pemasangan dan pengujian seluruh pekerjaan
Instalasi kabel pembumian lengkap dgn. Jenis&type kabel,
sepatu kabel, jenis & type sambungan kabel dgn Weld Copper,
Busbar Copper, Copper Rod, galian dan pelindung kabel,
Bak kontrol beton bertulang dan accessories lainnya sesuai
gambar rencana & spesifikasi teknis
- Kabel Pembumian dari PHB-2 ke ;
- PHB-Gedung : BCC 150 mm² 9,00 m¹
- LP-2 (Penerangan) : BCC 16 mm² 9,00 m¹
- PP-2 (Stop Kontak) : BCC 25 mm² 9,00 m¹
- PP-AC.2 : BCC 16 mm² 12,00 m¹
- PP-2.1 (Penerangan) : BCC 10 mm² 12,00 m¹
- PP-2.2 (Stop Kontak) : BCC 16 mm² 18,00 m¹
28
UP2B JAWA TIMUR
Sub Jumlah c
d. Instalasi Kabel Rak
- Straigh Ladder (600 x 100 x 2 ) mm, 3 meter 12,00 bh
- Straigh Ladder (300 x 100 x 2 ) mm, 3 meter 6,00 bh
- Elbow ladder (600 x 100 x 2 ) mm 2,00 bh
- Elbow ladder (300 x 100 x 2 ) mm 2,00 bh
- Tee ladder (600 x 100 x 2 ) mm 1,00 bh
- Tee ladder (300 x 100 x 2 ) mm 1,00 bh
- Reduser ladder (600 x 300 x 2 ) mm 2,00 bh
- Inside riser Ladder (600 x 400 x 100) mm 1,00 bh
- Inside riser Ladder (300 x 400 x 100) mm 2,00 bh
- Straigh Tray (400 x 100 x 2 ) mm, 3 meter 12,00 bh
- Straigh Tray (300 x 100 x 2 ) mm, 3 meter 59,00 bh
- Elbow Tray (300 x 100 x 2 ) mm 1,00 bh
- Tee Tray (300 x 100 x 2 ) mm 9,00 bh
Sub Jumlah d
e. Instalasi Penerangan Dan Stop Kontak
- Indirect Lamp I Line Series LED 18W/m 100,00 bh
- Down light LED 8 W Core Line 115,00 bh
- Down light LED 8 W Core Line c/w Battery nicad + Charger - bh
- Down light LED 11 W Core Line 73,00 bh
- Down light LED 11 W Core Line c/w Battery nicad + Charger - bh
- Down light LED 22 W Core Line 101,00 bh
- Down light LED 22 W Core Line c/w Battery nicad + Charger - bh
- RM LED 4x9 W, type TKI, M1 Core Line 30,00 bh
- RM LED 4x9 W, type TKI, M1 Core Line c/w Battery nicad+Charger - bh
- LED 1x18 W, Type Core Line Batten c/w Battery nicad + Charger 10,00 bh
- Exit LED 2x5W c/w Battery nicad + Charger 8,00 bh
- Saklar tunggal, 10A 27,00 bh
- Saklar Ganda, 10A 30,00 bh
- Saklar Tukar (Hotel), 10A 4,00 bh
- Grid Switch 8 gang, 10A 3,00 bh
- Stop kontak 1 phasa, 13A 86,00 bh
- 2 x Stop kontak 1 phasa, 13A, Type Lantai 24,00 bh
- Instalasi penerangan terdiri dari ;
- Kabel NYM 3 x 2,5 mm² 5.220 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 1.933 bt
- Pipa Flexible PVC-HI dia.20 mm 268 m¹
- Klem Pipa PVC-HI dia.20 mm 1.289 bh
- Sambungan Pipa PVC-HI dia.20 mm 3.867 bh
- Instalasi stop kontak terdiri dari ;
- Kabel NYM 3 x 2,5 mm² 1.760 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 652 bt
29
UP2B JAWA TIMUR
Sub Jumlah e
Sub Jumlah a
b. Distribusi Kabel
- Kabel dari Panel PHB-Gedung ke :
- PHB-AC VRF/VRV : NYY 4 x 300 mm² 9,00 m¹
- PP-AT (Penerangan & Stop Kontak) : NYY 4 x 16 mm² 9,00 m¹
- PP-Lift : FRC 4 x 25 mm² 9,00 m¹
- PP-PF : FRC 4 x 16 mm² 12,00 m¹
- PP-BP : NYY 4 x 25 mm² 12,00 m¹
- Kabel dari Panel PP-BP ke :
- PP-BP.1.1 : NYY 4 x 6 mm² 9,00 m¹
- PP-BP.1.2 : NYY 4 x 6 mm² 9,00 m¹
- PP-BP.2.1 : NYY 4 x 6 mm² 23,00 m¹
- PP-BP.2.2 : NYY 4 x 6 mm² 23,00 m¹
- Kabel dari Panel PHB-AC VRF/VRV ke :
- Controller Panel OU-VRF/VRV-1.1(30,27kW) : NYY 4 x 35 mm² 9,00 m¹
- Controller Panel OU-VRF/VRV-1.2(30,27kW) : NYY 4 x 35 mm² 9,00 m¹
- Controller Panel OU-VRF/VRV-2.1(22,21kW) : NYY 4 x 25 mm² 12,00 m¹
- Controller Panel OU-VRF/VRV-2.2(22,21kW) : NYY 4 x 25 mm² 12,00 m¹
- Controller Panel OU-VRF/VRV-2.3(12,73kW) : NYY 4 x 16 mm² 16,00 m¹
- Controller Panel OU-VRF/VRV-2.4 (4,38kW) : NYY 4 x 6 mm² 28,00 m¹
- Controller Panel OU-VRF/VRV-2.5 (4,38kW) : NYY 4 x 6 mm² 28,00 m¹
- Controller Panel OU-VRF/VRV-2.6 (9,47kW) : NYY 4 x 10 mm² 16,00 m¹
Sub Jumlah b
c. Instalasi Kabel Pembumian
Pengadaan, pemasangan dan pengujian seluruh pekerjaan
Instalasi kabel pembumian lengkap dgn. Jenis&type kabel,
sepatu kabel, jenis & type sambungan kabel dgn Weld Copper,
Busbar Copper, Copper Rod, galian dan pelindung kabel,
Bak kontrol beton bertulang dan accessories lainnya sesuai
gambar rencana & spesifikasi teknis
- Kabel dari Panel PHB-Gedung ke :
- PHB-AC VRF/VRV : BCC 185 mm² 9,00 m¹
- PP-AT (Penerangan & Stop Kontak) : BCC 16 mm² 9,00 m¹
- PP-Lift : BCC 25 mm² 9,00 m¹
- PP-PF : BCC 16 mm² 12,00 m¹
- PP-BP : BCC 25 mm² 12,00 m¹
- Kabel dari Panel PP-BP ke :
- PP-BP.1.1 : BCC 6 mm² 18,00 m¹
- PP-BP.1.2 : BCC 6 mm² 23,00 m¹
- PP-BP.2.1 : BCC 6 mm² 23,00 m¹
- PP-BP.2.2 : BCC 6 mm² 23,00 m¹
- Kabel dari Panel PHB-AC VRF/VRV ke :
- Controller Panel OU-VRF/VRV-1.1(30,27kW) : BCC 35 mm² 18,00 m¹
- Controller Panel OU-VRF/VRV-2.1(22,21kW) : BCC 25 mm² 23,00 m¹
30
UP2B JAWA TIMUR
Sub Jumlah c
d. Instalasi Penerangan Dan Stop Kontak
- Indirect Lamp I Line Series LED 18W/m 72,00 bh
- Down light LED 85 W Core Line 28,00 bh
- Down light LED 85 W Core Line c/w Battery nicad + Charger - bh
- LED 1x18 W, Type Core Line Batten 27,00 bh
- LED 1x18 W, Type Core Line Batten c/w Battery nicad+Charger 8,00 bh
- Exit LED 2x5W c/w Battery nicad + Charger 2,00 bh
- Saklar tunggal, 10A 4,00 bh
- Saklar Ganda, 10A 4,00 bh
- Saklar Tukar (Hotel), 10A 2,00 bh
- Stop kontak 1 phasa, 13A 9,00 bh
- Instalasi penerangan terdiri dari ;
- Kabel NYM 3 x 2,5 mm² 744 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 276 bt
- Pipa Flexible PVC-HI dia.20 mm 139 m¹
- Klem Pipa PVC-HI dia.20 mm 184 bh
- Sambungan Pipa PVC-HI dia.20 mm 551 bh
- Instalasi stop kontak terdiri dari ;
- Kabel NYM 3 x 2,5 mm² 144 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 53 bt
- Pipa Flexible PVC-HI dia.20 mm 11 m¹
- Klem Pipa PVC-HI dia.20 mm 36 bh
- Sambungan Pipa PVC-HI dia.20 mm 107 bh
Sub Jumlah d
31
UP2B JAWA TIMUR
3.1 Lantai 1
a. Peralatan Utama Telepon (IPBX)
b. Terminal Box Telepon
TBT-1/HUB-K.1 (Kantor) : 100 Pairs 1,00 unit
TBT-2/HUB-K.2 (Kantor) : 80 Pairs 1,00 unit
c. Distribusi Kabel Telepon Dan Data
- Kabel dari TBU-IPBX ke :
- TB-PT.Telkom : ITC 20 x 2 Pair x 0,6 mm² 25,00 m¹
- TBT-1/HUB-K.1 : UTP CAT.6e, 4 Pair x 0,6 mm², 90L dan 25,00 m¹
ITC 100 x 2 Pairs x 0,6 mm2 25,00 m¹
- TBT-2/HUB-K.2 : UTP CAT.6e, 4 Pair x 0,6 mm², 70L dan 30,00 m¹
ITC 60 x 2 Pairs x 0,6 mm2 30,00 m¹
d. Instalasi Telepon Dan Data
Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi Telepon
lengkap dgn. jenis, type kabel, isolasi penyambungan kabel, pelindung kabel
(PVC-HI), junction box, berbagai jenis Outlet Telepon, inbow dus, dan klem
pipa kabel, serta accessories lainnya sesuai gambar rencana & spesifikasi
teknis.
- Outlet Telepon (RJ-11) 30,00 bh
- Outlet RJ45 (IP) 30,00 bh
- Outlet Type Lantai (RJ-11 & RJ-45 (IP)) 48,00 bh
- Instalasi Outlet Telepon & Outlet Data, terdiri dari ;
- Kabel Telepon ITP 2 Pair x 0,6 mm2 2.886 m¹
- Kabel Data & WiFi UTP CAT6e, 4 Pair 3.071 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 2.206 bt
- Pipa Flexible PVC-HI dia.20 mm 234 m¹
- Klem Pipa PVC-HI dia.20 mm 1.471 bh
- Sambungan Pipa PVC-HI dia.20 mm 4.413 bh
- Pesawat Telepon Dan Unit WiFi, jenis ;
- Analog 67,00 unit
- Digital 11,00 unit
- Unit Wifi 5,00 unit
3.2 Lantai 2
Instalasi Telepon Dan Data
Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi Telepon
lengkap dgn. jenis, type kabel, isolasi penyambungan kabel, pelindung kabel
(PVC-HI), junction box, berbagai jenis Outlet Telepon, inbow dus, dan klem
pipa kabel, serta accessories lainnya sesuai gambar rencana & spesifikasi
teknis.
- Outlet Telepon (RJ-11) 33,00 bh
- Outlet RJ45 (IP) 33,00 bh
- Outlet Type Lantai (RJ-11 & RJ-45 (IP)) 24,00 bh
- Instalasi Outlet Telepon & Outlet Data, terdiri dari ;
- Kabel Telepon ITP 2 Pair x 0,6 mm2 2.109 m¹
- Kabel Data & WiFi UTP CAT6e, 4 Pair 2.405 m¹
- Pipa PVC-HI dia.20 mm, panjang 2,7 m 1.672 bt
- Pipa Flexible PVC-HI dia.20 mm 171 m¹
- Klem Pipa PVC-HI dia.20 mm 1.115 bh
- Sambungan Pipa PVC-HI dia.20 mm 3.344 bh
- Pesawat Telepon Dan Unit WiFi, jenis ;
- Analog 48,00 unit
- Digital 9,00 unit
- Unit Wifi 8,00 unit
32
UP2B JAWA TIMUR
4.1 Lantai 1
a. Peralatan Utama Fire Alarm
MCFA System Conventional, Kapasitas 30 Zone 1 unit
lengkap dengan :
1. Announciator Aktif 30 zone
2. Battrey charger 30 Menit
3. Power supplay 220 V, 50 Hz
4. Sirine 90-150 dB 2 unit
5. Pesawat telepon (komunikasi pemadam kebakaran)
6. TBU-MCFA : 30 zone
7. Signal audio dari emergency tata suara (sound system)
8. Testing and commissioning
9. Accessories lainnya
b. Terminal Box Fire Alarm
TBF-1 : 10 Pairs 1,00 unit
TBF-2 : 10 Pairs 1,00 unit
c. Distribusi Kabel Fire Alarm
Pengadaan, pemasangan dan pengujian seluruh pekerjaan
distribusi kabel lengkap dengan jenis, type kabel, sepatu kabel,
PVC-HI (pelindung kabel), junction box, tanpa penyambungan, dan
accessories lainnya sesuai gambar rencana & spesifikasi teknis
- Kabel dari MCFA ke :
- TBF-1 : NYM 10(2 x 1,5 mm²) + NYM 3 x 1,5 mm² 55,00 m¹
- TBF-2 : NYM 10(2 x 1,5 mm²) + NYM 3 x 1,5 mm² 62,00 m¹
d. Instalasi Fire Alarm
Pengadaan, pemasangan dan pengujian seluruh pekerjaan instalasi fire alarm
lengkap dgn. jenis, type kabel, isolasi penyambungan kabel, pelindung kabel
(PVC-HI), junction box, berbagai jenis Detektor, Break galss switch, Lampu tanda,
dan Alarm bell serta inbow dus, dan klem pipa kabel, serta accessories lainnya
sesuai gambar rencana & spesifikasi teknis.
- Smoke Detektor (Photosel) 48,00 bh
- Fixed Head Detektor 15,00 bh
- Outlet Emergency Telepon 2,00 bh
- Break Glass Switch 5,00 bh
- Alarm Bell 5,00 bh
- Lampu Tanda 5,00 bh
- EOL (Resistor) 8,00 bh
- Instalasi Detector, Lampu Tanda, Alarm Bell terdiri dari ;
Kabel NYA 2 x 1,5 mm² 1.095,00 m¹
Pipa PVC-HI dia.20 mm, panjang 2,7 m 406 bt
Pipa Flexible PVC-HI dia.20 mm 110 m¹
Klem Pipa PVC-HI dia.20 mm 270 bh
Sambungan Pipa PVC-HI dia.20 mm 811 bh
- Instalasi Break glass switch & Flow Switch, terdiri dari ;
Kabel NYA 2 x 1,5 mm² 108,00 m¹
Pipa PVC-HI dia.20 mm, panjang 2,7 m 40 bt
Pipa Flexible PVC-HI dia.20 mm 9 m¹
Klem Pipa PVC-HI dia.20 mm 27 bh
Sambungan Pipa PVC-HI dia.20 mm 80 bh
33
UP2B JAWA TIMUR
5.1 Lantai 1
a. Peralatan Utama Tata Suara
Pengadaan, pemasangan dan pengujian seluruh pekerjaan Peralatan
Utama Tata Suara lengkap dgn. Mixer & Power Amplifier, Terminal
Box Utama, Mic.Module, Instalasi kabel pada peralatan utama Tata
Suara (Sound System) dan accessories lainnya sesuai gambar rencana
dan spesifikasi teknis.
- Peralatan Utama Tata Suara, lengkap dengan ; 1,00 unit
Mixer amplifier
Power amplifier 120 watt, 4 unit
Selector zone : 10 Zone
Audio prosesor unit
Dinamic Microphone + stand
Evacuation Sistem Cassette player
Signal audio dari MCFA
Radio Tuner
MP-3 Player
Exhaust fan
Rack cabinet
Testing commissioning
Material bantu
- Car Call System, lengkap dengan : 1,00 unit
Power amplifier 120 watt, 1 unit
Microphone + kontrol
Testing commissioning
Material bantu
- Material pendukung : 1,00 unit
Power supplay 220 V, 50 Hz
Battery nicad + charger 1 jam
b. Terminal Box Tata Suara
TBS-1 : 3 Zone 1,00 unit
TBS-2 : 3 Zone 1,00 unit
b. Distribusi Kabel Tata Suara
Pengadaan, pemasangan dan pengujian seluruh pekerjaan
distribusi kabel lengkap dengan jenis, type kabel, sepatu kabel,
PVC-HI (pelindung kabel), junction box, tanpa penyambungan, dan
accessories lainnya sesuai gambar rencana & spesifikasi teknis
34
UP2B JAWA TIMUR
6.1 Lantai 1
a. Peralatan Utama CCTV, terdiri dari ;
b. Distribusi Kabel CCTV & Access Control
Pengadaan, pemasangan dan pengujian seluruh pekerjaan
distribusi kabel lengkap dengan jenis, type kabel, sepatu kabel,
PVC-HI (pelindung kabel), junction box, tanpa penyambungan, dan
accessories lainnya sesuai gambar rencana & spesifikasi teknis
- Kabel Video dari NVR ke :
- TBCV-1 : UTP CAT6e, 4 Pair x 0,6 mm², 20L 55,00 m¹
- TBCV-2 : UTP CAT6e, 4 Pair x 0,6 mm², 12L 62,00 m¹
- Kabel Control dari Access Control ke :
- TBCV-1 : UTP CAT.6e, 4 Pair x 0,6 mm², 12L 55,00 m¹
- TBCV-2 : UTP CAT.6e, 4 Pair x 0,6 mm², 8L 62,00 m¹