This document provides a startup readiness update for MBDCO, Inc.'s Ju Bao Pen machine. It outlines 9 items needing attention before startup and the proposed solutions and statuses for each item, which are mostly in progress. Solutions include software updates, ordering replacement parts, and scheduling meetings with partners to ensure compliance. Lead times for delivering items range from 7 to 14 days. The update aims to address all necessary preparations for the machine to launch operations.
This document provides a startup readiness update for MBDCO, Inc.'s Ju Bao Pen machine. It outlines 9 items needing attention before startup and the proposed solutions and statuses for each item, which are mostly in progress. Solutions include software updates, ordering replacement parts, and scheduling meetings with partners to ensure compliance. Lead times for delivering items range from 7 to 14 days. The update aims to address all necessary preparations for the machine to launch operations.
This document provides a startup readiness update for MBDCO, Inc.'s Ju Bao Pen machine. It outlines 9 items needing attention before startup and the proposed solutions and statuses for each item, which are mostly in progress. Solutions include software updates, ordering replacement parts, and scheduling meetings with partners to ensure compliance. Lead times for delivering items range from 7 to 14 days. The update aims to address all necessary preparations for the machine to launch operations.
Inc.
Ju
Bao
Pen
–
Startup
Readiness
Update
–
March
20th
Item
Description
Ph
Proposed
Solution
Comment
Status
Chinese
Language
Changes
All
suggested
changes
have
been
made
GLI
has
been
notified
about
the
pending
and
are
currently
being
tested.
resubmission
and
the
need
for
a
quick
In
1
I
Will
be
submitted
to
GLI
for
approval
on
turn
around.
Progress
March
26,
2013
Machine
door
Sample
of
the
proposed
solution
to
arrive
Once
approved
it
will
take
7
to
10
days
to
Sound
board
cover
at
VML
on
March
20
for
testing
and
deliver
the
new
brackets
to
VML
In
2
Template
for
new
holes
I
approval
MBDCO
will
manage
the
install
and
Progress
drilling
of
the
new
holes.
3
Reset
Key
2341
I
Replacement
has
been
ordered.
Lead
Once
delivered
it
will
be
installed
by
VML
In
time
7
days
Progress
4
Paltronics
Overhead
Display
I
Meeting
with
Paltronics
Macau
scheduled
In
for
March
21st
to
verify
the
compliance
Progress
with
the
floor
network
5
Tower
Light
missing
I
Tower
Lights
have
been
ordered
and
will
Once
delivered
it
will
be
installed
by
VML
In
be
delivered
to
VML
in
7
days.
Progress
6
Quick
Set
Up
Manual
I
MBDCO
will
provide
a
Quick
Set
up
menu
In
for
the
VML
technicians.
Lead
time
7
days
Progress
7
Spare
Parts
I
MBDCO
is
preparing
to
ship
all
the
spare
Lead
time
14
days
In
parts
(10%
or
4
of
each
components)
Progress
listed
below:
1. Power
Supply
2. Touch
Screen
3. Second
Monitor
4. Bill
Validator
5. Printer
6. CPU
Box
with
all
boards
7. Buttons
(2x
Spin
Buttons)
8. Spare
Cams
(for
locks)
8
Player
Tracking
bracket
I
VML
arranging
for
new
bracket
Once
received
will
be
installed
by
VML
In
Progress
9
Software
Replacement
(new
item)
I
MBDCO
to
develop
a
procedure
for
Note:
all
SD
cards
are
numbered
and
In
replacement
of
software.
MBDCO
is
using
tracked
and
under
the
current
set
up
Progress
two
SD
cards
(Game
Software
&
MBDCO
will
not
be
able
to
offer
VML
the
Operating
Software
–
ICE).
ability
to
burn
new
SD
cards.