Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

DAILY WORK ACTIVITY REPORT

Project: Date: Day:


Weather Condition:

Legend:

Project Contract No. / Duration: 1 Fair


/ 2 Sunny
3 Rainy
4 Heavy Rain
5 Typhoon / Force Majeure
Area:

MANPOWER LOADING EQUIPMENT LOADING


Designation Plan Actual Absent Remarks Description Plan Actual Utilized Status Remarks

Total Total
ACTIVITIES
Accomp.
Item No. Description Phy. Equiv. Remarks / Problems Encountered
Prog. Qty.

Contractors Representative (Name of Contractor) Client Representative (EDC/ EPC-PPCD)

Prepared by: Noted by: Checked & Noted by:

____________________ ___________________
EDC Field Rep. EDC Procon Rep.

Original Copy (For Procon) Duplicate Copy (Structural) Triplicate (Contractor)

You might also like