SAUDI ARAMCO ID/PIEU-30-September-2018 - REV.2018.09.00 (Standards Cutoff - September 30,2018) Rev.2018.09.

00 30-Sep-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Field Bending for Pipelines SAIC-L-2114 21-Oct-18 BQ-SFNY-SITE-M-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
24"SAFANIYAH A/G HDPE WATER DISPOSAL TRUNKLINE 11-22000-2437 BIN QURAYA LIMITED CO.
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
24" SAFANIYA A/G TRUNKLINE 24"X0.875"WT.CS, PIPE METALLIC EXT.FBE N/A N/A G26
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
N/A N/A
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-L-450-03 3.6
SAUDI ARAMCO INSPECTION LEVEL
W
CONTRACTOR INSPECTION LEVEL
H
YES
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
A General Requirements

Composite bends having vertical and horizontal components, the overall SAES-L-450,
A1 bend radius conforms with:
Attachment 1( Appendix B-Table 1 of SAES-L-450) of this checklist. Para. 10.4
SAES-L-450,
A2 Cold wrinkle bends and field hot bends are not permitted.
Para. 10.6
Bends shall not be made closer than 600 mm from the edge of a field SAES-L-450,
A3
circumferential weld. App B, Par. B1.1

SAES-L-450,
A4 Bends are made using a smooth stretch bending machine.
App B, Par. B1.2

Maximum permissible localized bend or "bite" at one place on the pipe


SAES-L-450,
A5 and the minimum spacing of such bites conforms with:
App B, Par. B2.1
Attachment 1 (Appendix B-Table 1 of SAES-L-450) of this checklist.

Pipe diameter at any point of the preformed bend is not reduced by more SAES-L-450,
A6
than 2-½% of the nominal pipe diameter. App B, Par. B1.1

Hydraulic bending mandrels & polyurethane-lined bending dies or


equivalent equipment are used to prevent buckling in spiral-welded pipe. SAES-L-450,
A7
This shall be conducted with proper tools and performed with skilled App B, Par. B1.3
operators because spiral wound pipe is more prone to buckling.

For internally coated pipe, the bend angle per bite may be reduced to
minimize damage to the coating. (As a minimum, the internal coatings SAES-L-450,
A8
shall withstand the bends as per Attachment 1 of this checklist.) App B, Par. B1.4

Field Bends are free of buckles, dents, cracks, wrinkles, other mechanical
SAES-L-
A9 damage, or indentations. Cold wrinkle bends and field hot bends are not
450,Para.10.6
permitted

Final dimensions (angle, length and radius) of the preformed bends meet Approved
A10
the requirement dictated by actual Site / field measurements. Drawing (IFC)
REMARKS:

REFERENCE DOCUMENTS:
1. SAES-L-450, Construction of On-Land and Near Shore Pipelines, (28 Jan 2018)
2. 01-SAMSS-010, Fabricated Carbon Steel Piping, (9 July 2014)

ATTACHMENTS:
1. Table 1 - Maximum Localized Bends (refer to Item No. A1, A5 & Item No. A8)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

Saudi Aramco: Company General Use


QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-30-September-2018 - REV.2018.09.00 (Standards Cutoff - September 30,2018) Rev.2018.09.00 30-Sep-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Field Bending for Pipelines SAIC-L-2114 21-Oct-18 BQ-SFNY-SITE-M-

Attachment 1 - (Refer to Item No. A1, A5 & A8)

Saudi Aramco: Company General Use

You might also like