Professional Documents
Culture Documents
Transmittal 001
Transmittal 001
From
HCC-KEC Consortium
Plot 19 & 20, Indira priyadarshini nagar,
Perumbakkam,
Chennai-600100
To:
Transmittal No: HCC-KEC/282/C5E/2300001
The Team Leader & Engineer –in-Charge Date: 21-Nov-23
AEON Consoritum
Chennai Metro Rail Limited,
MetroS, 5th Floor,
No.327, Anna Salai, Nandanam,
Chennai- 600035
Comments:
Pursuant to Clause APPENDIX - 7B, sub section VII BIM Guidelines & Information Requirements, the Contractor (HCC-KEC Consortium) has developed the BIM model from the level
of LOO 300 to LOO 350 (As Built working file updated) herewith submitting the Complete BIM Model for the works progressing at the location mentioned above for the reference and
review of the Engineer-In-Charge.
The above-mentioned BIM model can be downloaded from BIM 360 portal.